Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348A723 + (15:03:44, 7 January 2025)
- L-90-379, Advises of Hiring Freeze Until Staffing Study of long-term Personnel Needs Completed + (15:03:45, 7 January 2025)
- IR 05000250/1990034 + (15:03:49, 7 January 2025)
- ML17348A719 + (15:03:51, 7 January 2025)
- IR 05000250/1990031 + (15:03:54, 7 January 2025)
- ML17348A716 + (15:03:56, 7 January 2025)
- ML17348A713 + (15:03:57, 7 January 2025)
- L-90-380, Submits Implementation Status,Per Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Generic Implications of Salem ATWS Events. Summary of Actions Completed Listed + (15:03:58, 7 January 2025)
- L-90-374, Advises of Change in Schedule for Installation of Area Radiation Monitoring Sys,Per Reg Guide 1.97 + (15:04:00, 7 January 2025)
- ML17348A710 + (15:04:00, 7 January 2025)
- ML17348A706 + (15:04:03, 7 January 2025)
- ML17348A628 + (15:04:04, 7 January 2025)
- ML17348A695 + (15:04:04, 7 January 2025)
- ML17348A624 + (15:04:05, 7 January 2025)
- ML17348A623 + (15:04:06, 7 January 2025)
- ML17348A622 + (15:04:06, 7 January 2025)
- L-90-370, Requests Cancellation of Interim Tech Spec Implementation Procedure 0-ADM-021,per Util + (15:04:07, 7 January 2025)
- 05000250/LER-1990-019, :on 901003,alarm Received on Control Room Annunciator X-7/6 Indicating Heat Tracing Trouble.Caused by Inadequate Work Control.Boric Acid Transfer Pumps Aligned & Event Discussed W/Shift Supervisor + (15:04:10, 7 January 2025)
- L-90-358, Forwards Final Summary Rept for IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys + (15:04:11, 7 January 2025)
- L-90-371, Special Rept Re Listed Fire Barrier Penetrations Not Returned to Functional Status within 7 Days + (15:04:12, 7 January 2025)
- IR 05000250/1990026 + (15:04:15, 7 January 2025)
- 05000250/LER-1990-018, :on 900917,unit Missed Fire Protection Surveillance on Switchgear Room Louver Sprays + (15:04:24, 7 January 2025)
- 05000250/LER-1988-026, :on 881107,unit Violated FSAR Design Requirements Re Hurricane Flood Protection + (15:04:26, 7 January 2025)
- L-90-362, Responds to Violations Noted in Insp Repts 50-250/90-30 & 50-251/90-30 Re Changes to Master Calibr Sheet.Corrective Actions:Maint Instruction 102.114 Revised + (15:04:27, 7 January 2025)
- ML17348A610 + (15:04:30, 7 January 2025)
- L-90-363, Monthly Operating Repts for Sept 1990 for Turkey Point Units 3 & 4 + (15:04:31, 7 January 2025)
- TAC:77633 + (15:04:33, 7 January 2025)
- ML17348A605 + (15:04:34, 7 January 2025)
- L-90-369, Responds to SALP Insp Repts 50-250/90-26 & 50-251/90-26,per NRC .Licensee Will Continue Program to Improve Operation & Maintain Activities at Plant + (15:04:35, 7 January 2025)
- ML17348A603 + (15:04:37, 7 January 2025)
- ML17348A602 + (15:04:39, 7 January 2025)
- 05000251/LER-1990-010-01, :on 900910,Tech Spec 3.0.1 Entered Due to Train B Undervoltage Protection Circuit Being Inoperable + (15:04:40, 7 January 2025)
- L-90-350, Forwards Info Re Status of PEP-4 Unresolved/Inspector Followup Items in Design Validation Insp Repts 250/89-203 & 50-251/89-203 + (15:04:41, 7 January 2025)
- L-90-352, Lists Util Commitments Re Emergency Power Sys Enhancement Outage,Per 900717 Meeting + (15:04:43, 7 January 2025)
- ML17348A596 + (15:04:46, 7 January 2025)
- ML17348A593 + (15:04:47, 7 January 2025)
- ML17348A594 + (15:04:47, 7 January 2025)
- L-90-322, Application for Amends to Licenses DPR-31 & DPR-41,revising Section 6.0 by Adding More General Organizational Titles + (15:04:48, 7 January 2025)
- ML17348A589 + (15:04:50, 7 January 2025)
- L-90-345, Forwards 6-month Integrated Schedule Regulatory Rept for Facilities for Aug 1990 + (15:04:51, 7 January 2025)
- L-90-346, Notifies of Change in Start Dates of Third Inservice Insp Period to Begin When Dual Unit Outage Commences + (15:04:52, 7 January 2025)
- ML17348A586 + (15:04:55, 7 January 2025)
- ML17348A584 + (15:04:56, 7 January 2025)
- L-90-333, Forwards Unsatisfactory Performance Testing Incident Rept, Per 10CFR26,App A.2.8(e)(4) + (15:04:57, 7 January 2025)
- L-90-211, Informs That Util Will Not Replace,But Will Retube Component Cooling Water Hxs,Per Generic Ltr 89-13 + (15:04:58, 7 January 2025)
- L-90-336, Forwards Response to Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components + (15:05:00, 7 January 2025)
- L-90-347, Advises That Emergency Plan Exercise Scheduled on 901108 & Will Involve Participation by Local & State Agencies + (15:05:03, 7 January 2025)
- ML17348A579 + (15:05:03, 7 January 2025)
- ML17348A575 + (15:05:05, 7 January 2025)
- L-90-338, Comments on 900615 Safety Evaluation Re Station Blackout Rule 10CFR50.63.Confirms That on Emergency Diesel Generator Capable of Maintaining Both Units in Hot Standby Condition for Eight Hour Duration + (15:05:06, 7 January 2025)
- 05000251/LER-1990-009-01, :on 900710,action Requirement of Tech Spec 3.3.1 Re Containment Airlock Pressure Test Not Met.Caused by Work Control Deficiencies.Computer Program Updated to Print Caution Statement on Work Orders + (15:05:08, 7 January 2025)