ML17306B182

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1992 for PVNGS Unit 1
ML17306B182
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/31/1992
From: Acklund C
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17306B175 List:
References
NUDOCS 9212160183
Download: ML17306B182 (5)


Text

ENCLOSURE 3 REVISED PAGES FOR THE UNIT 1 OCTOBER 1992 MONTHLYOPERATING REPORT 9212160183 921212 PDR ADOCK 05000528 R

PDR

'I

ORIGINAL SHUTDOWNS AND POWER REDUCTIONS October 1992 DATE

  • 9 No.

Outage Method of Duration Shutting System Date Type~

Hours Reason~

Down Reactor3 LER No.

Code~

Cause and Corrective Component Action to Code~

Prevent Recurrence 92-04 10/25/92 F

N/A N/A N/A N/A RX power reduced to 74% due to loss of COLSS.

~F-Forced S-Scheduled

~Reason:

~Method:

A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain)

'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit H-Same Source 5

REVISED SHUTDOWNS AND POWER REDUCTIONS November 1992 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY B.

S. Ecklund No.

Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.

Code Cause and Corrective Component Action to Code~

Prevent Recurrence 92-03

= 09/28/92 F

35.6 H

1-92-012 TB RX trip on high pressuri pressure following turbine trip due to actuation of subsynchronous relay.

92-04 10/25/92 F

N/A N/A N/A N/A RX power reduced to 74% due to loss of COLSS.

~F-Forced S-Scheduled 2Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee>>

Event Report (LER) File (NUREG 0161)

~Exhibit H-Same Source 5

0 0

4

'4 ftQQ