Monthly Operating Rept for Oct 1988 for Washington Nuclear Plant 2
ML17284A592
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811150431
Download: ML17284A592 (10)


Text

A.CCEIZM.TED D387KBU'EON DEMONSYR TIDE SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)

ACCESSION NBR: 8811150431 DOC. DATE: 88/10/31 NOTARIZED: NO FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHXSON,L.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECXP.NAME RECIPXENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1988 for Washington Nuclear Plant.W/881107 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR f

ENCL L SIZE:

TITLE:.Monthly Operating Report (per Tech Specs)

NOTES:

DOCKET 05000397 R

ii' RECIPIENT XD CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR PB 10 FXLE Ol EXTERNAL:

EGGG SXMPSON, F LPDR NSIC COPXES LTTR ENCL 1

0 1

0 10 10 1

1, 1

1 1

1

. 1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EGGG WILLIAMS,S NRC PDR COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 h

D D

S NOTE TO ALL "RIDS" RECIPIEPIS:

PLEASE HELP US TO REDUCE TIQSTE CXRKACX 'XSE DOQ3MEtfZ COEQUAL DESKI RKM Pl-37 (EXT. 20079) K) EI4XMXNATE YOUR NME PMH DISTRIBUTION LISTS POR DOCUK268 YOU DGNIT NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30

OPERATINB DATA REPORT WNP-2 01-Nov-88 1.

DOCKET: 50-397 2 ~

REPORTINB PERIOD:

UTILITY CONTACT:

Oct-88 OUTAGE ~ ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 745 4.

LICENSED THERMAL POWER (MWt):

5.

NAMEPLATE RATING (GROSS MWe):

6.

DESIGN ELECTRICAL RATING (NET MWe):

7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

3323 1200 '

1100 1140 1095 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONS:

10.

POWER TO WHICH RESTRICTEDs IF ANY (NET MWe):

il. REASONS FOR RESTRICTIONSs IF ANY:

N/A N A 12.

13.

14 15 ~

16 17.

18

'9

'0.

21

'2

'3

'4

'5

'EPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHTDWN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)

GROSS ELECTRICAL ENERGY (MWH)

NET ELECTRICAL ENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITY FACTOR (MDC NET)

UNIT CAPACITY FACTOR (DER NET)

UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 745 705.1 0.0 697.0 0.0 2196000 727370 702101 93.6/

93.6/

86.1/

85.7/

0.0/

0 '

YEAR 7320 5023.5 0.0 4767.6 0 ~ 0 14751638 4884210 4714247 65.1/.

65. 1/

58.8/

58.5/

14.9/

837.6 CUMULATIVE 34040.2 24930.3 340.4 23909.5 381 '

65134405 21701350 20882199 70'/

71.4/

56'/

55'/

9.4/

2482.7

'6 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEsDATEsDURATION)

REFUELING OUTAGE OF 45 DAYS DURATION SCHEDULED TO START 4/14/89..:

27 IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

N/A 8811150431 881031 PDR ADGCK 05000397 R

PDC

r

~4 V

lk U

4

'K

REPCAT, PERICO OCTOBER >9~8 man th, year.

LAIT SILUTDOWS / REOUCTIONS UUt.KI=I Nu.

vu"avi UNIT NlNE 11/1 88 COMPLETED BY LB HUTCHISON TELEPl ONE (509) 377"2486 BK D~K lit'E MOIRAI BEAsK MERE 88"14 10/27/88 S

47.97 A

1 N/A Vil1 tu.lRPff

<<SE HB PIPEXX A PLANT HAS SHUT DONN DUE TO A CRACKED MELD IN A MAIN STEAM LINE DRAIN TO A TRAP STATION.

REPAIRS HERE MADE AND THE PLANT RETURNED TO SERVICE.

SUhtfARY WNP"2 INCURRED 1 SCHEDULED OUTAGE IN OCTOBER AS DESCRIBED ABOVE.

TYPE F-Forced S-chad A-Equip Failure 0-Maint or Test

~

C-Ref ue ling 0-Regulatory Restriction E-Operator Training

& License Examination F-Admin G-Oper Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM & COMPOhCNT Exhibit F & H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LER) File (NUnEG-Oia)

p 4t

~ ~

~ Z ~

4

~

~

~ 'he,

~ '."

~ ) '

1

.,li:)a -il % dt i

~

~

~. '

a ~

(n'. ~ ~ r ~

v

~ i'a k.1,

..='

DOCKET NO.

50"397 C

REPCAT. PERIOD OCTOBER 19~8

mcnth, year LNIT SllUTDONNS / REDUCTIONS UNIT NAME DATE 11/1/88 COhlPLETED SY LB HUTCHISON TELEPllONE (509)377"2486

'IIPE elm REAs%

M~M~MM 88-14 10/27/88 S

47.97 A

1 tEC1Kl E

Y '<<ll tl. -lRlV N/A HB PIPEXX A PLANT WAS SHUT DOWN DUE TO A CRACKED WELD IN A MAIN STEAM LINE DRAIN TO A TRAP STATION.

REPAIRS WERE MADE AND THE PLANT RETURNED'TO SERVICE.

SUhWARY WNP"2 INCURRED 1 SCHEDULED OUTAGE IN OCTOBER AS DESCRIBED ABOVE.

TYPE F-Forced S-Schcd A-Equip Failure 0-Maint or Test

~

C-Ref ue ling 0-Regulatory Restriction E-Operator Training h License Examination F-Admin 0-Oper Error H-Other I-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM h COMPONENT Exhibit F h H Instructions for

'reparation of Data Entry Sheet Licensee Event Report (LER) File (NUREG-0161)

~

~

~, ~ 'P I

'k h

~'IVI'p lg

.1 %t'

'4 ~ >A ll"I j ~

tC a

A h

la I,

A.

t%

AVERAGEDAILYUMTPOWER LEVEL DOCKET NO.

.UNlT~

11/1/88 OMPLETED BY LB HUTCHISON Ti!L!!PHD!!!!~!

MONTH OCTOBER 1988 DAY. AVERAGEDAILYPOWER LEVEL (MWe-Net) 1074 1076 1043 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 1075 17 1078 1074 5'049 1047 20 1062 105 1070 7

10 897 1054 1062 1068 2S 1067 1070 1065 559 1059 1044 1045

  • 25 HOUR DAY DUE 'TO CHANGE 'TO STANDARD TIYiE.

TOTAL GENERATION FOR 25 HOURI DAY HAS 17086 llMHe.

INSTRUCTIONS Pn this form, list the average daily unit power level in MWeAet for each day in the reporting month. Compute to the nearest whole megawatt.

1hese Qgures will be used to piot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the. unit, there may be occasions when the daily average power!evel exceeds the l00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

I'I>> bl 4>>

I ~ 4

~

7 7 g'I

~ >>'

1>> ~ '>>

l felt>>

I t

>>I l ~

7

",4>> C>>>>

I I

~,

~

~

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 November, 7, 1988 U.S.

Nuclear, Regulatory Commission Document Control Desk Washington, D.C.

20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, October, 1988 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, 8~4.

C. N. Powers (N/D 927M)

WNP-2 Plant Manager CNP/lc Enclosure cc:

Nr,.

Mr.

Ms.

Nr,.

Nr..

J.

B. Martin C. J.

Bosted Dottie Sherman J. T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI, Farmington CT INPO NRC, Washington D.C.

,gs>

p0 1 f

~

~

~.

1 t