Text
gA~ "~n 4
P0 OO O~
+n gO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 5, 1988 Docket Nos.
50-250 and 50-251 LICENSEE:
Florida Power and Light Company FACILITY:
Turkey Point Units 3 and 4
SUBJECT:
SUMMARY
OF MEETING HELD WITH FLORIDA POWER AND LIGHT COMPANY (FP&L) ON SEPTEMBER 13, 1988 REGARDING TECHNICAL SPECIFICATIONS CONVERSION
REFERENCE:
TAC Numbers 63038 and 63039 A meeting was held in Rockville, Maryland on September 13, 1988 with representatives of Florida Power and Light Company (FP&L) to discuss details of their Technical Specifications Revision Project.
This project is a
voluntary effort by FP&L to upgrade their approved Technical Specifications (TS) toward Standard TS to the extent practical.
An initial proposal was submitted by FP&L to the NRC staff on September 29, 1986, followed by the electrical portion on November 28, 1986, with the expectation that detailed discussions with the staff would result in substantial changes to the
- proposal, and therefore result in a completely revised submittal for NRC staff review.
Previous meetings on this subject were held November 18,
- 1986, June 17 and 18, 1987, January 9, February 23, March 28, and August 25, 1988.
This recent meeting focussed on:
(1) FP&L's efforts to provide comment on the staff's "Proof and Review" draft of the revised TS, and (2) the schedule for completion of the TS revision and issuance of a license amendment.
FP&L indicated they had completed review of about half the 356 pages in the "Proof and Review" draft (P/R) sent to them on June 9, 1988 for comment.
The licensee stated that their comp.lete set of comments on the P/R had been delayed but would be submitted by November 4, 1988; they were originally due July 8.
The licensee proposed a
new schedule (enclosed) for completion of technical work and issuance of a license amendment with revised TS.
The new schedule calls for a final revised license amendment submiztal by FP&L by February 17, 1989, followed by review and amendment issuance by NRC by March 31, 1989.
The NRC staff indicated that the 6 weeks allotted by FP&L for NRC to complete a Safety Evaluation and a
No Significant Hazards Analysis, and to process an amendment was not enough time.
The required NRC staff time is uncertain because the amendment is unusually large.
However, it is estimated that the time required could be at least 3 months.
un/
88101 CK pg000250 gpss 8p 88i005 PDR
~>
pDC P
FP5L proposed to separate the electrical portion of the TS (section 3.8) and process it separately in order to expedite it.
The NRC staff agreed with that approach.
FPSL stated they expect to submit the electrical portion by about October 13, 1988.
FPSL also indicated the fire protection TS would be revised towards Standard TS similar to other sections of the TS.
Eventually the fire protection TS wi 11 be relocated to a different document.
FPIIL also described the approach they are taking on selected TS.
An agenda and attendance list for the meeting, along with the revised schedule proposed by FPSL, are enclosed.
Origi'nal signed by Gordon E. Edison, Sr. Project Manage Project Directorate II-2 Division of Rector Projects I/II
Enclosures:
As stated cc w/enclosures:
See next page DISTRIBUTION NRC Im Local PDRS PD22 H. Berkow G. Edison OGC-Rockville E. Jordan S.
Varga NRC Participants ACRS (10)
B. Tros kos ki G. Lainas C.
Moon B. Wilson R-II D I-22 er
/g/88 PM: PDI I-2 D:
GEdison/jd HBe ow 10/g/88 10/+/88
Mr. W. F.
Conway Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. J.
Odom, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 P lant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.0.
Box 029100 Miami, Florida 33102
ENCLOSURE 1
REVISE D TECHNICALSP ECIFICATIONS
=: SEPTEMBER 13, 1988 AGENDA
~
introduction J. E. Cross Revised Technical Specifications Schedule Process Status
~r p/@~eke~
Electrical Technical Specifications Revised Technical Specifications License Amendment to Current Technical Specifications I
Parameters Verification Process Allowable Values l40 Slghifieayv} Qa~dt &+<~'~~
Other Topics Surveillance intervals PNSC and CNRB Fire Protection Reporting Requirements
~
Closing Remarks J. Arias, Jr.
P. L. Pace B. P. Burdick
- g. l.'Evade c.k
, J. Arias, Jr.
J. S. Odom
Enclosure 2
Attendance at Meeting Held September 13, 1988 in Rockvi lie, MD. to Discuss the FPSL Tech Spec Upgrade for Tur key Point NAME ORGANIZATION G.E.
Edison H.N. Berkow G.C. Lainas S.
Varga E. Rossi E. Butcher R.
Emch K. Eccleston P.L.
Pace J. Arias, Jr.
J.
Cross J.
Odom J.
Hosmer E. Rossi B.P. Burdick M. Schoppman D.A. Chancy F.
H. Southworth NRC/NRR LICENSING NRC/NRR PD II-2 NRC/NRR ADR II NRC/DRP NRC/DOEA NRC/DOEA/OTSB NRC/DOEA/OTSB NRC/0 RPI/I I/TA FPL NUC.
LICENSING SUPERVISOR RTS PROJECT MANAGER FPL - PLANT MANAGER FPL - SITE VICE PRESIDENT FPL - DIRECTOR NUCLEAR ENGINEERING NRC/DOEA FPL - ENGINEERING FPL -
NUCLEAR LICENSING FPL - DIRECTOR LICENSING FPL - TECHNICAL
ENCLOSURE 3
REVISED TECHNICALSPECIFICATION SCHEDULE 11/4/88 1/6/89 2/17/89 3/3/89 3/31/89
{9 Weeks)
{6Weeks)
(2 Weeks)
(4 Weeks)
~
FPL Issues P&R Comments to NRC
~
FPL/NRC Resolution of P&R Comments
~
~
NRC Develops Shotly
~
NRC Issues License Amendment
~
NRC Issues Final Draft RTS
~
QA Certification
~
Develop Parameter Matrix
~
Revise NSHE's
~
Revise CTS/RTS XREF
~
PNSC/CNR8 Approval
~
FPL Submits Amendment 4 RTS1:1.md-09'12/88