Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-93-223, Notifies That Util Will Not Be Submitting Comments from Retake of Written Portion of Initial Operator License Exam Administered on 930826 to I Sumsion & G Westergard + (10:09:51, 8 January 2025)
- ML17290A669 + (10:09:51, 8 January 2025)
- IR 05000397/1993025 + (10:09:53, 8 January 2025)
- IR 05000397/1993033 + (10:09:57, 8 January 2025)
- ML17290A664 + (10:09:58, 8 January 2025)
- ML17290A662 + (10:09:59, 8 January 2025)
- ML17290A661 + (10:10:00, 8 January 2025)
- IR 05000397/1993015 + (10:10:01, 8 January 2025)
- ML17290A658 + (10:10:03, 8 January 2025)
- GO2-93-241, Submits Followup Request for Discretionary Enforcement to Allow for Continued Plant Operation W/Isolation Sys Response Time SRs of TS Table 3.3.2-3 Not Having Been Demonstrated for Specific Primary & Secondary Ci Valves + (10:10:04, 8 January 2025)
- ML17290A656 + (10:10:05, 8 January 2025)
- ML17290A655 + (10:10:06, 8 January 2025)
- GO2-93-242, Application for Amend to License NPF-21,requesting Tech Spec 3/4.3.2 Re Isolation Actuation Instrumentation Response Time Testing Under Emergency Circumstances + (10:10:07, 8 January 2025)
- ML17290A652 + (10:10:09, 8 January 2025)
- TAC:M84553 + (10:10:09, 8 January 2025)
- ML17290A648 + (10:10:10, 8 January 2025)
- GO2-93-240, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-24.C/As:personnel Will Review & Incorporate Technical Changes to Vol 9 Procedures & Shift Engineers Will Perform an Independent Technical Review of Procedures + (10:10:11, 8 January 2025)
- GO2-93-238, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-19.Corrective Actions:Improvement of Plant Procedure PPM 1.3.18, Foreign Matl Control Around Spent Fuel Pool,Reactor Cavity & Dryer Separator Pit + (10:10:12, 8 January 2025)
- ML17290A634 + (10:10:14, 8 January 2025)
- IR 05000397/1993029 + (10:10:19, 8 January 2025)
- ML17290A631 + (10:10:20, 8 January 2025)
- ML17290A630 + (10:10:21, 8 January 2025)
- IR 05000397/1993024 + (10:10:37, 8 January 2025)
- ML17290A627 + (10:10:38, 8 January 2025)
- ML17290A625 + (10:10:39, 8 January 2025)
- ML17290A624 + (10:10:40, 8 January 2025)
- ML17290A622 + (10:10:41, 8 January 2025)
- IR 05000397/1993032 + (10:10:42, 8 January 2025)
- ML17290A619 + (10:10:43, 8 January 2025)
- IR 05000397/1993030 + (10:10:46, 8 January 2025)
- ML17290A616 + (10:10:47, 8 January 2025)
- ML17290A615 + (10:10:48, 8 January 2025)
- GO2-93-237, Forwards Rev 17 to WPPSS-QA-004, Operational QA Program Description. Requests Withdrawal of Request for Approval of Rev 16 + (10:10:49, 8 January 2025)
- GO2-93-236, Responds to RAI for GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (10:10:51, 8 January 2025)
- ML17290A610 + (10:10:52, 8 January 2025)
- ML17290A608 + (10:10:53, 8 January 2025)
- GO2-93-232, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-25.Corrective Actions:Changed Plant Mod PPM 1.4.1 & Issued Memo to Identify New Scheduled Maint Sys Checklist + (10:10:54, 8 January 2025)
- ML17290A607 + (10:10:54, 8 January 2025)
- GO2-93-233, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-15.Corrective Actions:Revised Technical Training Procedure TTM-5.3.2 + (10:10:56, 8 January 2025)
- GO2-93-229, Monthly Operating Rept for Aug 1993 for WNP-2 + (10:10:57, 8 January 2025)
- GO2-93-228, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-397/93-18 & 50-397/93-24.Corrective Actions:Prepared Substitution Evaluation 1786 & Counseled Involved Personnel + (10:10:59, 8 January 2025)
- ML17290A599 + (10:11:01, 8 January 2025)
- ML17290A597 + (10:11:01, 8 January 2025)
- TAC:M86815 + (10:11:02, 8 January 2025)
- GO2-93-230, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-20.C/As:all Remaining Applicable Maint Surveillance Procedures Reviewed & Revised to Ensure That drywell-to-wetwell TS Bypass Leakage Limits Not Challenged + (10:11:03, 8 January 2025)
- ML17290A596 + (10:11:03, 8 January 2025)
- TAC:M86635 + (10:11:05, 8 January 2025)
- ML17290A592 + (10:11:06, 8 January 2025)
- ML17290A593 + (10:11:06, 8 January 2025)
- GO2-93-218, Amended Response to NRC Re Violations Noted in Insp Rept 50-397/93-201.Corrective Actions:Level 1 Root Cause Analysis on Procedural Adherence Will Be Completed 931031 + (10:11:07, 8 January 2025)
- 05000397/LER-1993-014, :on 930803,discovered Inadequate Backup Overcurrent Protection for Containment Penetrations Due to Inadequate Design Analysis Using Inaccurate & Incomplete Documentation.Changed Plant Procedure + (10:11:09, 8 January 2025)