91FTRIBUTION
DEMONSTRA,T105
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8811160348
DOC.DATE: 88/10/27
NOTARIZED: NO
DOCKET ¹
FACIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
RTIN,J.B.
Region
5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
OXSENFA.L.
Washington Public Power Supply System
SUBJECT:
Forwards
Insp Rept 50-397/88-32
on 880829-0930
6 notices of
violation
a deviation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR /
ENCL 3
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB
11
NRR/DOEA DIR ll
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
RMANFJ
REG FI
02
ERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
.
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
NRR MORISSEAUFD
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGNS
FILE
01
NRC
RESL MARTIN,D
COPIES
LTTR ENCL
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE 'IO ALL "RIDS" RECIPIENTS:
PIZASE HELP US TO REDUCE KQ'DDEi
CCgZACT 'IHE DOCUMENZ CONSOL DESKI
RCCM Pl-37
(EXT. 20079)
TO ZZZHI32QTE YOUR NAME PRCH DISTRIBUTION
LISTS FOR DOCX2%ÃIS YOU DQNIT NEEDf
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
Docket No. 50-397
OCT 2 7
1988
Washington Public Power Supply System
P. 0.
Box 968
3000 George
Way
Richland,
99352
Attention:
Mr. A. L. Oxsen
Assistant
Managing Director for Operations
Gentlemen:
Subject:
NRC Inspection of Nuclear Plant
No.
2
This letter refers to the inspection
conducted
by Messrs.
C.
W. Caldwell
and
C. A. Clark of this office on August 29 through'eptember
30,
1988, of
activities authorized
by
NRC License
No.
and to the discussion of our
findings held
by the inspectors
with Messrs.
Bouchey and Baker,
and other
members of the Supply System staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
,
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that
some of your
activities were not conducted
in full compliance with NRC requirements
as set
forth in the Notice of Violation and Notice of Deviation, enclosed
herewith
as
Appendices
A and
B respectively.
Your response
to these
Notices is to be submitted in accordance
with the
provisions of 10 CFR 2.201
as stated
in Appendix A, Notice of Violation, and
Appendix B, Notice of Deviation.
In addition to the discrepancies
identified in the Notice of Violation, the
potential for the nonconforming installation of your control rod hydraulic
control units
was originally brought to your attention
letter, dated October 20,
1986,
and later by
NRC Information Notice No. 87-56,
dated
November 4,
1987.
During this inspection, it was identified that
a
walkdown, performed in January
1988, of the hydraulic control units found
several
discrepancies
which were not documented
in a nonconformance
report
and
which remained
uncorrected
at the time of the inspection.
These discrepancies
still had not received
an adequate
seismic
and operability evaluation
as of
September
23,
1988,
and remained
uncorrected
and unresolved until September
30,
1988,
when yo'ur Plant Operating
Committee approved
a Justification for
Continued Operation for the last remaining nonconforming condition.
The lack of aggressive
action to resolve the hydraulic control unit concerns
raises
serious
questions
regarding
the implementation of your processes
for
evaluating
vendor information and industry experience
(Operating
Experience
Review (OER) Program), effecting timely corrective action for discrepancies,
and assessing
questions
of safety
system operability.
8811160348
881027
ADOCK 05000397
Q
PNU
Accordingly, we request,
in addition to your responses
to the Notices
discussed
above, that you evaluate
these
processes
and provide the results of
your assessment,
identifying needed corrective actions to this office"within
30 days of the date of this letter.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincere3g,
J.
B. Martin
Regional Administrator
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection
Report
No. 50-397/88-32
'cc w/
G.
D.
G.
C.
C.
M.
A.
G.
G.
E.
N. S.
State
enclosures:
Bouchey,
Sorenson,
Powers,
Hosier,
Doupe, Esq.,
Reynolds,
Esq.,
BCPSR
of Washington
bcc w/enclosures:
Resident
Inspector
Project Inspector
G.
Cook
B. Faulkenberry
J. Martin
T. Foley,
docket file
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the accompanying
and Notice of Deviation are not subject to the clearance
procedures
of the
Office of Management
and Budget
as required
by the Paperwork
Reduction Act of
1980,
PL 96-511.
bcc w/o enclosure
3:
M. Smith
J. Zollicoffer
-3-
REGI0N v/080~
I'Ca1
dwe 1
C
ar
PJ
n
SRichards
- RZAk rman
10/@/88
10//C/88
10/~/88,
10/~88
10/8 V88
REQUEST
Y ]
EST
COPY ]
E
COPY ]
R
COPY ]
g
COPY
YES /
0
ES /
NO
YES
NO
ES /
NO
Y
/
NO
ate
10
/88
AChafPee
10 ~88
DKi
ch
10/~
AJoh
on
10/g/88
JMar
n
/88
RENDU
Y ] RE/VEST
]
S
COPY ] REQUEST
Y ] REEVES
P ']
YE
/
NO
YES /
NO
YE
/
0
YES /
NO
YES /
NO
(~AM@
/I e~)
TO
]
ES /
NO