ACCELERATED D> TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9108220225 DOC.DATE: 91/07/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1991 for WPPSS-2.W/910801 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IP-9 PEB10 EG 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
R D
D NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
r 0
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bm968 ~ 3000 George Wasbtngton Way ~ Rfcbland, Wasbtngton 99352-0968
~ (509) 372-5000 Docket No. 50-397 August 1, 1991 G02-91-132 U.S.
Nuclear, Regulatory Commission Document control Desk Washington, D.C.
20555
Dear,
Sir,:
Subject:
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT JULY 1991 Transmitted herewith is the Monthly Operating Report for, the month of July 1991 as required by our, Technical Specifications 6.9.1.6.
Yerg truly yours, WNP-2 Plant Manager, (MD 927M) jms Enclosure cc:
Mr,. W.H. Lovelace, NRC, Washington DG Mr,. J.B. Martin, NRG Region V
Ms. Dottie Sherman, ANI, Farmington CT Mr,. C. Sorensen, NRG Resident Inspector, (901A)
Mr,. J.T. Wheelock, INPO Mr,. F. Yost, Utility Data Institute pj pegPP225
>ppps'p7 pip731 PDR ADOCK pDR R
,,q,5
~
~
OPERATXNG DATA REPORT WNP-2 01-Aug-91 1 ~
DOCKET: 50-397 2 ~
REPORTING PERIODS Zu1-91 3 ~
UTILITY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHXSON (509) 377-2486 744 4.
LICENSED THERMAL POWER (MWt):
5 ~
NAMEPLATE RATING (GROSS MWe):
6 ~
DESIGN ELECTRICAL RATING (NET MWe):
7 ~
MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUMDEPENDABLE CAPACXTY (NET MWe):
9 ~
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
Gross and net MDC ratings on lines 7 and 8 have been changed to agree with the latest ross heat rate an t erma per, ormance ata.
3323 1200.9 1100 1129 1085 10 'OWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11 'EASONS FOR RESTRICTIONS, IF ANY:
12.
REPORT PERIOD HOURS 13 'OURS REACTOR CRXTICAL 14'X RESERVE SHTDWN HRS 15 'RS GENERATOR ON LINE 16 'NIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18 'ROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20'NIT SERVICE FACTOR 21'NIT AVAXLABILITYFACTOR 22 'NIT CAPACITY FACTOR (MDC NET) 23 'NIT CAPACITY FACTOR (DER NET) 24 'NIT FORCED OUTAGE RATE 25 'ORCED OUTAGE HOURS MONTH 744 0 '
0 '
0 '
0 '
0 0
-9266 0.04 0.0<
0.0%
0.04 100.0%
744 '
YEAR CUMULATIVE 5087 58111.2 2459.0 41443.2 0.0 340.4 2439.3 40042.4 0.0 381.7 7921510 114270535 2663880 38065520 2544308 36572478 48.0%
68.9%
48.0c 69.64 45.74 57.54 45.54'7.2>o 33 '%
10 '~o 1200.0 4601.2 26 'HUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEgDATEIDURATXON)
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
08/30/91
DOCKET NO.:
50-397
~
UNITNAME:
WNP-2 DATE:
AUGUST 1, 1991 COMPLETED BY:
LB HUTCHISOA TELEPHONE:
(509) 377-2486 UNIT SHUTDOWNS / REDUCTIONS REPORT PERIOD: JULY~191 NO.
DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE &CORRECTIVE ACTION TO PREVENT RECURREN 91-03 6/12/91 F 744 E
4 N/A Plant remained shutdown due to upgrading of Emergency Operating Procedures and to provide additional licensed operator training.
SUMMARY
- WNP-2 remains in administrative shutdown as described above.
TYPE F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&,
LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM &COMPONENT EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG -0161)
0
A ERAGE DAILYUNITPOWER L L
MONTH:
JULY 1991 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 AUGUST 1, 1991 LB HUTCHISON (509) 377-2486 DAYAVERAGE DAILYPOWER LEVEL (MWe-NET)
DAYAVERAGEDAILYPOWER LEVEL (MWe-NET) 17.
18.
3.
19.
20.
21.
22.,
7.
23.
24.
9.
10.
26.
27.
Q 12.
28.
29.
14.
30.
15.
31.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE'MEGAWATI'.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THATWHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NETELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.