ML17317B423
| ML17317B423 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/09/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| References | |
| NUDOCS 7908130294 | |
| Download: ML17317B423 (2) | |
Text
CENTRAL FILES Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
Me have received several licensee inquiries regarding the use of the OPX (Initial Notification/Reactor Operations) system during drills.
Licensees are encouraged to use the system if the drill scenario requires initial noti-fication of the NRC; however, care should be exercised in assuring that the NRC Duty Officer is informed that such calls are dr'ills.
Sincerely, James G. Keppler Director cc:
Mr. D. V. Shaller, Plant Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment 190813~z>q RIII RIII Januska/bk Essig RIII Davis RIII Kepplek 7/6/79
r C
r