| Site: | Columbia |
| Issue date: | 10/06/1988 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17284A569 | List: |
| References | |
| NUDOCS 8810240189 | |
| Download: ML17284A568 (4) | |
See also: IR 05000397/1988031
Text
AOCELERATED
DISIRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8810240189
DOC.DATE: 88/10/06
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
MARTIN,J.B.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
MAZUR,D.W.
Washington Public Power Supply System
SUBJECT:
Forwards
SALP Meeting Rept 50-397/88-31
on 880818
& SALP
Rept 50-397/88-08 for June
1987
May 1988.
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR g ENCL /
SIZE: 9~ 9 ~
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP),Report
NOTES
RECIPIENT
ID CODE/NAME
PD5 LA
SAMWORTH,R
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/HFB 10
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NRR/DRIS/RSGB
9
NRR/DRIS/SIB 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
EXTERNAL: H ST LOBBY WARD
NRC PDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD5
AEOD/DOA
COMMISSION
'NRR MORISSEAU,D
NRR/DLPQ/PEB ll
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NRR/DRIS/SGB
9D
NRR/PMAS/ILRB12
IEB
,J
G
02
LPDR
COPIES
LTTR ENCL
1
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
NOTE KO ALL RIDS"
RECIPIEtGS'LEASE
HELP US K) REDUCE %ASTEf
(XkKLCZ 'IHE DOCUMEÃZ COZEL
DES/,
ROCN Pl-37
(EXT. 20079)
TO EZZKMGE RKR MME HCH DISTRIBVXIGN
IZSTS MR DOCUMEPXS YOU DGNiT MKDf
A
D
-'OTAL
NUMBER OF COPIES
REQUIRED:
LTTR
33
ENCL
32
tCT-6
1988
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
3000 George
Way
Richland, Washington
99352
Attention:
Yir. D.
W. Mazur
Managing Director
Gentlemen:
Subject:
Systematic
Assessment
of Licensee
Performance
(SALP) for the
Period of June
1,
1987 through
May 31,
1988
This refers to the
NRC's Systematic
Assessment
of Licensee
Performance
(SALP)
Board Report for Washington Nuclear Plant
(WNP-2) dated July 20,
1988; our
meeting of August 18,
1988, in which we discussed
the contents of the Report;
and your written comments
in response
to the Report dated
September
17,
1988.
During the August 18,
1988 meeting,
we discussed
your planned corrective actions
relating to this assessment
of your activities authorized
by NRC License
Subjects
discussed
during the meeting are
summarized
in the enclosed
inspection report 50-397/88-31.
The
NRC had
a number of concerns
with Supply System performance during the
period.
These
concerns
received special
emphasis
in our discussions
during
this meeting
and were as follows:
Yianagement
involvement in activities (e.g., interface with personnel
to
convey expectations
on performance etc.)
Insufficient follow-through/timeliness
on commitments
and corrective
actions
Personnel
performance
error s resulting from insufficient operator
attention to procedures
or proceeding
in the face of uncertainty,
particularly in the operations
area
Inadequate
preparation of equipment clearances,
resulting in a number of
near misses
Engineering/technical
support effectiveness
Involvement and effectiveness
of quality oversight groups
SS102401S9
SS1016
ADOCK 0500035'7
9'DC
We reviewed your response
to the
WNP-2 SALP Board Report,
dated
September
17,
1988,
and noted that there
were
no comments
addressing
the specific content of
the report.
We feel that your proposed corrective actions to deal with areas
needing
improvement appear to be responsive
and substantial..
As discussed
by
D. F. Kirsch, of my staff, and A. L. Oxsen, of your staff, by telephone
on
October 6, 1988,
we note that your plans for improvement could benefit from the
application of a systematic
program to periodically assess
the effectiveness
of
your initiatives to improve performance
and provide any necessary
corrective
adjustments.
Accordingly, please
provide us with your plans for periodically
assessing
the effectiveness
of your corrective action.
We will discuss
the
results of your periodic assessment
during .each of our future management
meetings.
Based
on the formal exchange of information between our respective staffs,
and
in the absence
of verbal identification of discrepancies
within the report
or formal written comments
from you requiring resolution,
no changes
to the
SALP Board Report are necessary.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
No reply to this letter is required;
however,
should you have
any questions
concerning the
SALP Report, Appendix thereto, of our SALP meeting,
we will be
pleased to discuss
them with you.
Sincerely,
J.
B. Martin
Regional Administrator
Enclosures:
1.
Inspection
Report
No. 50-397/88-31
(Meeting Summary)
2.
Appendix 1,
(NRC Conclusions)
3.
Licensee
Response Ltr,
dated
September
17,
1988
4.
Inspection
Report
No. 50-397/88-08
(Final
SALP Report)
cc w/enclosures
1,
2 and 4:
C.
M. Powers,
P. L. Powell,
R. B. Bouchey,
G. E. Doupe, Esq.,
A. L. Oxsen,
State of WA
N. S.
Reynolds,
Esq.,
BLCP8 R
cc w/enclosures
1, 2,
3 and 4:
Director,
Commissioners
bcc w/enclosures
1 and 2:
Project Inspector
Resident
Inspector
docket file
G.
Cook
B. Faulkenberry
J. Martin
T. Foley,
-3-
bcc w/enclosures
1, 2,
3 and 4:
RV SALP file
bcc w/o enclosures:
M. Smith; J. Zollicoffer
RV/dot~~
CCald&Tl
PJo
s
n
n
RScar
AChaffee
10/g/88
10/ P/88
/
/88
10/
/88
10/ g/88
EQUES
Y
EST
PY
E
Y
P
S
YES /
NO
ES /
NO
YES /
NO
S /
NO
ES /
NO
DKit;s h
10/g
88
rews
10
/8
JMartin
10/
/88
U ST
C
PY
RE
E
/
NO
REQUES
C
P
YES /
NO
D T
YES /
NO