ML17291B075

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/95-28 on 950911-15.No Violations Noted
ML17291B075
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/13/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B076 List:
References
NUDOCS 9510180088
Download: ML17291B075 (4)


See also: IR 05000397/1995028

Text

~

g

W

i~

~p,a Rangy~

O

Cy

A

I

C)

00

v

~4.

0

<<*~y4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 6064

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George Washington

Way

P.O.

Box 968,

ND 1023

Richland,

Washington

99352

SUBJECT:

NRC INSPECTION REPORT 50-397/95-28

This refers to the inspection conducted

by Hs.

Paula

Goldberg of this office

on September

11-15.

1995, at the Washington

Nuclear

Project-2 facility.

The

purpose of the inspection

was to determine whether activities authorized

by

the license were conducted safely and in accordance

with NRC requirements.

At

the conclusion of the inspection.

the findings were discussed

with you and

those

members of your staff identified in the enclosed

report.

Areas examined during the inspection are identif'ied in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel.

and observation of

activities in progress.

The results of this inspection are documented in the

enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of'ractice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely.

Docket:

50-397

License:

NPF-21

Enclosure:

NRC Inspection

Report

50-397/95-28 w/attachment

omas

P.

Gwynn.

Dir c or

Division of Reactor

fety

95iOi80088 95iOi3

PDR

ADOCK 05000397

6

PDR

Washington Public Power Supply

System

-2-

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia. Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

8 Strawn

ATTN:

M. H. Philips. Esq..

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply

System

-3-

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to,'DMB (IEOl)

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E.

WCFO)

Leah Tremper

(OC/LFDCB.

HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIY File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME: R:

WN528RP.PAG

To receive copy of document, indicate in box: "C" ~ Copy without enciosures

"E" ~ Copy with enclosures "N" ~ No

copy

RIV:RI:EB

PAGoldberg

C:EB

CAV n

urgh

D:0

TPGwynn

D:DRP

JEDyer

0:DRS

TPGwynn

10/0'/95

10/ 9/95

10/

/95

. 10/'t /95

A

Y

10/

/95

Washington Public Power

Supply

System

-3-

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J.

Ca 1 1 an

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO).

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME: R:

WN528RP.PAG

To receive copy of document, Indicate In box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No

copy

RIV:RI: EB

PAGoldberg

10/4'/95

C:EB

CAV n

urgh

10/

/95

D:D

TPGwynn

10/

/95

D:DRP

D:DRS

10/

/95

10/

2 /95

JEDyer AI

TPGwynn