ML17335A494

From kanterella
Jump to navigation Jump to search
Informs NRC of Desire to Defer Number of Insps NRC Currently Has Scheduled for Dec 1998 & Jan 1999.Requests That Insps for Listed Items Be Postponed
ML17335A494
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/18/1998
From: Sampson J
INDIANA MICHIGAN POWER CO.
To: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
AEP:NRC:90358B, NUDOCS 9902020111
Download: ML17335A494 (5)


Text

CATEGORY 1 ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902020111 DOC.DATE: 98/12/18 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION SAMPSON,J.R.

Indiana Michigan Power Co.

RECIP. NAME RECIPIENT AFFILIATION GROBE,J.A.

Region 3

(Post 820201)

SUBJECT:

Informs NRC of desire to defer number of insps staff currently has scheduled for Dec 1998

&, Jan 1999.IMPCo specifically recgxests that insps for listed items be postponed.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt) -Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DIR RGN3 FILE 01 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME STANG,J AEOD/TTC CENT NRR/DRPM PECB NUDOCS-ABSTRACT OGC/HDS3 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL 0

D C

U M

N NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANZZATZON REMOVED FROM DZSTRZBUTZON LZSTS OR REDUCE THE NUMBER OF COPZES RECEZVED BY YOU OR YOUR ORGANZZATZON, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL

l

Indiana Michigan power Company Cook Ntdaz~

One Cook Ftanz Qgjyga MI491 06 616 465 660<

Z INDIANA MICHIOiAN POWER December 18, 1998 AEP.'-NRC:9035.8,

'8COrI0 RC Mr. John A. Grobe, Director Division of Reactor Safety U.

S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, IL 60532-4351

. z>A Oi'4st-I A ='"

v'hMQ ORMA FlLE EIC SGA Qc pn

Dear Mr. Grobe:

The purpose of this lettex's to in y

'nform ou of our desire to defer a number of inspections your staff curxently have sche u e for Dece er an mb 1998 d January 1999.

We are specificallyittin that the inspections for containment liner pi ',

i d th

'1'orrective action program, surveillance, an feedwater system followup inspection be postponed.

In accordance with the Manual Chapter 0350 process, we will keep d

f the status of these issues and provide notification as to when these issues will be rea y

or inspection.

Sincerely, Site Vice President

/jmc co J.

A. Abramson J.

L. Caldwell MDEQ DW

& RPD NRC Resident Inspector J.

R.

Sampson qq02020111 5000315 PDR ADOCK 0 0

PDR wP

DEC 2 2 SS

U.

S. Nuclear Regulatory Commission Page 2

AEP:NRC:90358B bc.

T.

P.

Beilman J. J.

Euto FOLIO B. J. Hickle G.

Honma D.

F. Kunsemiller/J.

B. Kingseed/G.

P. Arent/M. J.

Gumns M.

W. Rencheck/E.

R. Eckstein/D.

F. Powell/D.

R. Hafer/

K.

RE Baker J.

F. Stang, Jr.,

NRC Washington, DC