Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A553 + (13:51:48, 8 January 2025)
- ML17275A552 + (13:51:49, 8 January 2025)
- ML17275A551 + (13:51:50, 8 January 2025)
- IR 05000397/1980009 + (13:51:51, 8 January 2025)
- ML17275A548 + (13:51:52, 8 January 2025)
- GO2-80-165, Forwards Revisions to Electrical,Instrumentation & Control Drawings Listed in Section 1.7 of Fsar.Amend 12 Will Reflect Revisions.W/O Encl + (13:51:53, 8 January 2025)
- GO2-80-185, Deficiency Rept Re Battery Charger Capacitor Failure. Condition Not Reportable Under 10CFR50.55e.Capacitors Exceeded Recommended shelf-life & Were Not Reformed Prior to Being Placed Into Svc.Procedures Will Be Revised + (13:51:54, 8 January 2025)
- GO2-80-184, Deficiency Rept Re Possible Inoperability of Borg-Warner Valves W/Limitorque Series Smc Operators.Identified Valves Will Be Reworked by Thread Staking Procedure.Schedule to Be Provided After Labor Negotiations + (13:51:56, 8 January 2025)
- ML17275A543 + (13:51:57, 8 January 2025)
- ML17275A544 + (13:51:57, 8 January 2025)
- GO2-80-182, Forwards Suppl 1 to Engineering Evaluation of WPPSS Unit 2 Sacrificial Shield Wall, in Response to Open Items Required for NRC Approval of Proposed Replacement Weld in Sacrificial Shield Wall.Affidavit Encl + (13:51:58, 8 January 2025)
- ML17275A542 + (13:51:58, 8 January 2025)
- ML17275A538 + (13:52:01, 8 January 2025)
- ML17275A537 + (13:52:02, 8 January 2025)
- ML17275A535 + (13:52:02, 8 January 2025)
- ML17275A534 + (13:52:03, 8 January 2025)
- ML17275A533 + (13:52:04, 8 January 2025)
- ML17275A531 + (13:52:05, 8 January 2025)
- ML17275A529 + (13:52:05, 8 January 2025)
- ML17275A523 + (13:52:07, 8 January 2025)
- ML17275A528 + (13:52:07, 8 January 2025)
- ML17275A522 + (13:52:08, 8 January 2025)
- ML17275A521 + (13:52:09, 8 January 2025)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 + (13:52:11, 8 January 2025)
- ML17275A519 + (13:52:12, 8 January 2025)
- ML17275A518 + (13:52:13, 8 January 2025)
- GO2-80-167, Forwards Engineering Evaluation of Unit 2 Sacrificial Shield Wall + (13:52:14, 8 January 2025)
- ML17275A514 + (13:52:14, 8 January 2025)
- ML17275A506 + (13:52:19, 8 January 2025)
- GO2-80-151, Answers Notice of Proposed Imposition of Civil Penalties Dtd 800617.Majority of Findings Reflect Deficiencies Found by Contractor,Util & NRC Region 5.Encl Exhibit a Details Protests Against Imposition of Certain Proposed Penalties + (13:52:20, 8 January 2025)
- ML17275A500 + (13:52:22, 8 January 2025)
- GO2-80-149, Responds to Round One Questions,Set 9,Questions 211.049 - 311.106 + (13:52:23, 8 January 2025)
- GO2-80-145, Forwards Status of Flued Head Containment Penetration Welds in Response to IE Bulletin 80-08.Work on Flued Heads Covered by ASME Code.Completed Welds Examined Radiographically. Defects Re Incomplete Fusion & Surface Porosity Repaired + (13:52:24, 8 January 2025)
- GO2-80-161, Interim Deficiency Rept Re Gaps & Voids in Sacrificial Shield Wall.Corrective Action Plan Described in . Implementation Is Pending NRC Concurrence + (13:52:26, 8 January 2025)
- CNL-17-126, Description of Changes in Revision 2 of the Cyber Security Plan + (13:52:28, 8 January 2025)
- ML17275A466 + (13:52:28, 8 January 2025)
- ML17275A462 + (13:52:29, 8 January 2025)
- ML17275A459 + (13:52:31, 8 January 2025)
- ML17275A458 + (13:52:32, 8 January 2025)
- ML17275A457 + (13:52:33, 8 January 2025)
- ML17275A456 + (13:52:34, 8 January 2025)
- GO2-80-148, Forwards Repts Referenced in NRC 800602 Question 360.005 + (13:52:35, 8 January 2025)
- ML17275A453 + (13:52:36, 8 January 2025)
- ML17275A451 + (13:52:37, 8 January 2025)
- ML17275A450 + (13:52:38, 8 January 2025)
- GO2-80-120, Forwards Revised Response to Violations Noted in IE Investigation Rept 50-397/79-10.Transient Analysis Indicates Matl Adjacent to Weld & Under Heating Blanket Were Not Excessively Overheated + (13:53:49, 8 January 2025)
- ML17275A449 + (13:53:49, 8 January 2025)
- CNL-17-125, Description of Changes in Revision 1 of the Sequoyah Nuclear Plant Cyber Security Plan + (13:53:51, 8 January 2025)
- ML17275A443 + (13:53:52, 8 January 2025)
- ML17275A442 + (13:53:53, 8 January 2025)
- CNL-17-124, Description of Changes in Revision 1 of the Browns Ferry Nuclear Plant Cyber Security Plan + (13:53:54, 8 January 2025)
- ML17275A438 + (13:53:55, 8 January 2025)