UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 27, 1988 Docket Nos.
50-250 and 50-251 Mr. W. F.
Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
Dear Mr. Conway:
SUBJECT:
IMPLEMENTATION OF SAFETY PARAMETER DISPLAY SYSTEM (SPDS)
AT TURKEY POINT UNITS 3
AND 4 (TAC NOS.
65032 AND 65033)
The purpose of this leiter is to identify opeII items remaining in the implementa-tion of the Safety Parameter Display System (SPDS) at Turkey Point.
These items require action by Florida Power and Lighc Company (FPL) in order to resolve them and close the SPDS issue.
On March 23 through 25, 1987, the NRC staff conducted a post-implemeniation audit of the SPDS at Turkey PoiIIt.
The SPDS was evaluated using criteria in NUREG-0737, Supplement 1.
Recently a Technical Evaluaiion Report (enclosed) based on the audit was completed by our contractor, SAIC.
The NRC staff agrees with the conclusions of that rcport as stated on pages 14-16 in Section 4.0.
The conclu-sions focus on the eight requirements of NUREG-0737, Supplement I.
A conference call was held on October 4, 1988 with members of the FPL staff, and the siatus of the eight items was reviewed.
The FPL participants in that call included:
Russ Gouldy, Tom Grozan, Tom Deplonzy, Gilbert Richardson, Gabe Soloman, Ed Lisinger and Mel Bernard.
It was agreed thai we would send the SAIC report to you, and that FPL would take the necessary actions to resolve th~ remaining items.
We request that you advise us in writing when you have completed the actions necessary to close the SPDS issue.
We also request you advise us within 30 days of receipt of this letter of your schedule for,completing these actions so that we can make our inspection plans.
Please note that the TAC number on the contractor report was a separate and earlier number a>>d is not the appropriate TAC number to reference for this ongoing effort.
88ii020i38 88i027
.PDR ADDCK 05000250 P
PNU j
)ppI. P if@
~
~
Nr.
W. F.. Conway W The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, ONB clearance is not required under P.L. 96-.511.
Sincerely,
Enclosure:
As stated cc w/enclosure:
See next page DISTRIBUTION NRC 0 Local PDRs PDII-2 Rdg.
- SVarga, 14/E/4
- GLainas, 14/H/3 DNilier
- CGoodman, NLN316 original signed by Gordon E. Edison, Sr. Project Nanager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation GEdison OGC (for info. only)
- EJordan, 3302 NNBB BGrimes 9/A/2 ACRS(10)
Gray File
- GWest, 10/D/20
- See previous concurrence LA:PDII-2*
PN: PD II-2*
DNi 1 le r GEdison:bd 10/20/88 10/21/88 HFA WRe n
10/~/88 D:
2 HBer dw 10/g7/88
~I
~
R
'l f
Mr. W. F.
Conway Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. J.
Odom, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Offi ce Box 57-1185 Miami, Flor ida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta 1 1 aha ssee, F1ori da 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. Tom Grozan Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420 Mr. G. Richardson Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420