Submits Overview of Updated Plant Restart Plan & Schedule
ML17335A485
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/18/1999
From: Powers R
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1282B, NUDOCS 9901220339
Download: ML17335A485 (4)


Text

CATEGORY 1

~ g REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

)

ACCESSION NBR:9901220339 DOC.DATE: 99/01/18 NOTARIZED: NO FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 DOCKET I 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION POWERS,R.P. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Submits overview of updated plant restart plan &, schedule.

DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES:

RECIPIENT , COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD STANG,J INTERNAL FILE CENT NRR/DSSA/SRXB/B RGN3 FILE 01 EXTERNAL: NOAC NRC PDR 1 1 G

C WASTETH NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 7 ENCL

American Electric

~r'gaea pic P~

One Cook Race B~RtJJcer(5 6r6~5901

%HERMAN EMCFRSC POWER January 18, 1999 AEP:NRC:1282B Docket Nos.: 50-315 50-.316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, DC 20555-0001 Gentlemen:

Donald C. Cook Nuclear Plant Units 1 and 2 Overview of Updated Plant Restart Plan an'd Schedule On January 14, 1999, Indiana Michigan Power Company (I&M), the Licensee for the Donald C. Cook Nuclear Plant, announced a revision to the current restart plan and schedule for D. C. Cook Unit: 1. 'he change was necessary to align the restart. schedule with additional activities determined to be necessary for a successful restart of unit 1. Specifically, IGM will conduct enhanced system readiness reviews for select D.C. Cook plant systems. The purpose of these reviews is to assess the conformance of. the plant design, maintenance, operation, and testing with the design and licensing requirements. The resolution of the restart required issues evolving from this effort will provide additional assurance that the plant systems are capable of meeting their functional requirements and operating within their design and licensing basis.

Following the completion of the enhanced system readiness reviews, an integrated restart schedule for Unit 1 will be developed. The scope and the duration of this schedule will be dependent on the results of the enhanced readiness reviews. Similarly, an integrated restart schedule will be developed for unit 2 and submitted at a later date.

Copies of this letter are being transmitted to the Michigan Public Service Commission and Michigan Department of Public Health, in accordance with the requirements of 10 CFR 50.91.

o<OO~= 'D

'rr'rr0122033'rr 'rr90 18 PDR ADQCK i

050003i5

~l P PDR

U. S. Nuclear Regulatory Commission AEP:NRC:1282B Page 2 If you have any further questions, please contact Mr. Gordon Arent, Acting Licensing Manager at 616-697-5064.

Sincerely, R. P. Powers Vice President Attachments

/jmc CC: J. A. Abramson J. L. Caldwell Cindy Carpenter, NRC Washington, DC J.A. Grobe, NRC, Region III, Division of Reactor Safety MDEQ - DW & RPD NRC Resident Inspector J. R. Sampson