GO2-95-209, Monthly Operating Rept for Sept 1995 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1995 for WNP-2
ML17291B073
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1995
From: Enbree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-209, NUDOCS 9510160263
Download: ML17291B073 (11)


Text

PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9510160263 DOC.DATE: 95/09/30 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION ENBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLIATION DOCKET 05000397 P

SUBJECT:

Monthly operating rept for Sept 1995 for WNP-2.W/951009 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

'NOTES RECIPXENT ID CODE/NAME PD4-2 PD INTERNAL: AC NRR/DRPM/PECB EXTERNAL LXTCO BRYCE 1 J H

NRC PDR COPXES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DISP/PXPB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

N NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5DB (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

tw'l C

fl

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 October 9, 1995 G02-95-209 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT SEPTEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month of September 1995 as required by Technical Specification 6.9.1.6.

Sincere V. Parrish (Mail Drop 1023) ice President, Nuclear Operations JVP:DGE CC:

LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)

INPO ANILibrary UtilityData Institute BPA (399) 9510160263 950930 PDR ADOCK 05000397

..R.....,

.,PDR

4 ~

d C

OPERATING STATUS REPORT for WNP-2 Date:

October 1, 1995 l.

2.

3.

4 5.

6.

7.

8.

9.

3486 1199 1153 1145 1099 none Docket:

50-397 Reporting Period:

SE<PTENIER 1995 Outage + On-line Hours:

720.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours Power to which restricted, ifany (Net MW,):

about 98% (DER net =1130 MWe)

Reasons for restrictions, ifany:

administrative limitplaced on plant operations until special feedwater flow test results are validated, which may result in about a 2% decrease in power.

MONTH YEAR CUMULATIVE 720.0 6,551.0 94,639.2 720.0 4,726.2 67,426.8 0.0 404.5 744.9 720.0 4,473.9 65,041.5 0.0 577.1 958.8 2,485,289 14,386,067 193,648,907 846,230 4,924,470 65,277,970 815,843 4,717,899 62,543,033 100.0%

68.3%

68.7%

100.0%

77.1%

69.7%

103.1%

66. 1%

60.5%

98.3%

63.9%

59.8%

0.0%

7.2%

11.3%

0.0 348.6 8,319.7 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.

Ifcurrently shutdown, estimated startup date:

NA Note:

Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

~)

,a

.I 1,

C.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50-397 UNIT:

WNP-2 DATE:

October 1, 1995 COMPLETED BY:

D. G. Embrce TELEPHONE:

(509) 377-8448 REPORT PERIOD:

SEPTEMBER 1995 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1151 1145 952 1101 1151 1154 1153 1150 1145 1146 1147 1151 1150 1150 1149 16 17 18 19 20 21 22 23 25 26 27 28 29 30 1147 1148 1147 1130 1130 1137 1137 1132 1134 1130 1128 1125 1127 1131 1118 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~.

'P I

I

,E

'I I

I f a

l I

h H

w

,(>

W

~ 1

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

SEPTKHBER 1995 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

October %, 1995 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 377-845 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the beginning of the month, the plant was operating at full power.

The plant did not significantly ()20% decrease from previous day) reduce power during the entire month.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H

4 I I 1

Av h~

Author:

LINDA M.

MAR at -sspo08 Date:

9/29/K5 10:19 AM Priority: Oiormal TO:

JOHN P.

ALBERS at

-SSPO10 TO:

SHARON M.

GRUNST at

-SSPO03

. TO:

JOHN C.

HANSON at,

-SSPO16 TO:

TAMMY S.

LOVE at

-SSPO15 TO: LINDA M.

MAR TO:

MATT M. MONOPOLI at

-SSP016 TO:

GARY D.

SANFORD at

-SSPO15 TO:

CHRISTOPHER O'.

SCHWARZ at

-SSPO02 TO:

JOHN E.

WYRICK at

-SSP012 TO: JOSEPHINE J.

AMES at

-SSPO11 TO:

LUELLA R.

HAWKINS at

-SSPO13 TO: LINDA L.

LONG at

-SSPO04 TO: DENISE S.

MILLS at -SSP011 TO: DIANE L.

WEBB at

-SSP015

Subject:

Delegation of Authority Message Contents INTEROFFICE MEMORANDUM t

DATE:

September 27, 1995 TO:

J.

V. Parrish, Vice President, Nuclear Operations (1023)

FROM:

J.

H. Swailes, WNP-2 Plant General Manager (9

SUBJECT:

DELEGATION OF AUTHORITY

REFERENCE:

During my absence on September 30-October 5,

1995, Mr. G.

O. Smith, Director, Quality, w'll act for the WNP-2 Plant General Manager.

Mr.

Smith will have full authority of the position with the exception of personnel and salary actions.

Should my actual return be delayed, this delegation shall continue until my actual return.

lmm "Original signed and filed"