ML17348A610

From kanterella
Jump to navigation Jump to search
Requests Analyses of Liquid Samples Spiked W/Radionuclides Be Completed within 60 Days of Sample Receipt
ML17348A610
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/12/1990
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 9010260032
Download: ML17348A610 (6)


Text

QCT yp 1SSO Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg Executive Vice President - Nuclear P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

. DOCKET NOS.

50-250 AND 50-251 As part of the NRC Confirmatory Measurements

Program, liquid samples spiked with radionuclides will be sent to the Turkey Point facility for radiochemical analyses.

'These samples are to be analyzed for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are normally performed by a vendor, this, vendor should be used to analyze the spiked samples.

The spiked

samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory, withi,n approximately 30 days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples.

Results should be sent to:

U.S.

Nuclear Regulatory Commission, ATTN:

Mr.

D.

M. Collins.

Our evaluation of your results will be discussed with your staff and transmitted in a letter.

Spiked samples will be sent to you on an annual basis as part of-our routine inspection program.

If you have any questions regarding this

program, please contact Ms.

Susan S.

Adamovitz 'at 404-331-4774 or Mr. Thomas R. Decker at 404-331-2559.

cc:

(See page 2)

Sincerely, oaieqw siG~~ ~~

DOUGLAS IA: CCRL8 S Oou'glas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards 9010260032 901012 PDR ADQC)( 95000250 P

PNU

0

'e Florida Power and Light Company CC:

K. N. Harris, Vice President Turkey Point Nuclear Plant P. 0.

Box 029100

Miami, FL 33102 J.

E. Cross, Plant Manager Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 L.

W. Bladow Plant gA Superintendent Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 D. Powell, Regulatory and Compliance Supervisor Turkey Point Nuclear Plant P.

0.

Box 029100 Miami, FL 33102 Harold F.

Rei s, Esq.

Newman and Holtzinger, P.C.

1615 L Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel-,

Hector and Davis 4000 Southeast Financial Center

Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 332304 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahssee, FL'2399-0700 Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, FL 32304 (cc cont'd See page 3)

Florida Power and Light Company (cc cont'd)

Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, FL 32301 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Intergovernmental Coordination and Review Office of Planning and Budget Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 R. Steinke Chemistry Supervisor Turkey Point Nuclear Power Plant P.

O.

Box 029100

Miami, FL 33102 State of Florida bcc:

G.

E. Edison, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission P. 0.

Box 1148 Homestead, FL 33090 RIj PRSS t

DJones 7/I&/90 RII:DRSS T.Decker 7/ ~/90 R

9RP RCrlenjak

'/F90