Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML17284A5831988-09-29029 September 1988 Forwards Final Rept of G Wehmann of Bnwl Participation in 870912-13 Emergency Preparedness Exercise ML17276B0731982-02-10010 February 1982 Comments on Const of Two Power Reactors by Skagit/Hanford Nuclear Project at Hanford.Purchasing & Finishing Terminated Wppss Plants at Hanford & Satsop Should Be Considered as One Alternative to Proposed Action ML17275B1671981-07-16016 July 1981 Forwards photo-ready Mats for Facility Des,Ol Stage & Reduced Fes,Cp Stage.Lists NRC Matl Needed ML19340B1411980-10-14014 October 1980 Requests Load Info Re Design Pressure,Loca & SSE Loads & Drawings for Five Containment Vessels Referred to in Statement of Work for FY81 1988-09-29
[Table view] |
Text
AC CELEBRATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8811070002 DOC.DATE: 88/09/29 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION JAMISON,J.D. Battelle Memorial Institute, Pacific Northwest Laboratory RECIP.NAME RECIPIENT AFFILIATION GOOD,G.M. Region 5, Ofc of the Director
SUBJECT:
Forwards final rept of G Wehmann of PNL participation in 870912-13 emergency preparedness exercise. R DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR + ENCLl SIZE:
TITLE: Emergency Preparedness-Appraisal/Confirri@tory Action Ltr/Exercise Rep NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 SAMWORTH, R 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DREP/EPB 10 1 1 A N ILRB12 1 1 NUDOCS-ABSTRACT 1 1 02 1 1 RGN5 FILE Ol 1 1 RGN2/DRSS/EPRPB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 I.
9 NOTE KO ALL "RIDG" RECIPIlWlS:
4 PLEASE HELP US 'IO REDUCE %ASTB.'ONZACZ 'IHE DOCUhKÃZ CONGEAL DESK, RXM P1-37 (EZZ. 20079) KO EIZKQCCR KRR MHE PKH DISI%KBVZIGN LISTS MR DOCUMENZS YOU DONiT NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11 I
'".".'.Balelle Pacific Northwest Laboratories P.O. Box 999 Richland, WashingLon U.S.A. 99352 AJI: 06 Telephone(509) a/5-3782 Telex 15-2874 Facsimile (509) 375.2718 September 29, 1988 Ms. G. M. Good U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, CA 94596
Dear Gail:
WNP-2 EXERCISE, SEPTEMBER 12-13, 1987 Enclosed is the final report of George Wehmann who was the Pacific Northwest Laboratory (PNL) participant during the subject exercise. 'Only minor changes have been made to the draft given to you prior to his leaving the site. The areas covered by'r. Wehmann included the Operational Support Center (OSC) and the Field Team il(2.
If you have any questions regarding this report, please contact me on FTS (509) 375-3782.
Sincerely, J. D. Jamison, Project Manager Operational Health Physics Occupational 8 Environmental Protection Section HEALTH PHYSICS DEPARTMENT JDJ/chb Enclosure cc: WD Travers, w/enclosure LC Ruth, w/enclosure 831l070002 380929 PDR ADOCK 0 000397 F PDC
WNP-2 EMERGENCY PREPAREDNESS EXERCISE September 12-13, 1987 A. Name: George Wehmann Op i 1 S pp C (OSC), Fi Id T &2 C. Site Personnel Contacted: D. Anderson, Safety Marshall; L. Sharp, Principal Engineer; J. Fulfer, Maintenance Engineer; R. Tanska, Senior Trainer; J. Kleam, Shop Coordinator, Electrical Maintenance; F. Bartel, BPA Oversite Team; C. Eggen, Principal Fire Protection Engineer; J. Massey, Senior Technical Engineer; and T. Hull, Senior Training Specialist.
D. Positive Findin s
~ The organization and implementation of the re-entry team program permitted the OSC to carry out this function in an efficient and timely manner.
E. Ne ative Findin s
~ The OSC failed'o notify other ERFs of carbon filter failure.
~ Security took 20 minutes to deliver requested computer printouts and visitor logs to OSC, reducing OSC's time to perform accountability check to 15 minutes.
~ The method of notifying OSC workers to take KI (simulated) was inadequate. Two verbal announcements by the OSC Director cannot be considered to be a positive method of notification to all OSC staff members.
~ Security officers responding to unlock Building 17 at about 12:30 pm did not wear anti-C's nor did they have a radiological technician with them.
I' f,
Role of these officers is not clear but it was assumed they were players.
~ Field team survey techniques would have contaminated instrument probes during ground level radiation survey since the probe made contact with various types of vegetation.
~ Some simulations that were not identified in the scenario were utilized by players. For example; 1) re-entry teams did not remove outer clothing when suiting up; 2) the lobby of service building was 3 R/hr by scenario but was apparently exempted to allow teams to suit out in this area.
F. ~Ch Time Observation Day 1 0630 Arrived at OSC.
0636 Public address announcement (PA) exercise has started.
0654 PA: NUE due to high winds.
0719 PA: "Alert" due to )100 mph winds.
, 0/30 OSC Director asks everyone to sign in.
0731 Computer printout requested from security by OSC accountability staff.
0736 OSC Director announced that OSC is operational.
0751 Printout received from security.
0805 Accountability reported complete.
0838 Site Area Emergency declared. Protected Area controlled evacuation ordered.
0843 PA all evacuees report to OSC.
Time Observation 0901 OSC Director provides instructions to evacuees on what gate to take. Only one problem -- no evacuees.
0951 OSC Director - first announcement to take KI tablets.
Radiation survey of OSC - 100 mR/hr at window, 5 mR/hr at door.
Re-entry team personnel move to near nurses station.
1135 Finally posted high radiation area near windows.
1231 Radiation survey - 3 R/hr at window 15 mR/hr at door - didn't move radiation barrier.
1245 Finally'moved one end of barrier,3 feet for increase of 100 mR/hr to 3 R/hr.
1251 Team dress-out in an area of 3 R/hr observed. Controller had to tell Radiation Technician the dose level. Still little concern.
1309 Another team dressing out in 3 R/hr field.
1315 OSC Lead Controller informs me that suit-up area is exempt from 3 R/hr area.
Day 2 0915 Leave EOF with field team 2.
1340 Returned from field.
G. Follow-u on Previous Ins ection Findin s Ins ection Re ort 92701:
0 en Item 87-20-03:
The ability of the licensee to perform the accountability process within their stated time constraint (30, minutes after OSC becomes operational) remains questionable. Present procedures allow Security 30 minutes to deliver the computer printouts and visitor logs to OSC, thus, it is conceivable that OSC would not be able to meet their time line.
SUPPLEMENT TO SECTION E. NEGATIVE FINDINGS Due to the scenario for this exercise, it was anticipated that the radiological impact upon the OSC would be significant. As a result, considerable emphasis was placed upon observing the licensee's radiological responses. The evaluator noted that a number of health physics procedures and/or practices were not followed. Each of these, by itself, would not have precluded effective implementation of this portion of the emergency plan.
However, when taken collectively, they indicate a weakness that could seriously affect the licensee's response to an, actual emergency. The following examples are symptomic of the overall problem:
- 1) Radiological members of two different re-entry teams did not follow suit-up procedures.
- 2) It took 24 minutes to post the High Radiation Area in the OSC (near windows) after the radiation survey was made.
- 3) The Radiation Technician accompanying one re-entry team did not demonstrate the proper use of a survey instrument.
- 4) No smears or air samples were taken in the OSC following the release of radioactive material into the plant or environs.
- 5) OSC staff remaining within the OSC were never reminded to check their dosimeter, even when the dose rate at one end of the room was 3 R/hr.
- 6) Racks of spare dosimeters were left within 10-15 feet of the 3 R/hr area.
- 7) A number of the routine radiation surveys were made with a "ho-hum" attitude.
- 8) Two women were allowed to continue to sit within 15-18 feet of the 3 R/hr area.
- 9) Contamination control points were not established at the Service Building and the OSC entrance.
- 10) The HP Technician in OSC made no attempt to perform a detailed radiation survey after being told the dose rate at the window was 3 R/hr and 15 mR/hr.'rofessional health physics practices would dictate a more comprehensive survey within the room.
- 11) Once aware of the 3 R/hr dose rate near the window, the HP Technician did not make any effort to determine the source of the radiation, i.e.,
was it due to sky shine, ground deposition or airborne material.