Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203P029 + (01:58:14, 8 December 2024)
- B12051, Advises That Future Refs to Equipment Qualification Temp Should Be 280 F,As Result of Reevaluation of Containment Pressure/Temp Profiles,Per IE Info Notice 84-90 + (01:58:15, 8 December 2024)
- TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215 + (01:58:15, 8 December 2024)
- ML20203P023 + (01:58:16, 8 December 2024)
- ML20203P020 + (01:58:17, 8 December 2024)
- ML20203P019 + (01:58:18, 8 December 2024)
- ML20203P018 + (01:58:19, 8 December 2024)
- ML20203P014 + (01:58:20, 8 December 2024)
- ML20203P017 + (01:58:20, 8 December 2024)
- 05000382/LER-1986-019, :on 860909,during Full Power,Reactor Tripped Due to Turbine Trip.Caused by Alternate Drain Valve Failure Resulting in hi-hi Level in Moisture Separator Reheater Shell Drain Tank 2.Valve Reworked + (01:58:22, 8 December 2024)
- B12046, Forwards BAW-1912, Haddam Neck Plant Technical Rept Supporting Cycle 14 Operation. Administrative Tech Spec for Current Surveillance on Quadrant Power Tilt Ratio Implemented.W/O Encl + (01:58:23, 8 December 2024)
- IR 05000483/1986003 + (01:58:26, 8 December 2024)
- 05000369/LER-1986-017-03, :on 860911,both Trains of Hydrogen Mitigation Sys Determined Inoperable During Surveillance Testing.Caused by Failure of Several Hydrogen Ignitors.Accessible Ignitors Replaced.Test Box Built + (01:58:28, 8 December 2024)
- ML20203P001 + (01:58:29, 8 December 2024)
- ML20203N999 + (01:58:29, 8 December 2024)
- ML20203N998 + (01:58:30, 8 December 2024)
- ML20203N994 + (01:58:32, 8 December 2024)
- ML20203N988 + (01:58:33, 8 December 2024)
- TXX-6019, Interim Deficiency Rept CP-86-50 Re Nut Alignment & Torque Requirements for Unistrut Spring Nuts on Instrument Mounts. Initially Reported on 860716.Drawings for Instrument Racks & Tubing Supports Revised.Next Rept Expected by 870221 + (01:58:33, 8 December 2024)
- ML20203N986 + (01:58:34, 8 December 2024)
- ML20203N985 + (01:58:35, 8 December 2024)
- ML20203N980 + (01:58:36, 8 December 2024)
- ML20203N981 + (01:58:36, 8 December 2024)
- ML20203N977 + (01:58:37, 8 December 2024)
- ML20203N976 + (01:58:37, 8 December 2024)
- ML20203N975 + (01:58:38, 8 December 2024)
- ML20203N969 + (01:58:46, 8 December 2024)
- ML20203N970 + (01:58:46, 8 December 2024)
- ML20203N968 + (01:58:47, 8 December 2024)
- ML20203N964 + (01:58:48, 8 December 2024)
- ML20203N962 + (01:58:48, 8 December 2024)
- B12061, Application for Amend to License DPR-61,revising Tech Specs to Add New Section 3.24, RCS Leakage Detection Sys, to Fulfill NUREG-0826 Commitment.Fee Paid + (01:58:49, 8 December 2024)
- ML20203N957 + (01:58:50, 8 December 2024)
- ML20203N958 + (01:58:50, 8 December 2024)
- ML20203N953 + (01:58:52, 8 December 2024)
- ML20203N955 + (01:58:52, 8 December 2024)
- ML20203N950 + (01:58:53, 8 December 2024)
- ML20203N947 + (01:58:53, 8 December 2024)
- ML20203N946 + (01:58:54, 8 December 2024)
- ML20203N944 + (01:58:55, 8 December 2024)
- IR 05000424/1986017 + (01:58:57, 8 December 2024)
- ML20203N941 + (01:58:58, 8 December 2024)
- ML20203N942 + (01:58:58, 8 December 2024)
- ML20203N939 + (01:58:59, 8 December 2024)
- ML20203N940 + (01:58:59, 8 December 2024)
- ML20203N938 + (01:59:00, 8 December 2024)
- ML20203N936 + (01:59:01, 8 December 2024)
- ML20203N935 + (01:59:01, 8 December 2024)
- IR 05000254/1986007 + (01:59:02, 8 December 2024)
- ML20203N933 + (01:59:03, 8 December 2024)
- ML20203N932 + (01:59:03, 8 December 2024)
- ML20203N929 + (01:59:04, 8 December 2024)