Forwards Insp Rept 50-397/95-30 on 950925-28 & Notice of Violation
ML17291B110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/14/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B111 List:
References
NUDOCS 9511210016
Download: ML17291B110 (6)


See also: IR 05000397/1995030

Text

PRIORIT'Y Z

NUDOCS OFFSITE FACILITY)

REGULATO

INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9511210016

DOC.DATE: 95/ll/14

NOTARIZED:

NO

ACIL;50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

WYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards

insp rept 50-397/95-30

on 950925-28

& notice of

violation.

DOCKET ¹

05000397

P

R

i

DISTRIBUTION CODE:

IEOSD

COPIES

RECEIVED:LTR J

ENCI J

SIZE:

+2 +

TITLE: Environ

a Radiological

(50 DKT)-Insp Rept/Notice of Violation Respons

NOTES:

0,

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

PI L'E "C JN TER>>

RR/DISP/PIPB

OE DIR

RGN4

FILE

01

EXTERNAL: NOAC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/TTC

'NMSS/SFPO

06F18

NUDOCS-ABSTRACT

OGC/HDS3

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

R'

D

U

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE ivASTE! CONTACTTHE DOCUMENTCONTROL

DESK, ROOM Pl-37 (EXT. SQ4-20S3 ) TO ELIMINATEYOUR NAh!E FROM

DIS I'RIBUTIONLIS'M I'OR DOCUMENTS YOU DON"I'NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

14

ENCL

14

~jj,S REQQC

~C

~o

+

-~ ~a

oQ

IP ++*>>>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

AR LINGTON,TEXAS 76011.8064

Nov ] g g

Washington Public Power Supply System

ATTN:

J.

V. Parrish.

Vice President

Nuclear Operations

3000 George Washington

Way

P.O.

Box 968.

HD 1023

Richland.

Washington

99352

SUBJECT:

NRC

INSPECTION REPORT 50-397/95-30

AND NOTICE OF VIOLATION

This reters to the inspection

conducted

by Messrs.

L. T. Ricketson

and

H.

P.

Shannon of this office on September

25-28.

1995, at the Washington

Nuclear Project-2 facility.

The purpose of the inspection

was to determine

whether activities authorized

by the license were conducted safely and in

accordance

with NRC requirements.

At the conclusion of the inspection,

the

findings were discussed

with you and those

members of your staff identified in

the enclosed

report.

Areas examined during the inspection are identified in the report.

Within

these

areas,

the inspection consisted of selective examinations of procedures

and representative

records,

interviews with personnel.

and observation of

activities in progress.

Based

on the results of this inspection,

the

NRC has determined that

a

violation of NRC requirements

occurred.

The violation is cited in the

enclosed

Notice of Violation (Notice) and the circumstances

surrounding it are

described

in detail in the'subject

inspection report.

The violation is of

concern

because it involved the failure to maintain

a locked door for entry

into an area in which the radiation levels exceeded

1000 mRems/hr.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions

you plan to prevent recurrence.

Your response

may reference or

include previous docketed

correspondence. if the correspondence

adequately

addresses

the required

response.

After reviewing your

response to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

In addition to,responding to the Notice,

we also request that the Washington

Public

Power

Supply System address

the weaknesses

identified during the

inspection regarding the continued

problems in assuring that adequate

verifications are performed

This issue is discussed

in Section 2.7 of the

enclosed

inspection report.

'75ii2i00ih 95iii4

PDR

ADQCK 050003'77

8

PDR

Washington Public Power

Supply System

-2-

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letters its enclosure(s).

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible.

your response

should not

include any personal

privacy, proprietary.

or safeguards

information so that

it can

be placed in the

PDR without redaction.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clear ance procedures

of the Office of Management

and Budget

as requi red

by the Paperwork

Reduction Act of 1980.

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~~Thomas

P.

Gwynn, Director

Division of Reactor

Safety

Docket:

50-397

License:

NPF-21

Enclosures:

1.

Notice of'iolation

2.

NRC Inspection

Report

50-397/95-30 w/attachments

cc w/enclosures:

Washington Public Power Supply System

ATTN:

J.

H.

Swai les.

WNP-2 Plant Manager

P.O.

Box 968.

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympian

Washington

98504-3172

Washington Public Power

Supply System

-3-

i

Washington Public Power

Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Hanager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston 8 Strawn

ATTN:

H.

H.

Phi lips.

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power

Supply System

-4

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

<<< bccto

DMB ('IE06)

bcc distrib. by RIV:

L. J. Callan

DRS-PSB (Goines)

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

WNP-2 Resident

Inspector

HIS System

RIV File

Br anch Chief (DRP/TSS)

M.

Hammond

(PAO.

WCFO)

DOCUHENT NAHE:

0:KFIPBtLTRtWN530RP.LTR

DRS AI 95-123

To receive copy of document, indicate In box: "C" ~ Copy

ihout enc

sures

"E" ~ Copy with enclosures "N" ~ No copy

RIV: PSB

E

C: PSB

E

D:DR

D:DRP

D:DRS

LTRicketson*

10/30/95

BHurray*

10/30/95

previous y concur re

TPGwynn

11/

/95

f-

L

JEDyer

11//t/-/95

TPGwynn

1/r

/95