ACCELERATED DISTRIBUTION DEMONS~TION SYSTEM
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9109180251 DOC.DATE: 91/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Aug 1991 for WNP-2.W/910906 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
(
ENCL 3 SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
RECIPIENT ID.CODE/NAME PD5 LA ENG, P. L.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL EG6G BRYCE E 43' H
~ + l >f~ 8-P(P COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR DLPQ LPEB10 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 September 6, 1991 G02-91-165 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT AUGUST 1991 Transmitted herewith is the Monthly Operating Report for the month of August 1991 as required by our Technical Specifications 6.9.1.6.
Very truly yours, J.. Baker WNP-2 Plant Manager (MD 927M) bap Enclosure CC:
Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute
,9i09i8025i 9i083i j
PDR-ADOCK 05000397 R
-- PDR
DOCKET NO.:
50-397 UNITNAME:
WNP-2 DATE:
SEPTEMBER 3, 1991 COMPLETED BY.
LBHUTCHISON TELEPHONE:
(509) 377-2486 UNIT SHUTDOWN / REDUCTIONS 0
BIO NO.
c 91-03 6/12/91 F
744 N/A Plant remained shutdown due to upgrading of plant Emergency Operating Procedures and to provide additional licensed operator training.
SUMMARY
WNP-2 remains in administrative shutdown as described above.
TYPE REASON METHOD SYSTEM &COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&
LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER'S 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG4161)
OPERATING DATA REPORT WNP-2 01-Sep-91 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Aug-91 3.
UTILITY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe),:.
7.
MAXIMUM DEPENDABLE CAPACXTY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACXTY (NET MWe):
9 IF CHANGES OCCUR ABOVE SXNCE LAST REPORT I GIVE REASONS None.
3323 1200.9 1100 1129 1085 1 0 ~
POWER TO WHICH RESTRICTED I IF ANY (NET MWe) 11.
REASONS FOR RESTRICTIONS, XF ANY:
None.
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS. ELECTRICAL ENERGY (MWH) 19-NET ELECTRICAL ENERGY (MWH)
- 20. UNIT SERVICE FACTOR
'1.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACXTY. FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 0.0 0.0 0.0 0.0 0
0
-10536 0.04 0.0%
0.0<
- 0. 0>o 100.04 744.0 YEAR CUMULATIVE 5831 58855.2 2459.0 41443.2 0.0 340.4 2439.3 40042.4 0.0 381.7 7921510 114270535 2663880 38065520 2533772 36561942 41.8~a 68.0<
41.8~O 68.7~O 39.8>o 56.7~o 39.5<o 56.5~o 44.34 11.84 1944.0 5345.2 2 6 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE f DATE g DURATION)
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
9/10/91
O.
h
~
~
MONTH:
AUGUST 1991 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 SEPT 3, 1991 LBHUTCHISON (509) 377-2486 DAYAVERAGE DAILYPOWER LEVEL (MWe-NET)
DAYAVERAGEDAILYPOWER LEVEL (MWe-NET) 17.
2.
18.
19.
4.
20.
21.
22.
23.
8.
24.
9.
10.
26.
27.
12.
28.
13.
29.
14.
30.
31.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THATWHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NETELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LFVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.