ML17345A455
| ML17345A455 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/27/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17345A456 | List: |
| References | |
| NUDOCS 8810130095 | |
| Download: ML17345A455 (5) | |
See also: IR 05000251/1988025
Text
~ccEmwTQ.>>LN~QNI.- AKVPWRPWPRN~R*R
ACCESSION NBR:8810130095
DOC.DATE: 88/09/27
NOTAR ZED:
NO.
" FACIL:50-251 Turkey Point 'Plant, Unit 4, Florida Power
and Light C
~
~
~
~
~
RUTH
BYNAME
AUTHOR AFFILIATION
LLINS,D.M.
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONNAY,N.F.
Florida Powe
& Light Co.
DOCKET
05000251
SUBJECT:
Forwards
Insp Rept 50-251/88-25
on 880816-25
a notice of
violation.
DISTRIBUTION CODE:
IE06D
COP1ES
RECEIVED:LTR
~
ENCL
~
SIZE:
gg +
TITLE: Environ
a Radiological
(50 DKT)-Insp Rept/Notice of Violation
NOTES:
ls
R
Respons
RECIPIENT
ID CODE/NAME
PD2-2
LA
EDISON, G
INTERNAL: AEOD/DSP
NMSS/SGOB
4E4
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
E
.02
DSTR
DEPY
RGN2/DRSS/EPRPB
RNAL: LPDR
COPIES
LTTR ENCL
1
0
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME.
PD2-2
NMSS/LLOB
5E4
NRR/DLPQ/PEB ll
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OGC/HDS2
RGN2
FILE
01
RGN4
MURRAYgB
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
.1
1
l.
1
1
h
-
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
22
Docket No. 50-251
License
No.
Florida Power and Light Company
ATTN:
Mr.
W. F.
Conyay
Senior Vice President
- Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-251/88-25)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
P.
G. Stoddart
on August 16-25,
1988..
The inspection
included
a review of,
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings
were
discussed.
with those
members
of your staff
identified in the enclosed
inspection report.'
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the-inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews
. with personnel,
and
observation
of
activities in progress.
The inspection findings indicate that certain activities
appeared
to violate
NRC requirements.
The violation, references
to pertinent
requirements,
and
elements
to be included in your response
are described
in the enclosed
Notice
of Violation.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document'Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
Pub.
L. No.96-511.
SS10i30095
SS0927
ADOCV 05000251
8
PNU
. Flori da
Power and Light Company
Should you have any questions
concerning this letter, please
contact us.
Sincerely,
D.K CG)fin:.
0
Enclosures:
1.
2.
Inspection
Report
cc w/encls:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
. J.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plan't
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
State of Florida
bcc w/encls:
J.
Lieberman, Director,
Office of Enforcement
G.
E. Edison, Project Hanager,
Project
Directorate II-2, Division of Reactor
Projects,
.
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
Douglas
N. Collins, Chief
Emergency
Preparedness
and
Radiological Protection
Branch
Division of Radiation Safety
and Safeguards
RI I
'
RI I
I
PStochdart
8 anle
1 en)aF
9/p/88
/>>/88