ML17306B180

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jan 1992 for Pvngs,Unit 1
ML17306B180
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/31/1992
From: Chavet K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17306B175 List:
References
NUDOCS 9212160181
Download: ML17306B180 (6)


Text

ENCLOSURE 2 REVISED PAGES FOR THE UNIT 1 JANUARY 1992 MONTHLY OPERATING REPORT q~fpg60j8g e212 0500 PDR ADOCK R

pj's 4.

l

'I I

9

~ v

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT HAME PVNGS-1 DATE COMPLETED BY K A. Chavet OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 1 2.
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A g~ l'i'k~'+UNXT~>146ENERATING>>'STAT IS TXGSj";-,""j,",.~+.". "'.":.:Th is ";Month '< g<Y'r..>-',to-, D'ate +

b-,'".-'."Hou)r's',."3n'jRe por ting -'!Peijod;:';.,;:;:.;..,,',",.~j<~,',,'j""',i'.'.'j'.::::~ 744 744 52,680

12. ":-'~Ho2urs~R'ea'c) t'o'r,,'~wasCr istical':,'-g~.P~<~::,~g'",".',","'.. 492.7 492.7 29,551.8
13. '.~R'eac t6r iR'eser've'/Shutdown iH ours),";:~',"D.;:,:<i-."':~$;,"~ 0.0 0.0 0.0

'i+Hour s6-'Generator; >'was'";.'On-'Line"."".~j<~".j4,,":q"-" 472.0 472.0 28,794.1

15. g1Uni't'-".,Re8se rve',-Shutdown".Hours.'"""'";,','~;,4j';:,'2~~;,',;,: 0.0 0.0 0.0 6114):?8g'j88, o@>5( sv <1)8 vs())8'0 1,)/it 6 x) wv 4,6'vgw)wo/K0, yl A+1/)2g> 6
16. j::~'Gr)o'as'h'e'rmal'"'Energy /Generaie'd'".(MWH)".-",-.:~ 1,430,983 1,430,983 105,295,239
17. 3.:Gross))E1'acts.ical" Ene'rgy,Generated"(MWH) 490,000 490,000 36,538,700 18, '"";Netj'Ele~c~tgxcal";.-".Energy:."Genera 451,025 451,025 34,275,817 ted',:(MWH).'~',~'XUrii~t8;:)5'er'v'iced'Fac
19. t'or/.'."(8').';.,:.~':;:.,","9Pj "Pi'"",.-.;.""~.".;j; 63.4a 63.4S 54.7S
20. '-'hUnit:-,,Availab il8i'ty:-',8Factor<,(~f)~,.",:".'<",,:.". "'.".;h'>>-.",'.-"'~4 63.4a 63.4a 54.7%
21. k,':Un'i'O',:;:Capacity'jF8ac tor.:;';(Us i'ng!MDC",':,He'6)'-:::","!"':.".: 49.6s 49.6s 53.3%
22.  ;;">Un i'e-~Capaci'ty:,'Fac to'r-."'(0's2ing-.'9ER':>Net),'! .(;.";,$ 47.7% 47.7s 51.2s
23. 36.6s 36.6s 20.6%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e Februar 15 1992 70 davs
25. If Shutdown At End of Report Period, Estimated Date of Start-up: N A Forecast Achieved INITIAL CRITICALITY ~05 85 05/525 85 INITIAL ELECTRICITY ~06 85 06/610 85 COMMERCIAL OPERATION ~11 85 01/128 86 1

I thy'g 1)

Q I

A