ML17317B440

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-315/79-14 & 50-316/79-11 on 790529-0601 & Notice of Violation
ML17317B440
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/25/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17317B441 List:
References
NUDOCS 7908150280
Download: ML17317B440 (4)


See also: IR 05000315/1979014

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

dN Z5 1919

Docket No. 50-315

Docket No. 50-316

CENTRAL FILES

American Electric Power Service

Corporation

Indiana and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

and Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the inspection

conducted

by Mr. M. C.

Schumacher

of this office on May 29 June

1,

1979, of activities at

Donald C.

Cook Nuclear Plants

1 and

2 authorised

by NRC Licenses

DPR-58 and DPR-74 and to the discussion of our findings with

Mr. Shaller

and others of your staff at the conclusion of the

inspection.

The enclosed

copy of our inspection report identifies areas

examined during the inspection.

Within these areas,

the

inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements,

as described

in the enclosed

Appendix A.

This notice is sent to you pursuant

to the provisions of

Section

2.201 of the NRC's "Rules of Practice," Part 2, Title

10,

Code of Federal Regulations.

Section

2. 201 requires

you

to submit to this office within twenty days of your receipt

of this notice a written statement

or explanation in reply,

including for each item of noncompliance:

(1) corrective

action taken and the results

achieved;

(2) corrective action

to be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

'3 li"! b'Nl'Al">

kaerican Electric Power Service

-2-

gg'P

$979

Corporation

Indiana and Michigan Power Company

L

4

r

In accordance with Section 2.790 of the NRC's "Rules af

Practice," Part 2, Title 10, Code of Federal Regulations,

a

copy of this letter, the enclosures,

and your response

to

this letter villbe placed in thc HRC's Public Document

Room,

except as follows. If the enclosures

contain information

that you or your contractors believe to be proprietary,

you

must apply in vriting to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure.

The application must include a full

statement of the reasons for which the information is con-

sidered proprietary,

and should be prepared

so that proprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss

any questions

you have conc4mxing this

inspection.

Sincerely,

k. B. Davis, Chief

Fuel Faci.lity and

Materials Safety Branch

Enclosures:

l.

Appendix h, Notice of

Violation

2.

IB Inspection Report

Ho. 50-315/79-14

and

Ho. 50-316/79-11

cc v/encls:

D. V. Shaller, Plant Manager

Central Piles

Reproduction Unit NRC 20b

PDR

Local PDR

HSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Citizens for a Better

r

CI'I.

wC

'I ~

oFFICE> RIII.

Schumach r/g

3LIII

Fisher(p'

RIII.

Masse

aL>9Jz9.

DAT~

NRC Form 318B (R ZZZ) {1-78) NRCM 0240

~U,S.OOVKRNMENTPRIN INO OFFICER

1072

2SS417