NRC Operator Licensing Exam Rept 50-335/97-300 Administered on 970616-19.Exam Results:All Three SRO Passed Exam
ML17229A410
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/10/1997
From: Moorman J, Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17229A409 List:
References
50-335-97-300, NUDOCS 9707220408
Download: ML17229A410 (7)


See also: IR 05000335/1997300

Text

U. S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.:

50-335, 50-389

License Nos.:

DPR-67,

NPF-16

Report No.:

50-335/97-300

Licensee:

Florida Power and Light Company

Facility:

St. Lucie Plant Units 1 8 2

Location:

Jensen

Beach, FL

Dates:

June 16-19, 1997

Examiners:

J mes H. Moorman, III, Chief License Examiner

onald F. Aiello, License Examiner

D. Charles Payne,

License Examiner

Approved by:

Thomas A. Peebles,

Chief,

Operator Licensing and Human Performance

Branch

Division of Reactor Safety

9707220408

970710

PDR

ADQCK 05000335

V

PDR

EXECUTIVE SUMMARY

St. Lucie Plant Units 1 8 2

NRC Examination Report No. 50-335/97-300

During the period June 16 - 19, 1997, NRC examiners conducted an announced

operator

licensing initial examination in accordance

with the guidance of Examiner Standards,

NUREG-1021, Revision 7. This examination implemented the operator licensing

requirements of 10 CFR f55.41, f55.43, and f55.45.

~Oerations

Three Senior Reactor Operator (SRO) candidates

received written examinations and

operating tests.

All examinations were administered by NRC operator licensing

examiners.

The written examination was administered on June 16, 1997, and the

operating tests were administered June 17 - 18, 1997.

All candidates

passed the

examination.

(Section 05.1)

Candidate Pass/Fail

Pass

Fail 'RO

RO

Total

Percent

100%

0

During examination validation activities, minor procedure discrepancies

were noted.

(Section 08.1)

Plant Su

ort

During administration of the walkthrough portion of the examination, an examiner

noted that the allowable dose setting for the self-alarming dosimeter was less

conservative than the allowable dose stated on the applicable Radiation Work Permit.

(Section R1.1)

Re ort Details

Summa

of Plant Status

During the period of the examinations Unit 1 and Unit 2 were at 100 percent power.

I. 0 erations

05

Operator Training and Qualifications

05.1

Initial 0 erator Licensin

Examinations

NRC examiners conducted regular, announced operator licensing initial examinations

during the period June 16 - 19, 1997.

NRC examiners administered examinations

in

accordance

with the guidelines of the Examiner Standards

(ES), NUREG-1021,

Revision 7. Three SRO instant applicants received written examinations and

operating tests.

The NRC developed the SRO written examination and operating test in accordance

with the guidelines specified in NUREG-1021, Revision 7 and NUREG 0122,

Examiner Handbook for Developing Licensing Written Examinations, Rev. 5.

The written examination was reviewed and validated by members of the St. Lucie

training staff working under a security agreement.

The review was conducted

May 27-29, 1997 in the NRC Region 2 offices.

All portions of the operating test were reviewed and validated June 2 -4, 1997 using

the St. Lucie Plant Simulator.

The St. Lucie training and simulator support staff, under

security agreement,

provided assistance

with the review and validation.

Allthree candidates

passed the examination.

Candidate performance on the

operating test was acceptable.

08

IIiscellaneous Operations Issues

08.1

Examiner Observations

During the course of examination validation and administration, the examiners noted

minor discrepancies

in two of the licensees procedures.

Operating Procedure

No.

1-

070022, Rev. 38, Auxiliary Feedwater - Normal Operation and Off-Normal Operating

Procedure

1-070031, Rev. 13, Auxiliary Feedwater, Appendix E, both contain the

same set of instructions for cross-tying the 1A AFW pump to the 18 Steam Generator.

However, the ONOP instructions contain a caution relating to hP concerns when

using the crosstie and the OP did not. The licensee put this into their corrective

action program.

Operating Procedure 2-0250020, Rev. 28, Boron Concentration Control - Normal

Operation contains instructions for borating the plant while on shutdown cooling. The

examiners intended to develop a Job Performance

Measure using this procedure..

However, review of the procedure indicated that steps relating to alignment of portions

PARTIAL LIST OF PERSONS CONTACTED

Licensee

M. Allen, Training Manager

E. Benken, Licensing Engineer

D. Fadden, Services Manager

H. Johnson, Operations Manager

J. Martin, Simulator Services Manager

H. Mercer, Health Physics Technical Supervisor

K. Metzger, Operations Training Supervisor

J. Scarola, Plant General Manager

R. Weller, Operations Supervisor

NRC

M. Miller, Senior Resident Inspector

ITEMS OPENED, CLOSED, AND DISCUSSED

~Oened

50-335/97-300-01

IFI

Disagreement

between Merlin settings and RWP limits

Closed

None

SIMULATIONFACILITYREPORT

Facility Licensee:

Florida Power and Light - St. Lucie Plant

Facility Docket Nos.:

50-335 and 50-389

Operating Tests Administered on:

June 17 - 18, 1997

This form is to be used only to report observations.

These observations do not constitute

audit or inspection findings and are not, without further verification and review, indicative of

noncompliance with 10 CFR 55.45(b).

These observations do not affect NRC certification or

approval of the simulation facility other than to provide information that may be used in future

evaluations.

No licensee action is required in response

to these observations.

While conducting the simulator portion of the operating tests, the following items were

observed (if none, so state):

ITEM

DESCRIPTION

During the exam validation week, it was determined that the simulator did not properly model

the process for filling a Safety Injection Tank. The model was corrected prior to the exam

week.