Forwards Insp Repts 50-315/98-21 & 50-316/98-21 on 981016-1203 & Notice of Violation Re Failure to Ensure That TS Requirement Involving Boration Sys Flow Path Verification Was Being Met by Appropriate Surveillance Procedure
ML17335A452
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/28/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17335A453 List:
References
50-315-98-21, 50-316-98-21, NUDOCS 9901060112
Download: ML17335A452 (5)


See also: IR 05000315/1998021

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTXON SYSTEM

(RZDS)

~

~

ACCESSION NBR:9901060112

DOC.DATE: 98/12/28

NOTARIZED: NO

FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

M

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana

M

AUTH.NAME

AUTHOR AFFILIATION

GROBE,J.A.

Region

3

(Post

820201)

RECIP . NAME

RECIPIENT AFFILIATION

POWERS,R.P.

American Electric Power Co., Inc.

SUBJECT: Forwards insp repts

50-315/98-21

&. 50-316/98-21

on

981016-1203.Violation noted.

DISTRIBUTION CODE: IE01F

COPXES RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

N

05000315

05000316

E

RECIPIENT

ID CODE/NAME

PD3-3

PD

INTERNAL: AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

TERNAL: LZTCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

'

1

1

-1

1

1

1

1

1

1

1

RECXPXENT

ID CODE/NAME

STANG, J

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

U

LOADED FROM

ELECTRONIC FILE

E

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE HASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

/

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

17

ENCL

17

~R Af:gy

(4

P

~4

O

Cy

A.

O

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION III

601 WARRENVILLEROAD

LISLE. II LINCQ60$@$

351

Mr. R. P. Powers

Senior Vice President

Nuclear Generation Group

American Electric Power Company

500 Circle Drive

Buchanan, Ml 49107-1395

SUBJECT:

D. C. COOK INSPECTION REPORT 50-315/98021(DRP); 50-316/98021(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Powers:

On December 3, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2

reactor facilities. The inspection was an examination of activities conducted under your license

as they relate to compliance with the Commission rules and regulations and with the conditions

of your license.

Areas reviewed included Operations, Maintenance, Engineering, and Plant

Support. Within these areas, the inspection consisted of selective examinations of procedures

and representative

records, interviews with personnel, and observations of activities in

progress.

The enclosed report presents the results of that. inspection.

Overall, plant activities were conducted in a safe manner.

The inspectors noted that your self-

assessment

program has shown improvement resulting from the implementation of a number of

corrective actions.

Plant Performance Assurance (PPA) questioning of plant performance has

improved along with the methods that PPA has been utilizing to measure plant performance.

The inspectors also noted conservative decision making during a diesel generator surveillance,

and your staff promptly assessed

buildings and grounds damage following a severe wind storm.

While the self-assessment

program showed improvement, the inspectors continued to have

concerns regarding the adequacy of corrective actions to resolve surveillance program

weaknesses.

A violation was identified involving the failure to ensure that a Technical

Specification requirement involving boration system flow path verification was being met by an

appropriate surveillance procedure.

The inspectors also reviewed two surveillance procedures

which had been through the review process outlined in the surveillance program restart strategy

document and identified two fundamental discrepancies which should have been identified by

your staff during their detailed reviews. Your continued emphasis to your staff on the

importance of attention to details in implementing corrective actions to resolve surveillance

program weaknesses

appears warranted.

In addition, we were concerned about a non-cited violation involving the operation of

safety-related equipment in a manner not directed by a procedure.

Specifically, your staff

identified that on October 23, 1998, the Unit 1 control room crew inappropriately used "skill of

the trade" to start a second Residual Heat Removal (RHR) pump with the reactor coolant

system vented to atmosphere.

That operation of the RHR system was not consistent with plant

procedures and resulted in operating contrary to the UFSAR.

9905060ii2 98i228

PDR

ADQCK 050003i5

8

PDR

R. Powers

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the

enclosures willbe placed in the NRC Public Document Room.

Sincerely,

/s/John

A. Grobe

Docket Nos.: 50-315; 50-316

License Nos.: DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

cc w/encls:

1 ~

Notice of Violation

2.

Inspection Report 50-315/98021(DRP);

50-316/98021(DRP)

J. Sampson, Site Vice President

R. Eckstein, Chief Nuclear Engineer

D. Cooper, Plant Manager

R. Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Emergency Management

Division

MI Department of State Police

D. Lochbaum, Union of Concerned Scientists

DOCUMENT NAME: G:(COOIODCC98021.DRP

To receive a copy ofthis document, indicate in the box "C" = Copy w/o attach/encl "E" =

Co

w/attach/encl "N" = No co

OFFICE

RIII

NAME

Philli s:d

DATE

12/ /98

Rill

Rill

Grob

Ve el

12/M8

1

8

OFFICIALRECORD COPY

R. Powers

Distribution:

RRB1 (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encls

J. Caldwell, Rill w/encls

C. Pederson, Rill w/encls

B. Clayton, Rill w/encls

SRI DC Cook w/encls

DRP w/encls

TSS w/encis

DRS (2) w/encls

Rill PRR w/encls