Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17335A554 + (18:16:59, 7 January 2025)
- 05000315/LER-1999-023, :on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented + (18:17:01, 7 January 2025)
- ML17335A549 + (18:17:04, 7 January 2025)
- ML17335A548 + (18:17:06, 7 January 2025)
- ML17335A546 + (18:17:07, 7 January 2025)
- ML17335A545 + (18:17:08, 7 January 2025)
- ML17335A544 + (18:17:09, 7 January 2025)
- ML17335A543 + (18:17:10, 7 January 2025)
- ML17335A541 + (18:17:11, 7 January 2025)
- ML17335A539 + (18:17:12, 7 January 2025)
- IR 05000315/1999008 + (18:17:16, 7 January 2025)
- ML17335A532 + (18:17:17, 7 January 2025)
- ML17335A531 + (18:17:19, 7 January 2025)
- ML17335A530 + (18:17:19, 7 January 2025)
- ML17335A529 + (18:17:20, 7 January 2025)
- ML17335A528 + (18:17:20, 7 January 2025)
- ML17335A524 + (18:17:21, 7 January 2025)
- ML17335A527 + (18:17:21, 7 January 2025)
- ML17335A520 + (18:17:23, 7 January 2025)
- ML17335A521 + (18:17:23, 7 January 2025)
- ML17335A519 + (18:17:24, 7 January 2025)
- 05000315/LER-1999-002, :on 990112,determined That RCS Pressurizer PORVs Had Not Been Tested,Per Ts.Caused by Inadequate Scheduling Controls Allowing Personnel Error.Surveillance Procedure Was Completed & Updated LER Will Be Submitted + (18:17:28, 7 January 2025)
- 05000315/LER-1999-001, :on 990106,noted That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification.Caused by Operating Experience Info Incorrectly Dispositioned in 1985. Updated LER Will Be Submitted by 990405 + (18:17:31, 7 January 2025)
- IR 05000315/1998030 + (18:17:33, 7 January 2025)
- ML17335A508 + (18:17:35, 7 January 2025)
- IR 05000315/1998027 + (18:17:51, 7 January 2025)
- ML17335A505 + (18:17:53, 7 January 2025)
- ML17335A506 + (18:17:53, 7 January 2025)
- ML17335A503 + (18:17:55, 7 January 2025)
- ML17335A502 + (18:17:56, 7 January 2025)
- 05000315/LER-1998-060, :on 981231,identified That RT Sys Response Time Testing Did Not Comply with TS Definition.Caused by Inadequate Procedures.Corrective Actions Will Be Developed & Update to LER Will Be Submitted by 990415.With + (18:17:58, 7 January 2025)
- ML17335A500 + (18:17:58, 7 January 2025)
- IR 05000315/1998017 + (18:18:09, 7 January 2025)
- ML17335A497 + (18:18:10, 7 January 2025)
- 05000315/LER-1998-057, :on 981228,discovered That AFW Valves Were Not Tested IAW Inservice Testing Program.Caused by Failure to Recognize Design Bases Features Re Afws by Personnel. Updated LER Will Be Submittted by 990415.With + (18:18:12, 7 January 2025)
- 05000315/LER-1998-059, :on 981230,interim LER -single Failure in Containment Spray Sys Could Result in Containment Spray Ph Outside Design Occurred.Investigation Into Condition Continuing.Update Will Be Submitted by + (18:18:14, 7 January 2025)
- ML17335A494 + (18:18:15, 7 January 2025)
- ML17335A493 + (18:18:15, 7 January 2025)
- 05000315/LER-1998-052, :on 981128,no Analysis for NSR Sc Manual Loader for Tdafwp Could Be Found in Original Design.Cause Due to All Failure Modes Not Considered When Compressed Air Sys Originally Designed.Performed Review of Components + (18:18:20, 7 January 2025)
- 05000315/LER-1998-052-01, Forwards LER 98-052-01,re Potential Failure Mode for Air Operated Components Not Considered in Original Design. Interim LER Has Been Updated to Include Two Addl Instances of Same Failure Mode + (18:18:22, 7 January 2025)
- IR 05000315/1998023 + (18:18:31, 7 January 2025)
- ML17335A485 + (18:18:33, 7 January 2025)
- ML17335A486 + (18:18:33, 7 January 2025)
- ML17335A483 + (18:18:34, 7 January 2025)
- ML17335A484 + (18:18:34, 7 January 2025)
- PNO-III-98-025, on 980313,outage Extended Due to Util Decision to Melt 2.59 Million Pounds of Ice in Ice Condenser,Inspect Ice Condenser Components,Make Necessary Repairs & Fill Conndenser Baskets + (18:18:36, 7 January 2025)
- PNO-III-98-018, several Ice Condenser Problems Extended Outage.Two Units Shutdown Since Sept 1997 to Resolve Unrelated Issues Identified by NRC architect-engineering Insp + (18:18:38, 7 January 2025)
- PNO-III-99-003, on 990114,licensee Announced That Startup of Both Units Will Be Delayed While Expanded Engineering Reviews of Important Plant Sys Are Being Performed.New Restart Schedule Should Be Available in May + (18:18:40, 7 January 2025)
- ML17335A479 + (18:18:42, 7 January 2025)
- PNO-III-98-004, problems with Containment Hydrogen Skimming Lines & with Solid State Protection Sys Relays Delayed Startup from 980107 Until 980118.Licensee Discovered Cracks in Covers to 38 Master Relays + (18:18:44, 7 January 2025)
- PNO-III-97-086, on 971015,contract Worker Alarmed Radiation Monitor Upon Exiting Plant Radiologically Controlled Area. Identified Source of Contamination on Inside of Workers Shoe.Contamination Occurred Prior to Arrival on Site + (18:18:46, 7 January 2025)