ML17291B085

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 951024 to Discuss Performance Enhancement Strategy W/Nrc Oversight Panel.Submits List of Attendees
ML17291B085
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/16/1995
From: Myer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC
References
NUDOCS 9510200124
Download: ML17291B085 (6)


Text

gag tifQI

~C,

<n.

~ k UNITED STATES CLEAR REGULATORY COMMISSI REGION. IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011 8064 OCT I 6 l995 NOTICE OF LICENSEE MEETING Name of Licensee:

, Name of Facility:

Docket No.:

Washington Public Power Supply System (WPPSS)

Washington Nuclear Project Unit 2 (WNP-2) 50-397 Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

October 24, 1995 1 p.m.

(PDT)

WPPSS Corporate Office Wakley Room

Richland, Washington Discussion of Performance Enhancement Strategy with NRC Oversight Panel J.

E. Dyer, Director, Division of Reactor Projects W.

H. Bateman, Project Director, PD IV-2, Office of Nuclear Reactor Regulation (NRR)

J.

A. Mitchell, EDO Coordinator K.

E. Brockman,'Deputy Director, Division of Reactor Safety K.

E. Perkins, Director, Walnut Creek Field Office H. J.

Wong, Chief, Reactor Projects Branch E

R.

C. Barr, Senior Resident Inspector J.

W. Clifford, Senior Project

Manager, NRR Licensee Attendees:

W.

G.

J.

V.

J.

P.

G. 0.

P.

R.

R.

L.

J.

H.

Counsil, Managing Director
Parrish, Vice President, Nuclear Operations Burn, Engineering Director
Smith, equality Assurance Director
Bemis, Regulatory and Industry Affairs Director
Webring, Support Services Director
Swailes, Plant General Manager NOTE:

(1)

This meeting is open to attendance by members of the general public.

9510200124 951016 PDR ADOCK 05000397 P

PDR

Washington Public Power Supply System (2)

NRC personnel, not listed above that desire to attend this meeting should notify HE J.

Wong at (510) 975-0286 by COB on October 19, 1995.

Approved By:

CC:

Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352 Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, MD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.'ox 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 ye erector Division of Reactor Projects

Washington Public Power Supply System Winston 3 Strawn ATTN:

N. H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System acT i6t995 Distribution:

E-Hail To:

(

)

PHNS SAH PAB WTR ACT RPZ 0 EMAIL LJC RCB CAH DMK1 FGS BWH HFH2

JAC1, CHS, CJG LAT, DLF, CAM3
CLS1, LMB, CLG
CAD, NLH, WSW CC:

FOR NRC Attendees Htg Announcement Coordinator J.

L. Hilhoan, DEDR H. L. Thompson, DEDS W. T. Russell, D/NRR A. C. Thadani, ADT/NRR R.

P.

Zimmerman, ADP/NRR J.

Lieberman, D/OE L. J. Chandler, OGC WNP Resident Inspector C. A. Hackney, RSLO D.

M. Kunihiro, WCFO G.

F, Sanborn, EO B. Henderson, PAO M.

Hammond, PAO RA Secretaries DRP Division DRS Division DRSS Division DMB (IE 45)

OEDO RIV Coordinator (17G21)

L. S. Ousley, AHB' ORA File RIV File DRP File To receive copy of documc'nt, indicate in box: "C" Copy wfthout enclosures "E" ~ Copy with enclosures "N" No copy RIV:C: DRP/E D:WCFO PAO RSLO D:DRP HJWong;df 10/6/95 KEPerkins 10/6/95 10/i

/95 0

C L

COR CO 10/t~/95 BWHenders n

CAHackn y JEDyer 10/

r/95 nr. r

<ivy~ \\'l~ if 0

Washington Public Power Supply System OCT I 6 l995 Distribution:

E-Mail To:

FOR

(

)

PHNS SAM PAB WTR ACT RPZ OEHAIL LJC RCB CAH DMK1 FGS BWH MFH2

JACl, CMS, CJG LAT, DLF, CAM3
CLS1, LMB, CLG CAD, NLH, WSW NRC Attendees Mtg Announcement Coordinator J.

L. Hilhoan, DEDR H. L. Thompson, DEDS W. T. Russell, D/NRR A. C. Thadani, ADT/NRR R.

P.

Zimmerman, ADP/NRR J.

Lieberman, D/OE L. J. Chandler, OGC WNP Resident Inspector C. A. Hackney, RSLO D. H. Kunihiro, WCFO G.

F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO RA Secretaries DRP Division DRS Division DRSS Division CC:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

L. S. Ousley, AMB

~

ORA File RIV File DRP File To receive copy of document, Indicate in box: "C" ~ Copy without en osures "E" ~ Copy with enclosures "N" ~ No copy RIV:C: DRP/E HJWong;df 10/6/95 D:WCFO KEPerkins 10/6/95 PAO BWHender n

10/ $ /95 C

C RSLO ~

D:DRP CAHackney JEDyer 10/lg/95 10/@/95