ML17317B448

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/79-13 & 50-316/79-10 on 790505-31 & Notice of Violation
ML17317B448
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/25/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17317B450 List:
References
NUDOCS 7908150357
Download: ML17317B448 (3)


See also: IR 05000315/1979013

Text

gas AEVI

II ~

++*++

UNITEDSTATES

CLEAR REGULATORY COMMISSI

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

t;Fm~AL FlLFS

JUN 25

1979

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan, Vice

Chairman,

Engineering

and

Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the inspection

conducted

by Messrs.

R. E.

Masse

and

K. R. Baker of this office on May 5-31,

1979, of activities at

Donald

C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC Operating

Licenses

No. DPR-58 and No. DPR-74 and to the discussion of our findings

with Mr. Shaller

and others of your staff at the conclusion of the

inspection.

The enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted of a

selective

examination of procedures

and representative

records,

obser-

vations,

and interviews with personnel.

During this inspection,

certain of your activities appeared

to be in

noncompliance

with'NRC requirements,

as described in the enclosed

Appendix A.

This notice is sent. to you pursuant to the provisions of Section 2.201 of

the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section

2.201 requires

you to submit to this office within

twenty days of your receipt of this notice

a written statement

or explanation

in reply, including for each item of noncompliance:

(1) corrective action

taken

and the results

achieved;

(2) corrective action to be taken to

avoid further noncompliance;

and (3) the date

when full compliance will

be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal Regulations,

a copy of this letter, the

enclosures,

and your response

to this letter will be placed in the NRC's

Public Document

Room, except

as follows. If the enclosures

contain

'I908> 60 gW

I

>Jf

( 'gp

American Electric Power

Service Corporation

-2-

JUN 25

1979

information that you or your contractors believe to be proprietary,

you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The

application must include

a full statement

of the reasons

for which the

information is considered proprietary,

and should be prepared

so that

proprietary information identified in the application is contained in an

enclosure

to the application.

We will gladly discuss

any questions

you have concerning this

inspection.

Sincerely,

R. F. Heishman,

Chief

Reactor Operations

and

Nuclear Support Branch

'nclosures:

l.

Appendix A, Notice

of Violation

IE Inspection Reports

No. 50-315/79-13

and

No. 50-316/79-10

cc w/encls:

D. V. Shaller, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

I.ocal

PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service

Commission

Executive Director, Citizens

for a Better Environment

RISHI

~Masse/sr

6/19/79

RI I

Boyd

RII)

<oker

RII

treeter

RIII

shman