Forwards Insp Repts 50-315/98-27 & 50-316/98-27 on 981204-990113 & Nov.Areas Reviewed Included Operations, Maint,Engineering & Plant Support
ML17335A503
Person / Time
Site: Cook  
Issue date: 02/09/1999
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17335A504 List:
References
50-315-98-27, 50-316-98-27, NUDOCS 9902170347
Download: ML17335A503 (6)


See also: IR 05000315/1998027

Text

an.X DNVD.l

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902170347

DOC.DATE: 99/02/09

NOTARIZED: NO

" ACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

M

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana

M

AUTH.NAME

AUTHOR AFFILIATION

GROBE,J.A.

Region

3

(Post

820201)

RECIP.NAME

RECIPIENT AFFILIATZON

POWERS,R.P.

American Electric Power Co., Inc.

SUBJECT:

Forwards insp repts

50-315/98-27

6 50-316/98-27

on

981204-990113

6 NOV.Areas reviewed included operations,

maint,engineering

6 plant support.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt) -Insp Rept/Notice of Violation Response

NOTES:

DOCKET

05000315

05000316

E

INTERNAL:

RECIPIENT

'ID CODE/NAME

PD3-3

PD

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

l..

1

~

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

STANG, J

AEOI

CENTER

NRR DRPM PECB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

'

1

1

1

1

1

1

1

1'

1

ERNAL: LITCO BRYCE,J H

NRC PDR

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

0

C

l.OAQEQ FAUTE

KZ~OMCFKF-

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM'DISTRIBUTION LISTS

OR REDUCE THE NUMBER=OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

17

ENCL

17

~p,8 Rfgy

0

cv

00

~n

w*<<+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

801 WARRENVILLEROAD

LISLE. ILLINOIS60532-4351

February

9,

1999

Mr. R. P. Powers

Senior Vice President

Nuclear Generation Group

American Electric Power Company

'00

Circle Drive

Buchanan, Ml 49107-1395

SUBJECT:

D. C: COOK INSPECTION REPORT 50-315/98027(DRP); 50-316/98027(DRP)

- AND NOTICE OF VIOLATION

Dear Mr. Powers:

On January 13, 1999, the NRC completed an inspection at your D. C. Cook Units 1 and 2

reactor facilities. The inspection was an examination of activities conducted under your license

as they relate to compliance with the Commission rules and regulations and with the conditions

of your license.

Areas reviewed included Operations, Maintenance, Engineering, and Plant

Support.

Within these areas, the inspection consisted of selective examinations of procedures

and representative

records, interviews with personnel, and observations of activities in

progress.

The enclosed report presents the results of that inspection.

The inspectors observed examples of prompt involvement by you and members of your

management staff when safety significant issues were raised by plant personnel and NRC

inspectors.

Specifically, your decision to delay the scheduled

B engineered safety feature train

outage until completion of the Train A affirmation was prudent and conservative.

In addition,

the inspectors observed that Performance Assurance personnel were performing pro-active

assessments

and identifying safety significant issues.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occured.

The violation is cited in the enclosed Notice of Violation (Notice)

and the circumstances

surrounding it are described in detail in the subject inspection

report. The inspectors also observed several examples of operability evaluations that were of

poor quality. Contributing to the poor quality of the operability evaluations was the lack of clear

procedural guidance on compensatory measures

given to the operations staff, and the lack of

procedural compliance by the engineering staff concerning operability evaluations which

resulted in a violation identified by the NRC.

In addition, the inspectors observed that the plant

material condition was degrading.

As plant material condition items continue to be identified,

the need for good quality operability evaluations will become even greater and we encourage

you to continue your efforts to correct the operability evaluation process.

We recognize that the

increase in the backlog of equipment problems is due, in part, to the impact of some of your

major improvement initiatives. However, it is important that the material condition of the plant is

maintained sufficiently to ensure that the design function of systems is not affected.

7902170347

990209

PDR

ADOCK 05000315

8

PDR

l

R. Powers

-2-

The NRC has concluded that information regarding the reason for the violation, the corrective

actions taken and planned to correct the violation and prevent recurrence

is already adequately

addressed

on the docket in this inspection report. Therefore, you are not required to respond to

this letter unless the description therein does not accurately reflect you corrective actions or

your position.

In that case, or ifyou choose to provide additional information, you should follow

the instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the

enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/John

A. Grobe

Docket Nos.: 50-315; 50-316

License Nos.: DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

1. Notice of Violation

2. Inspection Report 50-315/98027(DRP);

50-316/98027(DRP)

cc w/encls:

J. Sampson,

Site Vice President

M. Rencheck, Vice President, Nuclear Engineering

D. Cooper, Plant Manager

R. Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Emergency Management

Division

Ml Department of State Police

D. Lochbaum, Union of Concerned Scientists

See Previous Concurrences

DOCUMENT NAME: G:iCOOKiDCC98027.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =

Co

w/attach/encl "N" = No co

OFFICE

RIII

NAME

Philli s:co

r

DATE

2/ 5 /99

Rill

Ve el

2/~ /99

Rill

Heller

2/

/99

Rill

Gro

2/

/99

OFFICIAL RECORD COPY

R. Powers

Distribution:

RRB1 (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encls

J. Caldwell, Rill w/encls

B. Clayton, Rill w/encis

SRI DC Cook w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rill PRR w/encls

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

R. Powers

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Docket Nos.: 50-315; 50-316

License Nos.: DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

cc w/encls:

1. Notice of Violation

2. Inspection Report 50-315/98027(DRP);

50-316/98027(DRP)

J. Sampson, Site Vice President

M. Rencheck, Vice President, Nuclear Engineering

D. Cooper, Plant Manager

R. Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Emergency Management

Division

Ml Department of State Police

D. Lochbaum, Union of Concerned Scientists

DOCUMENT NAME: G:ECOOKiDCC98027.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =

Co

w/attach/encl "N" = No co

OFFICE

Rill

N

Rill

Rill

Rill

NAME

DATE

Philli s:co

2/

/99

Hel

43K

Ve el

2/

/99

2/

/99

OFFICIAL RECORD COPY

Grobe

2/

/99