Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202F076 + (07:56:40, 8 December 2024)
- ML20202F069 + (07:56:41, 8 December 2024)
- ML20202F067 + (07:56:42, 8 December 2024)
- IR 05000341/1985052 + (07:56:44, 8 December 2024)
- ML20202F063 + (07:56:44, 8 December 2024)
- ML20202F062 + (07:56:45, 8 December 2024)
- ML20202F059 + (07:56:45, 8 December 2024)
- ML20202F053 + (07:56:46, 8 December 2024)
- ML20202F052 + (07:56:47, 8 December 2024)
- ML20202F050 + (07:56:48, 8 December 2024)
- ML20202F048 + (07:56:49, 8 December 2024)
- IR 05000440/1997022 + (07:56:50, 8 December 2024)
- ML20202F046 + (07:56:51, 8 December 2024)
- 05000321/LER-1986-026, :on 860605,during Performance of Special Functional Test on Reactor Protection Instruments,Determined That Procedures Did Not Include Step to Perturb Water Level. Caused by Personnel Error.Procedures Under Rev + (07:56:53, 8 December 2024)
- PNO-V-86-040, on 860709,reactor Tripped Due to Low Level in Steam Generator Coincident W/Steam Flow Feed Flow Mismatch. Caused by Loss of Main Feed Pump.Pump Repaired & post-trip Review Conducted + (07:56:54, 8 December 2024)
- ML20202F041 + (07:56:54, 8 December 2024)
- IR 07100015/2012001 + (07:56:55, 8 December 2024)
- ML20202F040 + (07:56:55, 8 December 2024)
- 05000338/LER-1986-010-01, :on 860603,diesel-driven Fire Pump Determined Inoperable During Performance of Weekly Surveillance Test. Caused by Failed Starter Motor.Replacement Starter Motor Installed + (07:56:57, 8 December 2024)
- ML20202F036 + (07:57:05, 8 December 2024)
- ML20202F035 + (07:57:05, 8 December 2024)
- ML20202F032 + (07:57:06, 8 December 2024)
- IR 05000298/1986009 + (07:57:11, 8 December 2024)
- ML20202F030 + (07:57:11, 8 December 2024)
- ML20202F028 + (07:57:12, 8 December 2024)
- ML20202F026 + (07:57:13, 8 December 2024)
- ML20202F019 + (07:57:15, 8 December 2024)
- ML20202F020 + (07:57:15, 8 December 2024)
- ML20202F018 + (07:57:16, 8 December 2024)
- ML20202F016 + (07:57:17, 8 December 2024)
- ML20202F008 + (07:57:18, 8 December 2024)
- ML20202F007 + (07:57:19, 8 December 2024)
- ML20202F006 + (07:57:19, 8 December 2024)
- B16832, Discusses Unit 2 Independent Corrective Action Verification Program Re Tier 1 Insp Readiness.Attached Schedule Dates Continue to Be Flexible as Util Continues to Finalize Work Scope in Each Area + (07:57:21, 8 December 2024)
- ML20202F003 + (07:57:22, 8 December 2024)
- ML20202F001 + (07:57:22, 8 December 2024)
- ML20202E999 + (07:57:23, 8 December 2024)
- ML20202E998 + (07:57:24, 8 December 2024)
- 05000443/LER-1997-016-01, Forwards LER 97-016-01 Re Event That Occurred on 971105 at Station.Ler Is Being Submitted to Retract LER 97-016-00, Which Was Determined to Be Unreportable + (07:57:26, 8 December 2024)
- ML20202E994 + (07:57:28, 8 December 2024)
- ML20202E995 + (07:57:28, 8 December 2024)
- 05000338/LER-1986-012-01, :on 860527,fire Detection Equipment for Svc Water & Fuel Oil Pumphouses Removed from Svc to Accommodate Cable Pull Associated W/Svc Water Mods & Not Returned to Svc by 860610.Hourly Fire Watch Implemented + (07:57:30, 8 December 2024)
- ML20202E987 + (07:57:32, 8 December 2024)
- ML20202E989 + (07:57:32, 8 December 2024)
- ML20202E986 + (07:57:33, 8 December 2024)
- ML20202E984 + (07:57:34, 8 December 2024)
- ML20202E983 + (07:57:35, 8 December 2024)
- ML20202E982 + (07:57:35, 8 December 2024)
- ML20202E979 + (07:57:40, 8 December 2024)
- ML20202E977 + (07:57:41, 8 December 2024)
- ML20202E975 + (07:57:42, 8 December 2024)
- 05000317/LER-1997-010, :on 971210,1B EDG Failed to Start During Performance of Routine Surveillance Test.Caused by Piece of Stainless Steel Foreign Matl in Governor Hydraulic Boundaries.Stainless Steel Replaced.With + (07:57:43, 8 December 2024)