UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 93 License No.
NPF-21 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Washington Public Power Supply System
( licensees) dated October 4, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-21 is hereby amended to read as follows:
910820018k 910809 PDR
- DOCK 05000397 p
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 93 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION James E. Dyer, Director Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 9, 1991
ATTACHMENT TO LICENSE AMENDMENT NO. 93 FACILITY OPERATING LICENSE NO.
NPF-21 DOCKET NO. 50-397 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
The corresponding overleaf pages are also provided to maintain document completeness.
Remove Pa es 3/4 3-37 3/4 3-38 Insert Pa es 3/4 3-37 3/4 3-38
')
l
INSTRUMENTATION 3/4. 3. 4 RECIRCULATION PUMP TRIP ACTUATION INSTRUMENTATION ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.4.1 The anticipated transient without scram recirculation pump trip (ATWS-RPT) system instrumentation channels shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set consistent with values shown in the Trip Setpoint column of Table 3.3.4.1-2.
APPLICABILITY:
OPERATIONAL CONDITION 1.
ACTION:
a ~
With an ATWS-RPT system instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.4. 1-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel trip setpoint adjusted consistent with the Trip Setpoint value.
With the number of OPERABLE channels per Trip Function less than required by the Minimum OPERABLE Channels per Trip System requirement verify operability of one trip system within one hour and, restore the inoperable channel(s) to OPERABLE status or place the inoperable channel(s) in the tripped condition" within 14 days.
Otherwise be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.3.4. 1.1.
Each ATWS-RPT system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3.4.1-1.
4.3.4. 1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
Only applicable if placing the inoperable channel(s) in trip would not result in a recirculation pump trip.
WASHINGTON NUCLEAR " UNIT 2 3/4 3-37 AMENDMENT NO. 93
k
(
r c
J
~
i
TABLE 3.3.4.1-1 ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION TRIP FUNCTION 1.
2.
Reactor Vessel Water Level-Low Low, Level 2 Reactor Vessel Pressure
- High MINIMUM OPERABLE CHANNELS PER TRIP SYSTEM a a
ne c annel may be placed in an inoperable status for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for required surveillance provided the other channel is OPERABLE.