ML17317B442

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-18, Audibility Problems Encountered on Evacuation of Personnel from High Noise Areas. Action Required
ML17317B442
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/07/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 7908150283
Download: ML17317B442 (1)


Text

AUG 7 1979 CENTRAL Ajar@

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 79-18 is forwarded to you for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 79-18 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII Heis an/sr p ler 8/6/79