Forwards Insp Rept 50-397/91-24 on 910715-19 & 0812-16 & Notice of Violations
ML17286B050
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/13/1991
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286B051 List:
References
NUDOCS 9110010008
Download: ML17286B050 (5)


See also: IR 05000397/1991024

Text

~~SR REO(g~

~O

I

I

'+

O~

Cy

~ '>>>>*<<<<'NITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA946964368

SEP i 8

t991

Docket No. 50-397

Washington Public Power Supply System

P.O.

Box 968

Richland, Washington

Attention:

Mr. G.

C. Sorensen

Manager,

Regulatory

Programs

Gentlemen:

This refers to the routine inspection

conducted

by K. E. Johnston of this

office on July 15 through 19,

1991

and August

12 through 16,

1991 of

activities authorized

by NRC Licensee

No. NPF-21

and to the discussion of

findings held by the inspector with Mr. J.

W. Baker and other members of the

Supply System staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Based

on the results of this inspection,

one of your activities appears

to be

in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation concerns

the failure to initiate

a Problem

Evaluation Request to address

high diesel starting air system pressures.

The findings discussed

in this report indicated

weaknesses

in the

implementation of the system engineering

program.

Although the program

expectations

appear consistent with those typical to the industry, the program

elements

necessary

for an engineer to implement these expectations,

such

as

training, procedural

requirements,

and resources,

have not been consistently

provided.

As a result, routine tasks

such

as

system walkdowns

and the

identification and review of emergent

problems are not always accomplished.

Problems

such

as the

one described

in the Notice

seem indicati,ve of the

reduced effectiveness

of the system engineers.

As discussed

with your staff

at the exit meeting,

these

issues

warrant further management

attention.

Your are required to respond to this letter and should follow the instructions

in the enclosed

Notice when preparing your response.

In your response,

you

should

document the specific actions

taken

and any additional actions you plan

to prevent recurrence.

After reviewing your response

to this Notice,

including your

proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

110010008

910913

PDR

ADOCK 05000397

G

PDFI

/ ~gy

'

F20

GEP i 3

1991

In accordance

with 10 CFR 2.790, of the NRC's "Rules of Practice,"

a copy of

this letter, the enclosures,

and your response will be placed in the

NRC

Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosures:

1.

Notice of Yiolation

2.

Inspection

Report

No. 50-397/91-24

. A. Richards,

Chic

Reactor Projects

Branch

cc w/enclosures:

A. L. Oxen,

Deputy Managing Director

G.

D. Bouchey, Director, Licensing

and Assurance

J.

W. Baker,

WNP-2 Plant Manager

A. G. Hosier,

WNP-2 Licensing Manager

G. E. Doupe,

Esq

Winston

5 Strawn

State of Washington

0

4

I

'

-3-

sFp

< 8

199)

bcc w/enclosures:

docket file

Project Inspector

Resident Inspector

G.

Cook

B. Faulkenberry

J. Martin

P. Johnson

P.

Eng,

NRR

bcc w/o enclosure

2:

J. Zollicoffer

J. Bianchi

M. Smith-

REGION

V

I

KJohnston/ ot

PJo

n

n

9/0./91

9/<~/91

AJoh son

SRichards

9/lP

91

9// 7/91

RE

T

COPY

R

UE T

COPY

RE

UEST

PY

RE

ST

COPY

RE

VEST

COPY

YES

N 'ES

N

YES

S

N

ES

N

S

0

PDR

YES

NO

l

P

jl

1