Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RAIO-1217-57401, LLC - Response to NRC Request for Additional Information No. 219 (Erai No. 8998) on the NuScale Design Certification Application + (16:39:17, 7 January 2025)
- ML17345A516 + (16:39:17, 7 January 2025)
- W3F1-2017-0080, Submittal of Technical Requirements Manual Update + (16:39:25, 7 January 2025)
- W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 + (16:39:28, 7 January 2025)
- IR 05000250/1988021 + (16:39:30, 7 January 2025)
- L-88-485, Forwards mgt-on-shift Weekly Rept for Wk Starting 881021. Areas for Improvement Include,Communication,Labeling & Resspirator Requirements + (16:39:31, 7 January 2025)
- ML17345A505 + (16:39:34, 7 January 2025)
- L-88-477, Forwards mgt-on-shift Weekly Rept,Per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (16:39:36, 7 January 2025)
- ML17345A503 + (16:39:40, 7 January 2025)
- L-88-489, Informs of Desire to Discuss PRA at 881114 Mgt Meeting + (16:39:41, 7 January 2025)
- L-88-481, Provides Info in Response to Request Re Application of Leak Before Break Technology to Primary Coolant Sys Piping at Plant + (16:39:44, 7 January 2025)
- L-88-475, Provides Supplemental Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss + (16:39:46, 7 January 2025)
- L-88-471, Special Rept:Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Util Making Effort to Obtain Required Parts.Compensatory Measures Continue to Be Implemented as Applicable + (16:39:48, 7 January 2025)
- 05000250/LER-1988-024, :on 881001,RHR Pump Declared Out Svc Due to Leakage from Pump Seal.Cause Not Identified.Seal Cooler Flushed Prior to Reassembly to Remove Foreign Matl & Installation Technique Revised + (16:39:52, 7 January 2025)
- IR 05000250/1988031 + (16:39:54, 7 January 2025)
- ML17345A495 + (16:39:55, 7 January 2025)
- ML17345A494 + (16:39:56, 7 January 2025)
- ML17345A493 + (16:40:00, 7 January 2025)
- IR 05000250/1988024 + (16:40:05, 7 January 2025)
- ML17345A489 + (16:40:07, 7 January 2025)
- IR 05000250/1988026 + (16:40:12, 7 January 2025)
- ML17345A486 + (16:40:14, 7 January 2025)
- ML17345A485 + (16:40:16, 7 January 2025)
- ML17345A484 + (16:40:17, 7 January 2025)
- ML17345A483 + (16:40:18, 7 January 2025)
- IR 05000250/1988027 + (16:40:26, 7 January 2025)
- L-88-472, Forwards Summary Rept of Integrated Schedule Generated for Oct 1988.Schedules Reflect Info as of Issuance Date of 881021 + (16:40:29, 7 January 2025)
- ML17345A480 + (16:40:29, 7 January 2025)
- L-88-465, Responds to Violations Noted in Insp Repts 50-250/88-21 & 50-251/88-21.Corrective Actions:Operator Involved Counseled on Compliance W/Procedures on 880822.Identification Labeling of Subj Equipment Modified to Reflect Protection Channel + (16:40:31, 7 January 2025)
- ML17345A475 + (16:40:35, 7 January 2025)
- ML17345A476 + (16:40:35, 7 January 2025)
- 05000250/LER-1988-023, :on 880926,chemistry Technician Reported That There Was No Flow Indication to Plant Process Radiation Monitor R-19.Caused by Solids from Steam Generator Blowdown. Sample Flows to R-19 Will Be Monitored + (16:40:37, 7 January 2025)
- L-88-466, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/88-25 & 50-251/88-25.Corrective Actions:All Three Fuel Pool Cooling Pump Maint Procedures Will Be Permanently Revised to Provide Adequate Instructions & Drawings + (16:40:44, 7 January 2025)
- IR 05000250/1988018 + (16:40:48, 7 January 2025)
- ML17345A471 + (16:40:49, 7 January 2025)
- L-88-441, Submits Implementation Schedules for Generic Ltr 86-10, Implementation of Fire Protection Requirements. Integrated Schedule Monthly Summary Rept Will Provide Updated Schedule Changes & Restatus Mod 25 Re Alternate Shutdown Panel + (16:40:51, 7 January 2025)
- ML17345A469 + (16:40:51, 7 January 2025)
- 05000251/LER-1988-012-01, :on 880905,control Rod K-12 Dropped from 228 Steps to 0 Step,Causing Turbine Runback to 60% Power.Cause of Drop Under Investigation.Insp of Control Rod K-12 Will Be Performed During Current Refueling Outage + (16:40:55, 7 January 2025)
- ML17345A464 + (16:40:57, 7 January 2025)
- L-88-425, Forwards mgt-on-shift Weekly Rept,Per NRC Order Dtd 871019. Plant Supervisor Nuclear Shift Repts Also Encl + (16:40:58, 7 January 2025)
- ML17345A462 + (16:41:01, 7 January 2025)
- ML17345A461 + (16:41:02, 7 January 2025)
- ML17345A459 + (16:41:03, 7 January 2025)
- IR 05000251/1988025 + (16:41:08, 7 January 2025)
- ML17345A457 + (16:41:10, 7 January 2025)
- ML17345A455 + (16:41:11, 7 January 2025)
- ML17345A454 + (16:41:12, 7 January 2025)
- IR 05000250/1988023 + (16:41:15, 7 January 2025)
- ML17345A451 + (16:41:16, 7 January 2025)
- L-88-411, Responds to NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Results of Eddy Current Insps Will Be Compared to Westinghouse Acceptance Criteria & Nonconformances Will Be Handled,Per Site Procedures + (16:41:17, 7 January 2025)
- ML17345A446 + (16:41:20, 7 January 2025)
- ML17345A444 + (16:41:21, 7 January 2025)