Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317B486 + (21:53:43, 7 January 2025)
- ML17317B484 + (21:53:44, 7 January 2025)
- ML17317B483 + (21:53:45, 7 January 2025)
- ML17317B476 + (21:53:46, 7 January 2025)
- ML17317B481 + (21:53:46, 7 January 2025)
- 05000315/LER-1979-039, Updated LER 79-039/03L-0 on 790720:control Sys Repaired to Deliver Larger Quantity of Acid to Rcs.No Further Action Planned + (21:53:50, 7 January 2025)
- 05000315/LER-1979-030, Updated LER 79-030/03X-1 on 790417:design Change Coupled W/Relay Degradation Caused Relay to React Slower During Sequence.Design Change RFC-DC-12-2384 Installed as Preventive Measure + (21:53:54, 7 January 2025)
- 05000315/LER-1979-022, Updated LER 79-022/03X-1 on 790323:to Prevent Recurrence of Nearly Simultaneous Bus Failures,Battery Equalizing Charge Has Been Reduced from 280 to 275 Volts.Addl Design Change Requested to Provide Overvoltage Alarm to Alert Op + (21:53:55, 7 January 2025)
- 05000316/LER-1979-025, /03L-0 on 790723,previously Issued as LER 79-025/03L-0:while Reviewing Computer Printout,Discovered K 0900 Address Not Reset to 0 Prior Ro Scanning Core.Temporary Change Sheet Issued + (21:53:57, 7 January 2025)
- 05000315/LER-1978-065, Updated LER 78-065/03X-1 on 781229:previous Rept of Inoperable Pressurizer Level Channel Is No Longer Considered RO Due to Recent Tech Spec Change Deleting All Pressurizer Low Level Operability Requirements + (21:53:59, 7 January 2025)
- IR 05000461/2017502 + (21:54:01, 7 January 2025)
- ML17317B467 + (21:54:02, 7 January 2025)
- 05000316/LER-1979-026, Forwards LER 79-026/03L-0 & Corrected Copy of LER 79-025/03L-0 + (21:54:03, 7 January 2025)
- ML17317B463 + (21:54:05, 7 January 2025)
- ML17317B464 + (21:54:05, 7 January 2025)
- ML17317B459 + (21:54:06, 7 January 2025)
- ML17317B461 + (21:54:06, 7 January 2025)
- ML17317B458 + (21:54:08, 7 January 2025)
- IR 05000315/1979005 + (21:54:09, 7 January 2025)
- ML17317B457 + (21:54:09, 7 January 2025)
- ML17317B453 + (21:54:11, 7 January 2025)
- ML17317B452 + (21:54:12, 7 January 2025)
- ML17317B448 + (21:54:13, 7 January 2025)
- ML17317B447 + (21:54:15, 7 January 2025)
- ML17317B446 + (21:54:16, 7 January 2025)
- ML17317B444 + (21:54:17, 7 January 2025)
- ML17317B443 + (21:54:18, 7 January 2025)
- ML17317B442 + (21:54:19, 7 January 2025)
- ML17317B440 + (21:54:20, 7 January 2025)
- IR 05000315/1979016 + (21:54:22, 7 January 2025)
- ML17317B436 + (21:54:23, 7 January 2025)
- ML17317B435 + (21:54:25, 7 January 2025)
- 05000315/LER-1979-036-03, /03L-0 on 790709:two Ice Condenser Intermediate Deck Doors Found Frozen Shut.Cause Not Determined.Ice Chipped Off & Doors Returned to Operable Status + (21:54:26, 7 January 2025)
- 05000315/LER-1979-037-03, /03L-0 on 790709:position of Certain Control Bank C Rods Exceeded 12-step Limit Imposed by Tech Specs. Caused by Drifting of Rod Signal Conditioning Module + (21:54:28, 7 January 2025)
- 05000315/LER-1979-037, Forwards LER 79-037/03L-0 & Revised LER 79-034/03L-0, Changing Rept Number to 79-036/03L-0 + (21:54:29, 7 January 2025)
- 05000316/LER-1979-025-03, /03L-0 on 790709:while Reviewing Axial Power Distribution Monitoring Sys Printouts,Discovered Two Occasions in Which Results of Only One Detector Scan Printed Out.Cause Under Investigation + (21:54:31, 7 January 2025)
- ML17317B426 + (21:54:35, 7 January 2025)
- ML17317B425 + (21:54:37, 7 January 2025)
- ML17317B424 + (21:54:37, 7 January 2025)
- ML17317B423 + (21:54:39, 7 January 2025)
- ML17317B422 + (21:54:40, 7 January 2025)
- ML17317B421 + (21:54:41, 7 January 2025)
- ML17317B420 + (21:54:42, 7 January 2025)
- ML17317B419 + (21:54:43, 7 January 2025)
- ML17317B414 + (21:54:44, 7 January 2025)
- ML17317B416 + (21:54:44, 7 January 2025)
- 05000315/LER-1979-035-03, /03L-0 on 790705:while Cleanup of Demineralized Water Sys Was in Process,Rcs Passed from Operational Mode 5 to Mode 4 & Isolation Valves Closed.Caused by Breakdown of Communication Between Cleanup Crew & Reactor Operator + (21:54:46, 7 January 2025)
- 05000315/LER-1979-034, /03L-0 on 790705:during Plant Tour,Two Ice Condenser Intermediate Deck Doors Were Found Frozen Shut. Cause Not Determined.No Further Action Planned.Formerly Numbered Incorrectly as LER 79-034/03L-0 + (21:54:47, 7 January 2025)
- ML17317B410 + (21:54:48, 7 January 2025)
- ML17317B409 + (21:54:49, 7 January 2025)
- 05000316/LER-1979-024-03, /03L-0 on 790702:south Boric Acid Storage Tank & Boron Injection Tank Were Out of Spec While Unit Was in Hot Standby.Caused by Normal Fluctuation.Boric Acid Was Transferred to Tank + (21:54:53, 7 January 2025)