7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION BOSTON EDISON COMPANY DOCKET NO. 50-29]
PILGRIM NUCLEAR POWER STATION ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (the Commission) is considering approval under 10 CFR 50.80, by issuance of an Order, of the transfer of control of Facility Operating License No. DPR-35, for the Pilgrim Nuclear Power Station. located in Plymouth County, Massachusetts, to the extent such transfer would be effected by the proposed corporate restructuring of Boston Edison Company (BECo. the licensee), holder of the license.
ENVIRONMENTAL ASSESSMENT Identification of the Prooosed Action:
The proposed action would consent to the transfer of control of the license, to the extent effected by the restructuring of BECo by establishment of a newly created holding company. BEC Energy.
BECo would become a wholly owned subsidiary of the holding company and would continue to be the licensee for Pilgrim Nuclear Power Station.
No direct transfer of the license would occur. The proposed action is in accordance with BECo's application dated June 9, 1997.
The Need for the Procosed Action:
The proposed action is needed to the extent the proposed restructuring of BECo will effect a transfer of control of the license to permit the restructuring to occur.
BECo has submitted that the proposed restructuring will enable it to better prepare to implement changes resulting from electric utility industry restructuring, and will enhance 1
9712150287 971209 POR ADOcK 05000293 P
i 2-the insulation of BECo's utility business from business risks associated with non-utility enterprises.
Environmental Imoacts of the Procosed Action:
The Comission has completed its evaluation of the proposed corporate restructuring and concludes that there will be no physical or operational changes to the Pilgrim Nuclear Power Station. The corporate restructuring will not affect the qualifications or organizational affiliation of the personnel who operate or maintain the facility, as BECo will continue to be responsible for the operation, maintenance and possession of the Pilgrim Nuclear Power Station.
The Commission has evaluated the environmental impact of the proposed action and has determined that the probability or consequences of accidents would not be increased by the proposed action, and that post-accident radiological releases would not be greater than previously detennined.
Further, the Commission ba.c determined that the proposed action would not affect routine radiological exposure. Accordingly, the Commission concludes that there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential nonradiological impacts, the proposed action would not affect nonradiological plant effluents and would have no other environmental impact.
Therefore, the Commission concludes that there are no significant nonradiological environmental impacts associated with the proposed action.
Alternatives to the Procosed Action:
Since the Commission concluded that there are no significant environmental effects that would result from the proposed action, any alternative with equal or greater environmental impacts need not be evaluated.
l
1 i.
The principal alternative would-be to deny the requested action.
Denial of the application would result in no change in current environmental impacts.
The environmental impacts of the proposed action and the alternative action are identical.
Alternative Use of Resources:
This action does not involve the use of any resources not previously considered in the Final Environmental Statement for the Pilgrim Nuclear Power Station, dated May 1972.
-Aaencies and Persons Contactad:
i In accordance with its stated policy, on December 9. 1997, the staff consulted with the Massachusetts State Official. James Muckerheide, of the Massachusetts Emergency Management Agency regarding the environmental impact of the proposed action.
The State official had no comments.
FINDING OF NO SIGNIFICANT IMPAR.T Based upon the environmental assessment, the Commission concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensee's application dated June 9. 1997, which is available for public inspection at the Commission's Public Document Room. the Gelman Building. 2120 L Street. NW.. Washington. DC. and at the local public document room located at the Plymouth Public Library. 11 North Street. Plymouth. Massachusetts.
Dated at Rockville. Maryland, this 9th day of December 1997.
FOR TliE NUCLEAR REGULATORY COMMISSION 494 8 Ronald B. Eaton. Acting Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
\\
9
. DISTRIBUTION Oocket File PDI-3 Rdg.
December 9, 1997 e
MEMORANDUM TO:
Rules and Directives Branch Division of Administrative Services Office of Administration FROM:
Office of Nuclear Rentor Regulation
SUBJECT:
ENVIRONMENTAL ASSES 5K 6T ABO FINDING OF NO SIGNIFICANT IMPACT FOR THE CORPORATE RESTRUCTURIMG OF BOSTON EDISON COMPANY One signed or;ginal of the edere Egi er ce identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 5
) f the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s) and Operating License (s).
~
C Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s):
Time for submission of Views on Antitrust matters.
Notice of Consideration of issuance of Amendment to Facility Operating License. (Call with 30-day insert date).
[ Notice of Receipt of Application for Facility License (s); Notice of Ave" ability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility L%ensc!s) and Notice of Opportunity for Hearing.
C Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
Notice of issuance of Construction Permit (s).
Notice of lasuance of Facility Operating Licensets) or Amendment (s).
Order.
[ Exemption.
Notice of Granting Exemption.
Q Environmental Assessment.
Notice of Preparation of Environmental Assessment.
Receipt of Petition for Director's Decision Under 10 CFR 2.206.
Issuance of Final Director's Decision Under 10 CFR 2.206.
Other:
s DOCKET NO.59-293 Attachment (s): As stated
Contact:
Alan Wang Telephone: 415-1445 DOCUMENT NAME:
To tw.eews a copy of thee doewwnt. indicate in the box:
- C' - Copy without attachment / enclosure
- E* = Copy with attachment / enclosure
'N' - No copy OFFICE pDI.1 l
l l
l l
l l
)
NAME I
DATE 12/0/g7 OFFICIAL RECORD COPY