4
'j PR.j!:C3R.I EY' ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
@Ps ACCESSION NBR: 9511200009 DOC. DATE: 95/10/3 1 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Oct 1995 for WNP-2.
W/951110 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR 1
ENCL I TITLE: Monthly Operating Report (per Tech Specks NOTES:
SIZE:
RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME CLIFFORD,J COPIES LTTR ENCL 1
1 INTERNAL:
CR FILE CEN RG 01 10 10 1
1 1
1 AEOD/SPD/RRAB NRR/DRPM/PECB 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIihIINATEYOUR NAME FROil DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 19
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 November 10, 1995 G02-95-241 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1995 Transmitted herewith is the Monthly Operating Report for the month of October 1995 as required by Technical Specification 6.9.1.6.
Sincerel
. V. Parrish (Mail Drop 1023)
Vice President, Nuclear Operations JVP:DGE CC:
LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)
INPO ANILibrary UtilityData Institute BPA (399) 2t QQ (I L) 9511200009 951031 PDR ADOCK 0500039'7
.R PDR j
OPERATING STATUS REPORT for WNP-2 Date:
November 1, 1995 2.
3.
4.
5.
6.
7.
8.
9.
3486 1199 1153 1145 1099 none Docket:
50-397 Reporting Period:
OCTOBER 1995 Outage + On-line Hours; 745.0 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity (Gross MW,):
Maximum Dependable Capacity (Net MW, ):
Ifchanges occur above since last report, give reasons:
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours Power to which restricted, ifany (Net MW,):
about 98% (DER net =1130 MWe)
Reasons for restrictions, ifany; administrative limitplaced on plant operations until special feedwater flow test results are validated, which may result in about a 2% decrease in power.
MONTH YEAR CUMULATIVE 745.0 7,296.0 95,384.2 745.0 5,471.2 68,171.8 0.0 404.5 744.9 745.0 5,218.9 65,786.5 0.0 577.1 958.8 2,570,836 16,956,903 196,219,743 868,390 5,792,860 66,146,360 837,936 5,555,835 63,380,969 100.0%
71.5%
69.0%
100.0%
79.4%
70.0%
102.3%
69.9%
60.9%
97 5o/o 67.4%
60.1%
0.0o/o 6,3%
11.2%
0.0 348.6 8,319.7 26.
Shutdowns scheduled over the next 6 months (type, date, duration):
27.
Ifcurrently shutdown, estimated startup date:
Refueling, 4/13/96, 55 days NA Note:
Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
t 1
AVERAGE DAILY VNIT POWER LEVEL REPORT PERIOD:
OCTOBER 1995 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 November 1, 1995 D. G. Embree (509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1136 1059 1029 1133 1136 1132 1131 1133 1132 1124 1130 1138 1138 1133 1131 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1125 1129 1135 1140 1138 1137 1141 1142 1083 1065 1110 1139 1139 1146 1136 1149 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).
In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
OCTOBER 1995 DOCKET NO.:
50-397 UNIT NAME:
WNP-2 DATE:
November 3, 1995 COMPLETED BY:
D.G. Embree TELEPHONE:
(509) 377-8448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None
SUMMARY
At the beginning of the month, the plant was operating at full power.
The plant did not significantly (>20% decrease from previous day) reduce power during the entire month.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F & H