Forwards Insp Rept 50-397/95-26 on 950716-0902 & Notice of Violation.Violation of NRC Concern Because of History of Poor Interdepartmental Communications When Attempting to Troubleshoot Degraded Reactor Feedwater Control Sys
ML17291B056
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B057 List:
References
NUDOCS 9510110084
Download: ML17291B056 (6)


See also: IR 05000397/1995026

Text

UNITED STATE'

NUCLEAR R EG ULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON, TEXAS 76011 8064

OCT

6 8%

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023,

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-26

AND NOTICE OF VIOLATION

This refers to the inspection

conducted

by Nr.

R.

C. Barr and others of this

office on July

16 through

September

2,

1995,

at the Washington Nuclear

Project-2 facility.

The purpose of the inspection

was to determine

whether

activities authorized

by the license

were conducted

safely

and in accordance

with NRC requirements.

At the conclusion of the inspection,

the findings were

discussed

with you and those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

of

activities in progress.

Based

on the results of this inspection,

the

NRC has determined that

a

violation of NRC requirements

occurred.

The violation is cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding it are

described

in detail

in the subject

inspection report.

The violation is of

concern

because

there is

a history of poor performance

associated

with

simultaneous

and

independent verification at WNP-2.

We continue to be concerned

with the apparent

lack of communications

between

the operations

and engineering

departments.

During this inspection

the plant

experienced

a reactor water level transient,

which nearly resulted

in a

reactor trip, that

was partially caused

by poor interdepartmental

communications

when attempting to troubleshoot

a degraded

reactor feedwater

control

system.

You are required to respond to this letter and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previously docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed

corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter, its enclosure(s),

and your response will be placed

in the

NRC

95iOii0084 95i006

PDR

ADQCK 05000397

8

PDR

Washington

Public Power

Supply System

Public Document

Room (PDR).

To the extent possible,

your response

should not

include

any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed

in the

PDR without redaction.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-397/95-26

J.

E.

D er, Director

Division of Reactor Projects

cc w/enclosures:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington

Public

Power Supply System

ATTN:

Chief Counsel

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power

Supply System

-3-

Washington Public Power Supply System

ATTN:

P.

R.

Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

8 Strawn

ATTN:

M. H. Philips,

Esq,

1400

L Street,

N,W.

Washington,

D.C.

20005-3502

C

OCT

6 895

Washington Public

Power

Supply System

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB (rE01)

if'cc

distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9EIO)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

DOCUHENT NAHE:

R:g WN2ttWN526rp.RCB

To receive copy of document. indicate in box: "C" ~ Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV:SRI:ORPOLE

RCBarr*

9/27/95

C:DRPgE

HJWong*

9/28/95

D:DRP

JEDyer

10/6/95

  • previous y concurre

OFFICIAL RECORD

COPY

OCT

6 l995

Washington Public

Power

Supply System

E-Hail report to D. Nelson

(DJN)

E-Mail report to

NRR Event, Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:~t WN2ttWN526rp.RCB

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" i Copy with enclosures

N" i No copy

RIV:SRI: DRP~tE

RCBarr*

9/27/95

C'DRPttE

HJWon *

9/28/95

D:DRP

JEDyer

10/6/95

  • previous y concurre

OFFICIAL RECORD

COPY