OFFICIAL COPY
Docket Hos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN: 'r.'.
H. 'Goldberg
President - Nuclear D'ivision
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-250/90-30
and 50-251/90-30)
This refers
to the inspection
conducted
by
R.
C. Butcher of this office on
August
4 through
August
31,
1990.
The
inspection
included
a review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed report.
Areas
examined
during
the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selected
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of
activities in progress.
The inspection
findings indicate that certain activities appeared
to violate
NRC requirements.
The violation, with pertinent references
and elements
to be
included in your response,
are described
in the enclosed
Notice.
You are required to respond
to this letter
and should follow the instructions
specified
in the
enclosed
Notice
when
preparing
your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent
recurrence.
After reviewing your response
to this
Notice, including your proposed
corrective
actions
and the results
of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
Florida Power
and Light Company
gr-> 81 3990
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
.Enclosures;
1.
2.
NRC Inspection
Report
,cc w/encls:
K. N. Harris, Senior Vice President
Nuclear Operations
P. 0.
Box 029100
Miami, Fl
33102
L.
W. Pearce,
Plant Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, Fl
33102
L.
W. Bl adow,
equal
ity Manager
Turkey Point Nuclear Plant
P. 0.
Box 029'100
Miami, Fl
33102
ORlQWAL SIGNED
HY
tACV)N V. SINKULE
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of,Reactor
Projects
a
D. Powell, Superintendent,
Plant Licensing
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, Fl
33102
Harold F. Reis,
Esq.
Newman
and Holtzinger,
P.C.
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector
and Davis
4000 Southeast
Financial
Center
Miami, Fl
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
Fl
32304
(cc w/encls cont'd
page
3)
0
Florida Power
and Light Company
(cc w/encls cont'd)
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative
Services
1317 Winewood Boulevard
Tallahassee,
Fl
32399-0700
Jack Shreve
Office of the Public Counsel
Room 4, Holland Building
.Tallahassee,
Fl
32304'dministrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahassee,
Fl
32301
Joaquin
Avino
County Manager of Metropolitan
Dade County
111
NW 1st Street,
29th Floor
Miami, Fl
33128
Inter governmental
Coordination
and Review
Office of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
Fl
32301
State of Florida
bcc w/encls:
G.
E. Edison,
LPM
Document Control
Desk
DRP Section Chief
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
P.O.
Box 1448
Homestead,
Fl
33090
RI
R chin
09/ ~i/90
RII:DRS
..'"
LWatson
j'9/;;/90
RQI: DQS
TPeebles
09/ ;/90
RI
D
RC lenjak
09~ (/90
ENCLOSURE
1
Florida Power and Light Company
Turkey Point Urlits 3 and
4
Docket Nos. 50-250,
50-251
License
Nos'.
DPR-41-
During
an
NRC inspection
conducted
on August
4 through August 31,
1990,
a
violation of
NRC requirements
was identified.
In accordance
with the "General
Statement
of Policy and Procedure
for NRC Enforcement Actions,"
10
CFR Part. 2,
Appendix
C (1990), the violation is listed below:
TS 6.8. 1 requires
that written procedures
and administrative
policies
shall
be established,
implemented,
and maintained that meet or exceed
the
requirements
and
recommendations
of Appendix
A of USNRC Regulatory
Guide
1.33
and Sections
5. 1
and 5.3 of ANSI N18.7-1972.
Section
5. 1 of ANSI
N18.7-1972Property "ANSI code" (as page type) with input value "ANSI</br></br>N18.7-1972" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.
requires
that administrative policies
be provided to control
the
issuance
of documents,
including changes,
that prescribe activities
affecting safety-related
structures,
systems,
or components.
Contrary
to the
above,
administrative policies
were not established
to
control
changes
to the master
instrument calibration data
sheet for Unit 4
pump automatic start
pressure
switch,
PC-4-611,
in that
procedures
did not address
changes
to the
instrument calibration data
sheets.
In
January,
1988, the required
and actual
setpoints for PC-3-611
and PC-4-611
were
changed
from 75.0
+ 1.5 psig to 60.0
+ 1.5 psig but the related
instrument
calibration
data
sheets
were
not
changed.
Subsequently,
PC-4-611
was
moved
and then improperly calibrated
to 75.0
+ 1.5 psig using
the instrument calibration
data sheets.
As
a result,
on July 26,
1990,
the Unit
4A
pump improperly automatically started
due to pressure
switch PC-4-611
being set at the wrong value.
This is
a Severity Level
IV Violation (Supplement
1).
Pursuant
to the provisions of 10 CFR 2.201, Florida Power
and Light Company is
hereby
required
to submit
a written statement
or explanation
to the Nuclear
Regulatory Coomission,
ATTN:
Document Control
Desk, Washington,
DC 20555; with
a copy to the Regional Administrator,
Region II, and if applicable,
a copy to
the
NRC
Resident
Inspector,
within
30
days
of the
date
of the letter
transmitting this Notice.
This reply should
be clearly marked
as
a "Reply to a
Notice of Violation" and should include for each violation:
( 1) the reason for
the violation, or, if contested,
the basis for disputing the violation, (2) the
corrective
steps
that
have
been
taken
and
the results
achieved,
(3)
the
corrective
steps
that will be taken to avoid further violations,
and
(4) the
date
when full compliance will be
achieved.
If an
adequate
reply is not
received within the time specified in this Notice,
an order
may be issued to
Power
and Light Company
2
~
Turkey Point Units
3 and
4
Docket Nos. 50-250,
50-251
License
Nos.
show cause
why the license
should not be modified,
suspended,
or revoked,
or
why such other action
as
may
be proper should not
be taken.
Where
good cause
is shown, consideration will be given to extending
the response
time.
FOR THE NUCLEAR REGULATORY COMMISSION
Dated at Atlanta, Georgia
this 21st
day of September
1990
Vce
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects