Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17284A633 + (11:07:40, 8 January 2025)
- ML17284A632 + (11:07:41, 8 January 2025)
- ML17284A630 + (11:07:42, 8 January 2025)
- ML17284A629 + (11:07:43, 8 January 2025)
- GO2-98-090, Submits Amended Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (11:07:44, 8 January 2025)
- ML17284A626 + (11:07:44, 8 January 2025)
- GO2-98-087, Documents Util Outage Schedule Change & That Licensee Has Performed SE in Support of Current Outage Plan,Per 980416 Request for Amend Re ECCS Suction Strainers + (11:07:46, 8 January 2025)
- GO2-98-088, Informs That Licensee Plans to Continue to Participate in Joint Owners Group MOV Periodic Verification Program as Member of Bwrog,In Response to GL 96-05 + (11:07:49, 8 January 2025)
- GO2-98-089, Responds to NRC Re Violations Noted in Insp Rept 50-397/98-05.Corrective Actions:Event Notification Was Made to NRC Upon Discovery That HPCS Injection Had Occurred Subsequent to 980311 Scram + (11:07:50, 8 January 2025)
- GO2-98-086, Informs That Noted Action Re Insp Rept 50-397/97-13 Was Completed on 980511 When Final Ack from off-site Member of Corporate Nuclear Safety Review Board Was Received + (11:07:52, 8 January 2025)
- GO2-98-082, Forwards Results of Linear Elastic Fracture Mechanics Analysis & ASTM A262 Practice E Test (Strauss Test) as Addl Info to 980416 Request for Amend to License NPF-21 + (11:07:55, 8 January 2025)
- ML17284A617 + (11:07:55, 8 January 2025)
- ML17284A613 + (11:07:57, 8 January 2025)
- ML17284A611 + (11:07:59, 8 January 2025)
- ML17284A610 + (11:08:00, 8 January 2025)
- ML17284A609 + (11:08:01, 8 January 2025)
- GO2-88-225, Responds to Kirsch Request for Plans for Periodic Assessment of SALP Action Plan.Plan Will Be Part of Agenda for Quarterly Mgt Meeting,Tentatively Scheduled to Be Held on 870105 + (11:08:02, 8 January 2025)
- ML17284A607 + (11:08:02, 8 January 2025)
- TAC:67082 + (11:08:04, 8 January 2025)
- ML17284A601 + (11:08:06, 8 January 2025)
- IR 05000397/1988030 + (11:08:10, 8 January 2025)
- ML17284A598 + (11:08:12, 8 January 2025)
- IR 05000397/1988032 + (11:08:33, 8 January 2025)
- ML17284A596 + (11:08:34, 8 January 2025)
- ML17284A595 + (11:08:35, 8 January 2025)
- ML17284A593 + (11:08:36, 8 January 2025)
- ML17284A592 + (11:08:37, 8 January 2025)
- ML17284A591 + (11:08:38, 8 January 2025)
- IR 05000397/1988029 + (11:08:41, 8 January 2025)
- ML17284A587 + (11:08:42, 8 January 2025)
- ML17284A586 + (11:08:43, 8 January 2025)
- GO2-88-229, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-33.Corrective Actions:On 881011,test Performed to Determine Dynamic Flow Control Characteriztics of Sample Rack REA-SR-37.Procedure Modified + (11:08:44, 8 January 2025)
- GO2-88-222, Submits Revised Response to Insp Rept 50-397/88-16 Re Fire Protection & Safe Shutdown Capability.Fire in Drywell Expansion Gap Has Very Low Probability of Starting + (11:08:46, 8 January 2025)
- ML17284A583 + (11:08:50, 8 January 2025)
- GO2-88-221, Application for Amend to License NPF-21,revising Tech Spec Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation to Reflect Mods in Sys Configuration & Operation.Fee Paid + (11:08:51, 8 January 2025)
- ML17284A582 + (11:08:51, 8 January 2025)
- ML17284A579 + (11:08:54, 8 January 2025)
- GO2-88-215, Forwards Addl Info Re Equipment Qualification to Help Clarify Util Position & Prevent Misunderstanding.Responses to Potential Enforcement/Unresolved Items Also Encl + (11:08:55, 8 January 2025)
- IR 05000397/1988020 + (11:08:58, 8 January 2025)
- GO2-88-220, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-27.Corrective Actions:Plant Procedure 4.12.4.5, Design Basis Ash Fallout, Revised to Better Define When & How Filters Should Be Replaced + (11:08:59, 8 January 2025)
- GO2-88-217, Responds to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Evaluation of Reactor Vessel Matls, Per Reg Guide 1.99,Rev 2 Underway.Pressure/Temp Curves Will Be Revised + (11:09:01, 8 January 2025)
- ML17284A571 + (11:09:03, 8 January 2025)
- ML17284A568 + (11:09:04, 8 January 2025)
- GO2-88-214, Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10 + (11:09:05, 8 January 2025)
- IR 05000397/1988038 + (11:09:08, 8 January 2025)
- ML17284A563 + (11:09:09, 8 January 2025)
- ML17284A562 + (11:09:11, 8 January 2025)
- ML17284A561 + (11:09:12, 8 January 2025)
- ML17284A559 + (11:09:13, 8 January 2025)
- GO2-88-216, Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training + (11:09:14, 8 January 2025)
- ML17284A558 + (11:09:14, 8 January 2025)