Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203C364 + (06:46:41, 8 December 2024)
- PNO-II-86-029, on 860411,reactor Tripped While Unit Operating at 70%,due to Loss of Permanent Magnet Generator in Exciter Unit.Repairs Will Be Completed by 860415.During Shutdown, Cooldown Rate Higher than Expected + (06:46:41, 8 December 2024)
- ML20203C362 + (06:46:42, 8 December 2024)
- PNO-V-86-017, on 860411,merchant Ship in Columbia River Veered Into Shore Near Plant,Damaging 30 Ft of Outfall Pipe. Svc Water Flow Uninterrupted.Plant Operating at 73% Power. Repairs Considered for Apr 1986 Refueling Outage + (06:46:42, 8 December 2024)
- ML20203C356 + (06:46:43, 8 December 2024)
- ML20203C355 + (06:46:44, 8 December 2024)
- ML20203C354 + (06:46:46, 8 December 2024)
- ML20203C352 + (06:46:47, 8 December 2024)
- ML20203C353 + (06:46:47, 8 December 2024)
- ML20203C349 + (06:46:48, 8 December 2024)
- ML20203C350 + (06:46:48, 8 December 2024)
- ML20203C346 + (06:46:49, 8 December 2024)
- ML20203C347 + (06:46:49, 8 December 2024)
- ML20203C345 + (06:46:50, 8 December 2024)
- ML20203C344 + (06:46:51, 8 December 2024)
- ML20203C343 + (06:46:51, 8 December 2024)
- ML20203C339 + (06:46:52, 8 December 2024)
- ML20203C342 + (06:46:52, 8 December 2024)
- PNO-II-91-014, on 910329,as Result of Severe Weather & Heavy Rains,Bridge Located on Highway 61 Approx 7-8 Miles North of Grand Gulf Was Washed Out.State of Mississippi Have Been Notified + (06:46:53, 8 December 2024)
- ML20203C337 + (06:46:53, 8 December 2024)
- ML20203C333 + (06:46:54, 8 December 2024)
- ML20203C328 + (06:46:55, 8 December 2024)
- ML20203C329 + (06:46:55, 8 December 2024)
- B17017, Special Rept:On 980130,declared Meteorological Tower (Met) Delta - T Instrumentation Due to Discovery of Met Instrument Uncertainty Values Found Out of Compliance.Will Modify Meteorological Instrumentation Installed at Plant + (06:46:56, 8 December 2024)
- ML20203C325 + (06:46:58, 8 December 2024)
- ML20203C323 + (06:46:59, 8 December 2024)
- ML20203C319 + (06:47:00, 8 December 2024)
- ML20203C321 + (06:47:00, 8 December 2024)
- ML20203C317 + (06:47:03, 8 December 2024)
- ML20203C315 + (06:47:03, 8 December 2024)
- ML20203C314 + (06:47:05, 8 December 2024)
- ML20203C313 + (06:47:05, 8 December 2024)
- ML20203C311 + (06:47:06, 8 December 2024)
- ML20203C310 + (06:47:07, 8 December 2024)
- ML20203C309 + (06:47:07, 8 December 2024)
- ML20203C306 + (06:47:10, 8 December 2024)
- ML20203C308 + (06:47:10, 8 December 2024)
- ML20203C302 + (06:47:11, 8 December 2024)
- ML20203C301 + (06:47:12, 8 December 2024)
- ML20203C299 + (06:47:14, 8 December 2024)
- ML20203C298 + (06:47:15, 8 December 2024)
- ML20203C295 + (06:47:16, 8 December 2024)
- ML20203C291 + (06:47:18, 8 December 2024)
- ML20203C293 + (06:47:18, 8 December 2024)
- ML20203C290 + (06:47:19, 8 December 2024)
- U-603145, Informs That Util Eliminating Requirement for Sys Engineers to Witness at Least One Appropriately Selected Surveillance Per Quarter + (06:47:20, 8 December 2024)
- ML20203C287 + (06:47:20, 8 December 2024)
- ML20203C281 + (06:47:22, 8 December 2024)
- ML20203C284 + (06:47:22, 8 December 2024)
- ML20203C280 + (06:47:23, 8 December 2024)
- ML20203C278 + (06:47:23, 8 December 2024)
- 3F0298-22, Informs That Util Has Revised Operating Procedure OP-204 to Ensure Real & Reactive Power Is Maintained IAW Reactive Capability Curve in OP-103A, Startup Curves. Commitment Made by Util,Encl + (06:47:24, 8 December 2024)