Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000315/LER-1998-056, :on 981211,hot Leg Nozzle Gaps Resulted in Plant Being in Unanalyzed Condition.Analyses Are Being Performed by W to Resolve Problem.Updated LER Will Be Submitted by 990211.With + (18:18:55, 7 January 2025)
- ML17335A468 + (18:18:57, 7 January 2025)
- TAC:M99980 + (18:18:58, 7 January 2025)
- ML17335A467 + (18:18:59, 7 January 2025)
- 05000315/LER-1998-049, :on 981020,emergency Boron Injection Flow Path Was Inoperable.Caused by Original Design Deficiency. Engineering Evaluation of Event Is Continuing + (18:19:00, 7 January 2025)
- 05000315/LER-1998-054, :on 981202,discovered That at Least One MSSV Had Not Been Reset as Required by Ts.Engineering Is Continuing Review of Extent of Condition for Event.Updated LER Will Be Submitted by 990129.With + (18:19:03, 7 January 2025)
- ML17335A462 + (18:19:04, 7 January 2025)
- TAC:M94871 + (18:19:06, 7 January 2025)
- ML17335A461 + (18:19:06, 7 January 2025)
- ML17335A459 + (18:19:08, 7 January 2025)
- IR 05000315/1998021 + (18:19:34, 7 January 2025)
- ML17335A454 + (18:19:36, 7 January 2025)
- ML17335A452 + (18:19:37, 7 January 2025)
- ML17335A451 + (18:19:38, 7 January 2025)
- TAC:M99498 + (18:19:41, 7 January 2025)
- ML17335A449 + (18:19:43, 7 January 2025)
- 05000315/LER-1998-053, :on 981130,discovered Use of Inoperable Substitute Subcooling Margin Monitor.Caused by Condition Existing Since Installation of Plant Process Computer in 1992.Updated LER Will Be Submitted.With + (18:19:44, 7 January 2025)
- TAC:M90175 + (18:19:45, 7 January 2025)
- ML17335A447 + (18:19:47, 7 January 2025)
- ML17335A446 + (18:19:48, 7 January 2025)
- ML17335A444 + (18:19:50, 7 January 2025)
- ML17335A439 + (18:19:51, 7 January 2025)
- IR 05000315/1998029 + (18:19:52, 7 January 2025)
- TAC:M99496 + (18:19:54, 7 January 2025)
- ML17335A431 + (18:19:54, 7 January 2025)
- ML17335A429 + (18:19:55, 7 January 2025)
- 05000315/LER-1998-051, :on 981122,reactor Trip Signal from Manual Safety Injection Not Verified as Required by TS Surveillance,Was Discovered.Maintenance Currently Evaluating Significance & Cause of Event + (18:19:57, 7 January 2025)
- ML17335A426 + (18:19:59, 7 January 2025)
- TAC:M98435 + (18:20:00, 7 January 2025)
- ML17335A422 + (18:20:00, 7 January 2025)
- ML17335A419 + (18:20:02, 7 January 2025)
- ML17335A420 + (18:20:02, 7 January 2025)
- 05000315/LER-1998-050, :on 980814,ancillary Equipment Installed in Ice Condenser Was Not Designed to Withstand Design Basis Accident/Earthquake Loads.Caused by Lack of Established Design Criteria.Developed Design Criteria + (18:20:04, 7 January 2025)
- 05000315/LER-1998-058, :on 981216,postulated High Line Break Could Result in Condition Outside Design Bases for AF Occurred. Caused by Deficiencies Associated with Administration of HELB Program.Analysis of AF Will Be Completed by 990122 + (18:20:07, 7 January 2025)
- 05000315/LER-1998-047, :on 981117,potential for Increase Leakage from Reactor Coolant Pump Seals Was Identified.Util Is Working with W to Resolve Issue.Current Expectations Are to Submit Update to LER by 990215.With + (18:20:09, 7 January 2025)
- ML17335A410 + (18:20:10, 7 January 2025)
- ML17335A409 + (18:20:11, 7 January 2025)
- ML17335A408 + (18:20:12, 7 January 2025)
- ML17335A407 + (18:20:13, 7 January 2025)
- TAC:M99116 + (18:20:14, 7 January 2025)
- ML17335A405 + (18:20:14, 7 January 2025)
- ML17335A404 + (18:20:17, 7 January 2025)
- ML17335A403 + (18:20:18, 7 January 2025)
- ML17335A400 + (18:20:19, 7 January 2025)
- ML17335A395 + (18:20:20, 7 January 2025)
- ML17335A397 + (18:20:20, 7 January 2025)
- ML17335A394 + (18:20:21, 7 January 2025)
- IR 05000315/1998025 + (18:20:25, 7 January 2025)
- ML17335A391 + (18:20:27, 7 January 2025)
- ML17335A390 + (18:20:29, 7 January 2025)
- ML17335A389 + (18:20:29, 7 January 2025)