Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279A700 + (11:20:55, 8 January 2025)
- TAC:57517 + (11:20:56, 8 January 2025)
- ML17279A696 + (11:20:57, 8 January 2025)
- TAC:57281 + (11:20:58, 8 January 2025)
- ML17279A694 + (11:20:58, 8 January 2025)
- ML17279A693 + (11:20:59, 8 January 2025)
- GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date + (11:21:00, 8 January 2025)
- ML17279A682 + (11:21:02, 8 January 2025)
- ML17279A681 + (11:21:03, 8 January 2025)
- ML17279A680 + (11:21:04, 8 January 2025)
- ML17279A679 + (11:21:05, 8 January 2025)
- ML17279A676 + (11:21:06, 8 January 2025)
- ML17279A675 + (11:21:08, 8 January 2025)
- ML17279A672 + (11:21:09, 8 January 2025)
- ML17279A666 + (11:21:10, 8 January 2025)
- ML17279A665 + (11:21:10, 8 January 2025)
- ML17279A660 + (11:21:11, 8 January 2025)
- ML17279A662 + (11:21:11, 8 January 2025)
- GO2-87-278, Application for Amend to License NPF-21,modifying Snubber Functional Testing Sampling Plans,Per Guidelines of Draft Ansi/Asme - OM-4 Document, Exam & Performance Testing of Nuclear Power Plant Dynamic Restraints. Fee Paid + (11:21:12, 8 January 2025)
- TAC:88808 + (11:21:12, 8 January 2025)
- GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept + (11:21:16, 8 January 2025)
- ML17279A648 + (11:21:44, 8 January 2025)
- TAC:62181 + (11:21:45, 8 January 2025)
- ML17279A645 + (11:21:46, 8 January 2025)
- GO2-86-076, Application for Amend to License NPF-21,modifying Tech Spec 3/4.3.8 to Revise Turbine Valve Test Interval from Weekly to Monthly.Fee Paid + (11:21:48, 8 January 2025)
- ML17279A641 + (11:22:39, 8 January 2025)
- GO2-87-275, Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid + (11:22:41, 8 January 2025)
- GO2-87-273, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F + (11:23:19, 8 January 2025)
- ML17279A625 + (11:23:50, 8 January 2025)
- ML17279A623 + (11:23:51, 8 January 2025)
- 05000397/LER-1987-025, :on 870808,ESF Isolations & Actuations Occurred.Caused by Spurious Trip of Breaker Due to Oxide Formation on Coil Plunger End of Undervoltage Relay Coil. Breakers Replaced + (11:24:01, 8 January 2025)
- ML17279A620 + (11:24:02, 8 January 2025)
- IR 05000397/1987020 + (11:24:07, 8 January 2025)
- ML17279A617 + (11:24:09, 8 January 2025)
- IR 05000397/1987026 + (11:24:11, 8 January 2025)
- ML17279A614 + (11:24:13, 8 January 2025)
- ML17279A612 + (11:24:14, 8 January 2025)
- GO2-87-269, Revises Schedule Provided in Listed Ref Based on Discovery, During 1987 Insp,Of Crack in Low Pressure Turbine 1 + (11:24:15, 8 January 2025)
- ML17279A605 + (11:24:20, 8 January 2025)
- IR 05000397/1987024 + (11:24:21, 8 January 2025)
- TAC:56535 + (11:24:23, 8 January 2025)
- ML17279A596 + (11:24:24, 8 January 2025)
- 05000397/LER-1987-028, :on 870916,inadvertent ESF Actuation Occurred When Leak Detection Sys Temp Monitoring Unit Failed Causing Nuclear Steam Supply Shutoff Sys Group 8 Isolation.Caused by Component Failure.Isolation Logic Reset + (11:24:28, 8 January 2025)
- 05000397/LER-1987-029, :on 870916,discovered Plant Tech Spec fire- Rated Floor Penetration Impaired Since 860510.Caused by Inadequate Training on Fire Protection Barrier Identification.Training Provided to Staff + (11:24:31, 8 January 2025)
- ML17279A593 + (11:24:32, 8 January 2025)
- GO2-87-262, Forwards Rev 3b to Pump & Valve Inservice Test Program Plan. Rev Incorporates Changes in Plan Due to Recent Design Changes to Plant,Including Info Available as of 870930.Fee Paid + (11:24:34, 8 January 2025)
- ML17279A590 + (11:25:12, 8 January 2025)
- GO2-87-265, Application for Amend to License NPF-21,adding Note to Table 3.3.7.5-1 to Allow Single Acoustic Monitor to Be Inoperable Until Plant Shuts Down for Next Scheduled Refueling Outage or Outage of Sufficient Duration to Effect Repair.Fee Paid + (11:25:13, 8 January 2025)
- TAC:56947 + (11:26:00, 8 January 2025)
- GO2-87-258, Withdraws 850220 Request for Exemption from LER Reporting Requirements for Chlorine Monitor Tape Depletion & Spurious High Delta Flow.Exemption No Longer Necessary + (11:26:01, 8 January 2025)
- GO2-87-257, Reactor Containment Bldg Integrated Leak Rate Test + (11:26:23, 8 January 2025)