ML17306B180
| ML17306B180 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/31/1992 |
| From: | Chavet K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17306B175 | List: |
| References | |
| NUDOCS 9212160181 | |
| Download: ML17306B180 (6) | |
Text
ENCLOSURE 2 REVISED PAGES FOR THE UNIT 1 JANUARY 1992 MONTHLYOPERATING REPORT q~fpg60j8g e212 PDR ADOCK 0500 R
4.
pj's l
I
'I 9
~v
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT HAME PVNGS-1 DATE COMPLETED BY K A. Chavet OPERATING STATUS l.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 1 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A g~ l'i'k~'+UNXT~>146ENERATING>>'STAT IS TXGSj";-,""j,",.~+.".
"'.":.:This ";Month '< g<Y'r..>-',to-,D'ate +
12.
13.
15.
16.
17.
18, 19.
20.
21.
22.
23.
b-,'".-'."Hou)r's',."3n'jReporting -'!Peijod;:';.,;:;:.;..,,',",.~j<~,',,'j""',i'.'.'j'.::::~
":-'~Ho2urs~R'ea'c) t'o'r,,'~wasCr istical':,'-g~.P~<~::,~g'",".',","'..
'.~R'eac t6riR'eser've'/Shutdown iH ours),";:~',"D.;:,:<i-."':~$;,"~
'i+Hours6-'Generator; >'was'";.'On-'Line"."".~j<~".j4,,":q"-"
g1Uni't'-".,Re8se rve',-Shutdown".Hours.'"""'";,','~;,4j';:,'2~~;,',;,:
6114):?8g'j88, o@>5( sv <1)8 vs())8'0 1,)/it 6 x)wv 4,6'vgw)wo/K0,ylA+1/)2g> 6 j::~'Gr)o'as'h'e'rmal'"'Energy
/Generaie'd'".(MWH)".-",-.:~
3.:Gross))E1'acts.ical" Ene'rgy,Generated"(MWH)
'"";Netj'Ele~c~tgxcal";.-".Energy:."Genera ted',:(MWH).'~',~'XUrii~t8;:)5'er'v'iced'Fac t'or/.'."(8').';.,:.~':;:.,","9Pj "Pi'"",.-.;.""~.".;j;
'-'hUnit:-,,Availab il8i'ty:-',8Factor<,(~f)~,.",:".'<",,:.". "'.".;h'>>-.",'.-"'~4
k,':Un'i'O',:;:Capacity'jF8ac tor.:;';(Usi'ng!MDC",':,He'6)'-:::","!"':.".:
- ">Uni'e-~Capaci'ty
- ,'Fac to'r-."'(0's2ing-.'9ER':>Net),'!.(;.";,$
744 492.7 0.0 472.0 0.0 1,430,983 490,000 451,025 63.4a 63.4a 49.6s 47.7%
36.6s 744 492.7 0.0 472.0 0.0 1,430,983 490,000 451,025 63.4S 63.4a 49.6s 47.7s 36.6s 52,680 29,551.8 0.0 28,794.1 0.0 105,295,239 36,538,700 34,275,817 54.7S 54.7%
53.3%
51.2s 20.6%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin outa e
Februar 15 1992 70 davs 25.
If Shutdown At End of Report Period, Estimated Date of Start-up:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~05 85
~06 85
~11 85 Achieved 05/525 85 06/610 85 01/128 86 1
I thy'g 1)
Q I
A