Forwards Insp Repts 50-250/88-23 & 50-251/88-23 on 880815-19.No Violations or Deviations Noted
ML17345A451
Person / Time
Site: Turkey Point  
Issue date: 09/28/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A452 List:
References
NUDOCS 8810120391
Download: ML17345A451 (6)


See also: IR 05000250/1988023

Text

Y'ACCESSION NBR:8810120391

DOC.DATE: 88/09/28

NOTARIZED:

NO

ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power

and Light C

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light

C

AUTH.NAME

AUTHOR AFFILIATION

HERDT,A.R.

Reg'ion 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Florida Power

& Light Co.

DOCKET

05000250

05000251

SUBJECT:

Forwards

Insp Repts

50-250/88-23

S 50-251/88-23

on 880815-19

No violations or deviations

noted.

DISTRIBDTION CODE:

IEOID

COPIES

RECEIVED:LTR

(

ENCL J

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10'RR/DRIS

DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RES/DSIR

DEPY

II

RNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDISONPG

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERMAN,J

I'ERRfln'R-

RGN2

FILE

01

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

i

BEP P819BB

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr.

W.

F.

Conway'enior

Vice President

Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-250/88-23

AND 50-251/88-23

This refers

to

the Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by

R. Bernhard

on August 15-19,

1988.

The

inspection

included

a

review of

activities

authorized

for your Turkey Point facility.

At the conclusion

of

the inspection,

the findings were discussed

with those

members

of your'staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the inspection,

no violations or deviations

were identi-

fied.

Your attention

is invited to the unresolved

item identified in the inspection

Feport.

This matter will be pursued during future inspections.

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

wi 11

be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact vs

Si cerely,

Alan R.

erdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC .Inspection

Report

cc w/encl:

(See

page

2)

8810i2039f

880928

~

PDR

ADQCN 05000250'

PNU

SEP 28 1988

Florida Power

and Light Company

cc w/encl:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias,'r., Regulatory

and Compliance

Suoervisor

'State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

DRS Technical Assistant

RII

RBernhard:ser

09/'

/88

RII

FJap

'9/gP/88

R

1 njak

09

/88

/t

g Ih

~ l\\