Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17306B246 + (06:30:57, 8 January 2025)
- ML17306B244 + (06:30:58, 8 January 2025)
- ML17306B242 + (06:31:00, 8 January 2025)
- TAC:M84145 + (06:31:01, 8 January 2025)
- ML17306B241 + (06:31:04, 8 January 2025)
- ML17306B238 + (06:31:06, 8 January 2025)
- ML17306B237 + (06:31:07, 8 January 2025)
- ML17306B236 + (06:31:08, 8 January 2025)
- ML17306B232 + (06:31:09, 8 January 2025)
- 05000528/LER-1992-016, :on 921208,reactor Tripped on High Pressurizer Pressure Due to Main Turbine Trip.Caused by Failure of Static Negative Sequence Time Over Current Relay.Faulty Relay Replaced W/Identical GE Relay + (06:31:48, 8 January 2025)
- ML17306B229 + (06:31:51, 8 January 2025)
- ML17306B228 + (06:31:52, 8 January 2025)
- ML17306B226 + (06:31:53, 8 January 2025)
- ML17306B224 + (06:31:57, 8 January 2025)
- ML17306B220 + (06:31:58, 8 January 2025)
- ML17306B218 + (06:31:59, 8 January 2025)
- ML17306B217 + (06:32:00, 8 January 2025)
- LR-N17-0166, Core Operating Limits Report - Cycle 26 + (06:32:02, 8 January 2025)
- IR 05000293/2017201 + (06:32:03, 8 January 2025)
- ML17306B198 + (06:32:04, 8 January 2025)
- IR 05000263/2017011 + (06:32:06, 8 January 2025)
- ML17306B192 + (06:32:08, 8 January 2025)
- ML17306B191 + (06:32:08, 8 January 2025)
- ML17306B190 + (06:32:09, 8 January 2025)
- ML17306B189 + (06:32:11, 8 January 2025)
- 05000529/LER-1992-005-01, Forwards LER 92-005-01 Re Failure to Perform ASME Code Class 2 Train B Charging Pump Testing within Max Allowable Surveillance Interval.Encl Discusses Root Cause Determination & Corrective Actions + (06:32:30, 8 January 2025)
- ML17306B184 + (06:32:33, 8 January 2025)
- ML17306B182 + (06:32:34, 8 January 2025)
- ML17306B174 + (06:32:35, 8 January 2025)
- ML17306B180 + (06:32:35, 8 January 2025)
- ML17306B173 + (06:32:37, 8 January 2025)
- ML17306B172 + (06:32:38, 8 January 2025)
- ML17306B169 + (06:32:39, 8 January 2025)
- ML17306B168 + (06:32:40, 8 January 2025)
- ML17306B167 + (06:32:42, 8 January 2025)
- ML17306B166 + (06:32:43, 8 January 2025)
- ML17306B164 + (06:32:44, 8 January 2025)
- IR 05000528/1992039 + (06:32:47, 8 January 2025)
- ML17306B150 + (06:32:49, 8 January 2025)
- ML17306B158 + (06:32:49, 8 January 2025)
- ML17306B149 + (06:32:51, 8 January 2025)
- ML17306B145 + (06:32:52, 8 January 2025)
- ML17306B142 + (06:32:54, 8 January 2025)
- ML17306B140 + (06:32:55, 8 January 2025)
- ML17306B129 + (06:33:48, 8 January 2025)
- ML17306B124 + (06:33:52, 8 January 2025)
- ML17306B121 + (06:33:54, 8 January 2025)
- 05000528/LER-1992-013, :on 920902,determined That Three Economizer Feedwater Isolation 4-way Valve Failures Probably Due to Mfg Defects.Caused by Improper Machining & Less than Acceptable Dedication Program.Also Reported Per Part 21 + (06:33:56, 8 January 2025)
- 05000528/LER-1992-014, :on 921008,discovered Operation in Excess of Licensed Condition for Thermal Power.Caused by Inaccurate Span Correction Factors.Operating Units Reduced Power to 99.5 Percent Power + (06:34:01, 8 January 2025)
- ML17306B113 + (06:34:03, 8 January 2025)
- ML17306B112 + (06:34:04, 8 January 2025)