ML17284A563

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Rept 50-397/88-38 on 880825 Re Salp. NRC Had Number of Concerns W/Util Performance in Areas of Operations,Engineering & QA During SALP Period
ML17284A563
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/07/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A564 List:
References
NUDOCS 8810240025
Download: ML17284A563 (3)


See also: IR 05000397/1988038

Text

ACCESSION NBR: 8810240025

DOC. DATE: 88/10/07

NOTARIZED: NO

.FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

AUTH.NAME

AUTHOR AFFILIATION

MARTIN,J.B.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

MAZUR,D.W.

Washington Public Power Supply System

SUBJECT:

Forwards Mgt Meeting Rept 50-397/88-38

on 880825 re SALP.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE

TITLE: General

(50. Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

'C CELZRATZD

MSTRIBUTION

DEMONSTRATION

SYSTEM'EGULATORY

INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET

05000397

RECIPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERMAN,J

EG PI~

02

5

FILE

01

EXTERNAL:~PDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

'

1

1

1

1

RECIPIENT

ID

CODE/NAME'AMWORTH,R

AEOD

NRR MORISSEAU I D

-NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RES/DSIR

DEPY

NRC 'PDR

COPIES

LTTR ENCL

1

.

1

1

'

1

1

1

1

1

1

1

1

1

'1

1

1

1

1

1

1

A

NCTE TO ALL RIDS" RZCIPEPIS:

S

A

PZZASE HELP US TO EDUCE HASTE

CXRZLGT THE DOQ3MEWZ COPZROL DESKI

RXN Pl-37

(EZT. 20079)

TO EZZKCNATE YOUR NAME FROM DISTRIBUTION

LISTS H2t DOCUMENIS YOU DGN~T NEEDf

TOTAL NUMBER OF 'COPIES. REQUIRED:

LTTR

24

ENCL

.

24

Docket No. 50-397

Washington Public

Power Supply System

P.

O.

Box 968

3000 George

Washington

Way

Richland, Washington

99352

Attention:

Mr. D.

W. Mazur

Managing Director

Gentlemen:

Subject:

Management

Meeting with the Washington Public Power Supply

System

Board of Directors

This refers to the Management

Meeting which was held on August 25,

1988 in

Portland,

Oregon with the Washington

Public Power Supply System

(WPPSS)

Board

of Directors concerning

the Systematic

Assessment

of Licensee

Performance

(SALP)

Report.

Also in attendance

were

members of the Supply System staff and guests

from Boneville Power Administration and the State of Washington.

The purpose

of this meeting

was to discuss

the plant's

performance

during the

SALP period

of June I, 1987 through

May 31,

1988 of activities authorized

by

NRC License

NPF-21.

Subjects

discussed

during the meeting are

summarized

in the enclosed

me~ng report 50-397/88-38.-

The

NRC had

a number of concerns with Supply System performance

in the areas

of

Operations,

Engineering,

and guality Assurance

(gA) during the

SALP period.

These

concerns

appeared

to have

common causes

of insufficient management

involvement in activities

and insufficient follow through

on commitments

and

corrective actions.

These

concerns

received special

emphasis

in our discussions

during the meeting.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this meeting,

we will be glad to

discuss

them with you.

Sincerely,

J.

B. Martin

Regional Administrator

SS10240025

SS1007

PDR

ADOCK 05000397

9

PDC

Enclosure:

Inspection

Report

No. 50-397/88-38

cc w/enclosure:

C. Halverson,

WPPSS

R.

F. Mazurkiewicz,

BPA

C.

M. Powers,

WPPSS

R. B. Bouchey,

WPPSS

G.

E. Dovpe, Esq.,

WPPSS

A. L. Oxsen,

WPPSS

State of WA

N. S. Reynolds,

Esq.,

BLCPSR

RV

CC

11

10/7 /88

ohnson

10/g /88

RZiom

10/g

e man

DKirs

/88

10+ /88

JM

in

/ -/88

UEST

C

PY

ES /

NO

UEST

COPY

EST

C

PY

RE

VEST

C

PY

YES /

NO

ES /

NO

ES /

NO

g

ST

C

PY

YES /

NO

ES /

NO

bcc w/enclosure:

Project Inspector

Resident

Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

T. Foley,

NRR

bcc w/o enclosure:

J. Zollicoffer

M. Smith