Monthly Operating Rept for Aug 1993 for WNP-2
ML17290A603
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1993
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-229, NUDOCS 9309150207
Download: ML17290A603 (8)


Text

. ACCELERATE+ DOCUMENT DIST UTION SYSTEM 4

REGULA~ INFORMATION DISTRIBUTI YSTEM (RIDS)

ACCESSION NBR:9309150207 DOC.DATE: 93/08/31 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1993 for WNP-2.W/930909 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL r

SIZE: 5 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PDV PD COPIES LTTR ENCL 1

1 D

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL: EGGG BRYCEEJ.H NSIC 1

1 1

1 NRC PDR 10 10 AEOD/DOA 1

1 RRQ~GR &/~OEAB 1

1 REG F~~

01 1

1 1

1 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIEN'I'S:

I'LEASE HELP US TO REDUCE WAS'I'I:! CONTACT 'flIE DOCUMEN'I'ON'I'ROI.I)L'~l'.

ROOM I 1.37 (EXT. 504-2065) TO ELIMIi4ATE YOUR NAME FIKOM DIS'I'RIIIIPI'ION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24 Je

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96S

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 September 9,

1993 G02-93-229 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT August 1993 Transmitted herewith is the Monthly Operating Report for the month ofAugust 1993 as required by our Technical Specifications 6.9.1.6, Very trul

ours,

. V. Parrish (MD1023)

Assistant Managing Director of Opertions DE/ja CC:

Mr. W. H. Lovelace, NRC, Washington, DC Mr. B. H. Faulkenberry, NRC Region V Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. C. Bergesen, UtilityData Institute l5.034 Z(P 9'30'tti50207 930831 PDR ADQCK 05000397

~

~

~ q

'L

'(

H

WASIIINOTON PUBLIC PO\\VBR 4 SUPPLY SYSTBM r

WNP-2 MONTHLY GENERATION STATISTICS FOR AUGUST 1993 ELECTRICAL THERMAL GENERATION STATISTICS

  • Gross Thermal (MWHth)

Gross Electrical (MWHe)

Current Month 1,618,841 549,450 Calendar Year-to-Date 11,900,049 4,098,440 Fiscal Year-to-Date 4,070,541 1,391,000 Commercial (Dec. 1984) 149,064,699 49,947,530 Net Electrical (MWHe) - BPA Off-Site Power Used On-Line Off-Site Power Used Off-Line 527 698

)~I,;,"<<Ig~gs,:;,':.'","::.'::.'pc+

195

.,5. >0 i g.<<g"k~Piic;.;(,';@/ 8i 3 388

',',%,,'x>ig~t;>.,~:j g < t',.'4.) Ni.(M.t;.;:;.i<<j~j';;tg@p@<<.<<',:<h

~ S<<:< l,X...

Net Electrical (MWHe) - Actual Critical Hours Hours On-Line AvailabilityFactor Capacity Factor 524,114 559.0 524.5 70.5%

63.4%

3,894,604 4,032.5 3,830.3 65.7%

60. 1%

1,334,331 1,303.0 1,268.5 85.2%

80.6%

47,845,023 67.4%

57.2%

REACTOR FUEL USAGE STATISTICS

  • Full Power Days Used:

Full Power Days Left in Core:

Current Month 20.30 Cycle 9 56.87 159.13 Since 8/01/93 20.30

,"'<<4<:?<):.<$l:":pgx)IS);:.:.:.Ni<<>?,.;5'-:;.'ji::

Full Power Days Loaded

'without FFTR or coastdown)

Equivalent Full Power Days Loaded (with FFTR and coastdown) 216 255 Electrical and thermal generation statistics and the reactor fuel usage statistics were obtained from WNP-2 Control Room logs and BPA Historical Accounts data.

p:magen datahreportshsshstats.ss September 8, 1993 Performance Evaluations MD 1026

e E

OPERATING STATUS REPOR for WNP-2 Date:

September 1, 1993 2.

3.

4, 5.

6.

7.

8.

9.

10.

11.

3323 1200.9 1120 1165 1112 n/a n/a n/a Docket:

50-397 Reporting Period:

AUGUST 1993 Outage + On-Line Hours:

744.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

Report Period Hours 13, Hours Reactor Critical 14.

Rx Reserve Shutdown Hours 15.

Hours Generator On-Line 16.

Unit Reserve Shutdown Hours 17.

Gross Thermal Energy (MWH) 18.

Gross Electrical Energy (MWH) 19.

Net Electrical Energy (MWH) 20.,

Unit Service Factor 21.

Unit AvailabilityFactor 22.

Unit Capacity Factor (MDC Net) 23.

Unit Capacity Factor (DER Net) 24.

Unit Forced Outage Rate 25.

Forced Outage Hours MONTH 744.0 559.0 0.0 524.5 0.0 1,618,841 549,450 524,179 70.5%

70.5%

63.4%

62.9%

29.5%

219.5 YEAR 5,831.0 4,032.5 0.0 3,830.3 0.0 11,900,049 4,098,440 3,894,669 65.7%

65.7%

60. 1%

59.6%

13.8%

612.0 CUMULATIVE 76,399.2 53,181.2 340.4 51,138.0 381.7 149,064,699 49,947,530 47,845,088 66.9%

67.4%

57.2%

56.9%

13.4%

7,885.3 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

None.

27.

Ifcurrently shutdown estimated startup date:

Note:

Cumualtive Unit Capacity Factors (MDC 8c DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

AUGUST 1993 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 September 1, 1993 D. G. Embree (509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 10 12 13 15 1097 1092

-17

-14

-15

-15

-14

-14

-14

-17 82 276 792 883 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1089 1092 1089 1089 1065 1087 1094 1090 1105 1104 1105 1097 1098 1099 1096 1095 INSTRUCfIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating ofthe unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

AUGUST 1993 DOCKET NO.:

50-397 UNITNAME:

WNP-2 DATE:

September 1; 1993 COMPLETED BY: D.G. Embree TELEPHONE:

(509) 3774448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 93%7 8/03/93 F

219.5 93427 CD VALVEX During performance of a surveillance procedure to calibrate Main Steam Radiation Indicating Switch, the reactor unexpectedly scrammed &om 100%

power due to a fullisolation of the MSIVs.

It was discovered that a MSIVpilot valve had been improperly rebuilt during the recent refueling outage.

It was correctly rebuilt and the plant vys eventually restarted.

See LER 93M7 for other corrective actions taken and training evolutions planned.

SUMMARY

WNP-2 had one automatic scram during the month ofAugust. Upon completion ofrequired equipment repairs, the plant was restarted and ramped up to fullpower operation by month's end.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREGA161 Exhibits F &H