Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17286B057 + (10:35:41, 8 January 2025)
- ML17286B054 + (10:35:43, 8 January 2025)
- ML17286B053 + (10:35:44, 8 January 2025)
- ML17286B052 + (10:35:45, 8 January 2025)
- ML17286B049 + (10:35:46, 8 January 2025)
- ML17286B050 + (10:35:46, 8 January 2025)
- GO2-91-169, Provides Response to Request for Addl Info Re Generic Ltr 89-10,Suppl 3, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves + (10:35:47, 8 January 2025)
- TAC:77801 + (10:35:47, 8 January 2025)
- GO2-91-167, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-16.Corrective Actions:Improvement Initiatives Have Been Planned to Strengthen Mgt Oversight & Implementation of MOV Program + (10:35:49, 8 January 2025)
- ML17286B047 + (10:35:49, 8 January 2025)
- ML17286B044 + (10:35:51, 8 January 2025)
- GO2-91-165, Monthly Operating Rept for Aug 1991 for WNP-2 + (10:35:52, 8 January 2025)
- ML17286B042 + (10:35:52, 8 January 2025)
- GO2-91-164, Responds to Restart Actions of 910614 Confirmatory Action Ltr Re Unsatisfactory Licensed Operator Requalification Training Program & Establishes How Facility Has Met Restart Requirements Delineated in Confirmatory Action Ltr + (10:35:54, 8 January 2025)
- 05000397/LER-1991-013, :on 910507,non-compliances W/Tech Specs Identified as Part of Program of Surveillance Procedure Verification.Further Evaluation Performed.Quality Action Team to Be Chartered to Evaluate Program + (10:35:56, 8 January 2025)
- IR 05000397/1991023 + (10:36:01, 8 January 2025)
- ML17286B034 + (10:36:02, 8 January 2025)
- 05000397/LER-1991-021, :on 910801,determined That Tritium Sampling Was Not Being Performed During Startup,Shutdown & 15 Percent Power Change Evolutions.Caused by Inadequate Procedure/ Procedure Review.Changed Procedure + (10:36:03, 8 January 2025)
- GO2-91-158, WNP-2 Semiannual Radioactive Effluent Release Rept for Jan-June 1991 + (10:36:04, 8 January 2025)
- IR 05000397/1991012 + (10:36:06, 8 January 2025)
- GO2-89-222, Provides Schedule for Corrective Actions Identified in FEMA Region X Rept for 890201-0301 Ingestion Pathway Zone & re-entry/recovery Exercise + (10:36:07, 8 January 2025)
- IR 05000397/1991025 + (10:36:09, 8 January 2025)
- ML17286B025 + (10:36:11, 8 January 2025)
- ML17286B024 + (10:36:12, 8 January 2025)
- ML17286B022 + (10:36:13, 8 January 2025)
- ML17286B021 + (10:36:14, 8 January 2025)
- GO2-91-156, Forwards Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Resulting from Failure of Two Crews & Three Operators During Requalification Simulator Exam Retakes on 910605 & 06 + (10:36:15, 8 January 2025)
- ML17286B018 + (10:36:15, 8 January 2025)
- IR 05000397/1991030 + (10:36:19, 8 January 2025)
- ML17286B013 + (10:36:20, 8 January 2025)
- ML17286B012 + (10:36:21, 8 January 2025)
- ML17286B011 + (10:36:22, 8 January 2025)
- GO2-91-154, Forwards Revised Crew Composition & Planned Shift Scheduled for Modes 4 & 5,per 910725 & s + (10:36:23, 8 January 2025)
- ML17286B008 + (10:36:26, 8 January 2025)
- GO2-91-153, Forwards Rev 7 to Washington Nuclear Plant 2 Licensed Operator Requalification Program Corrective Action Plan, Per NRC Request at 910802 Exit Meeting + (10:36:27, 8 January 2025)
- GO2-91-155, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-18.Corrective Actions:Nov to Be Included as Topic of Discussion During License Operator Requalification Training Program + (10:36:30, 8 January 2025)
- 05000397/LER-1991-018, :on 910712,control Room Emergency Filtration & Standby Gas Treatment Sys Carbon Absorber Surveillances Not Performed Per TS 4.7.2 Requirements.Caused by Inadequate Procedures.Carbon Replaced + (10:36:33, 8 January 2025)
- GO2-91-132, Monthly Operating Rept for Jul 1991 for WPPSS-2 + (10:36:33, 8 January 2025)
- 05000397/LER-1991-020, :on 910716,discovered That RHR Valve B Capability to Shutdown in Event of Fire Could Be Jeopardized Due to Hot Short in Control Circuits.Caused by Design Deficiency.Wiring Changes Implemented.W/Undated Ltr + (10:36:36, 8 January 2025)
- ML17286A999 + (10:36:38, 8 January 2025)
- GO2-91-150, Forwards Fitness for Duty Program Performance Data Personnel Subj to 10CFR26 Rept for Jan-June 1991 + (10:36:39, 8 January 2025)
- ML17286A997 + (10:36:39, 8 January 2025)
- ML17286A992 + (10:36:43, 8 January 2025)
- ML17286A990 + (10:36:44, 8 January 2025)
- ML17286A988 + (10:36:46, 8 January 2025)
- GO2-91-148, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-12 on 910401-0512 & 0516.Corrective Actions:Plant Procedures 2.7.2, Emergency Standby AC Generator, & 7.4.8.1.1.2.1, Diesel Generator..., Revised + (10:36:47, 8 January 2025)
- IR 05000397/1991021 + (10:36:53, 8 January 2025)
- ML17286A980 + (10:36:54, 8 January 2025)
- ML17286A979 + (10:36:55, 8 January 2025)
- ML17286A977 + (10:36:56, 8 January 2025)
- IR 05000397/1991022 + (10:36:57, 8 January 2025)
- ML17286A974 + (10:36:58, 8 January 2025)