Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291B113 + (09:32:26, 8 January 2025)
- ML17291B110 + (09:32:28, 8 January 2025)
- ML17291B112 + (09:32:28, 8 January 2025)
- GO2-95-241, Monthly Operating Rept for Oct 1995 for WNP-2 + (09:32:29, 8 January 2025)
- ML17291B106 + (09:32:31, 8 January 2025)
- ML17291B105 + (09:32:31, 8 January 2025)
- IR 05000903/2010014 + (09:32:32, 8 January 2025)
- ML17291B102 + (09:32:34, 8 January 2025)
- ML17291B101 + (09:32:35, 8 January 2025)
- GO2-95-238, Special Rept:On 951026,RB Effluent Monitoring Sys Inoperable for 72 H Due to Failure of Mid Range Stack Monitor.Cryostat Cooling Assemblies for Mid & High Range Stack Monitors Returned to Vendor for Refurbishment + (09:32:36, 8 January 2025)
- ML17291B099 + (09:32:36, 8 January 2025)
- GO2-95-234, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-26.Corrective Actions:Performed Independent Verification of Valves Manipulated During Performance of PPM 7.4.3.3.1.53 + (09:32:38, 8 January 2025)
- GO2-95-235, Forwards Final Response to rev1,suppl 1 of GL 92-01, Reactor Vessel Structural Integrity + (09:32:39, 8 January 2025)
- ML17291B094 + (09:32:42, 8 January 2025)
- GO2-95-228, Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys + (09:32:43, 8 January 2025)
- GO2-95-227, Notifies That on 951009,State of Wa Energy Facility Site Evaluation Council Approved Renewal of Facility NPDES Permit for five-yr Term.Renewed Permit WA-002515-1 Encl + (09:32:45, 8 January 2025)
- ML17291B090 + (09:32:47, 8 January 2025)
- 05000397/LER-1995-011, :on 950919,failed to Comply W/Ts SR for RCIC Sys Due to Analysis Deficiency That Resulted in Inadequate Surveillance Test Procedure.Surveillance Procedure Revised to Correct Deficiency + (09:32:49, 8 January 2025)
- GO2-95-221, Responds to GL 95-07 & Provides Requested Info Re Implementation Actions & Completion Schedule + (09:32:50, 8 January 2025)
- SBK-L-17169, 8 - Non-Proprietary Enclosure 1 to SBK-L-17155 + (09:32:53, 8 January 2025)
- ML17291B086 + (09:32:57, 8 January 2025)
- ML17291B085 + (09:32:58, 8 January 2025)
- ML17291B080 + (09:32:59, 8 January 2025)
- ML17291B082 + (09:32:59, 8 January 2025)
- GO2-95-212, Requests Approval to Revise Tornado Design Criteria + (09:33:00, 8 January 2025)
- 05000397/LER-1995-009, :on 950907,unexpected Closure of Inboard & Outboard MSIV Occurred During Performance of Surveillance Test.Caused by Activity Performed Under Procedure That Did Not Define Necessary Steps.Updated Procedure + (09:33:03, 8 January 2025)
- IR 05000397/1995028 + (09:33:05, 8 January 2025)
- ML17291B075 + (09:33:07, 8 January 2025)
- GO2-95-208, Requests Review & Approval of Relief Request for Exam Category C-G Pump Casing Welds to Support Planning for Spring,1997 & Spring,1998 Refueling Outages + (09:33:08, 8 January 2025)
- GO2-95-209, Monthly Operating Rept for Sept 1995 for WNP-2 + (09:33:10, 8 January 2025)
- ML17291B072 + (09:33:12, 8 January 2025)
- ML17291B070 + (09:33:13, 8 January 2025)
- ML17291B063 + (09:33:14, 8 January 2025)
- ML17291B059 + (09:33:18, 8 January 2025)
- IR 05000716/2009002 + (09:33:19, 8 January 2025)
- ML17291B056 + (09:33:20, 8 January 2025)
- GO2-95-203, Provides Summary of Results of Review Re Potential Concerns About Certain Computer Software Used at WNP-2 + (09:33:21, 8 January 2025)
- IR 05000397/1995201 + (09:33:34, 8 January 2025)
- ML17291B052 + (09:33:41, 8 January 2025)
- IR 05000397/1995012 + (09:33:42, 8 January 2025)
- ML17291B048 + (09:33:44, 8 January 2025)
- ML17291B046 + (09:33:45, 8 January 2025)
- ML17291B045 + (09:33:46, 8 January 2025)
- GO2-95-195, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-21.Corrective Actions:Repaired Affected Radiation Barrier + (09:33:47, 8 January 2025)
- GO2-95-196, Withdraws Request of Amend to TS 3/4.6.1.4, Main Steam Isolation Valve Leakage Control Sys + (09:33:49, 8 January 2025)
- GO2-95-201, Requests Extension of Exam Interval for GL 88-01 Category C Welds After Completion of Stress Improvements Process,From within 2 Refueling Outages of Stress Improvement to within 4 Yrs After Stress Improvement + (09:33:51, 8 January 2025)
- GO2-95-200, Forwards Relief Request 2ISI-16 for Temporary non-code Repair of Standby Svc Water Piping Per GL 90-05 + (09:33:57, 8 January 2025)
- ML17291B038 + (09:34:00, 8 January 2025)
- ML17291B036 + (09:34:01, 8 January 2025)
- IR 05000397/1995019 + (09:34:02, 8 January 2025)
- ML17291B034 + (09:34:03, 8 January 2025)