Board Notification 90-010:forwards GE Edison to Jh Goldberg,Providing Corrected Pages 3/4 3-26 & 3/4 3-27 to Amends 137 & 132 to Licenses for Plant Issued on 900828. Svc List Encl
ML17348A575
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/1990
From: Berkow H
Office of Nuclear Reactor Regulation
To:
CENTER FOR NUCLEAR RESPONSIBILITY, JOINT INTERVENORS - TURKEY POINT, NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP), PENNSYLVANIA POWER & LIGHT CO.
References
CON-#490-10860, TASK-AS, TASK-BN90-010, TASK-BN90-10 BN-90-010, BN-90-10, OLA-5, NUDOCS 9010030172
Download: ML17348A575 (3)


Text

~P,g AEgIJ

~ 'c~

~

0 Oo

+>>*<<+

Docket: IIos.

50-250-OLA-5 and 50-251-OLA-5 t

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 September 26, 1990 Board Notification 90-10 MEMORANDUM FOR:

Atomic Safety and Licensing Appeal Panel and all Parties FROM:

SUBJECT:

Herbert N. Berkow, Directov Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation NEW INFORIIATION POTENTIALLY RELEVANT AND MATERIAL TO BOARD PROCEEDING IN THE MATTER OF TURKEY POINT NUCLEAR PLANT, UNITS 3 AND 4

,In conformance with the Commission's policy on notification of Licensing Boards, Appeal Boards or Commission of new, relevant, and material information, this memorandum calls attention to the document discussed below.

On August 28, 199G, the staff issued Amendment Nos.

137 and 132 for Turkey Point, Units 3 and 4, respectively.

These amendments replaced the entire current custom Technical Specifications (TS) with a set of revised Technical Specifications which are based on the Standard Technical Specifications for Westinghouse-designed plants.

Through an administrative error, the wrong pages were included in Amendment Nos.

137 and 132 for pages 3/4 3-26 and 3/4 3-27.

On September 14, 1990, the staff issued a letter to the licensee which provided the corrected pages (enclosed).

The letter is being brought to the attention of the Board as information which may be relevant and material to issues pending before the Board.

Enclosure:

Letter dated 9/14/90 cc w/enclosure:

See attached list 9010030172 900926 PDR ADOCK 05000250 P

PDR rbert N. Berkow, Director roject Directorate II-2 Division of Reactor Projects - I/II Office"of Nuclear Reactor Regulation JIIII5

'Igy

Board Notification 90 10 dated September 26, 1990 CC:

J. Taylor, EDO J. Sniezek, DEDR H. Thompson, DEDS T. Hurley, NRR F. Miraglia, NRR J. Partlow, NRR W. Russell, NRR S. Ebneter W. Parler, OGC L. Chandler, OGC SECY (3) (C. Cater)

ASLAB Panel Office of the General Counsel ASLB Panel NRR Division Directors NRR PDs NRR BCs ACRS (3)

CC Geo'r'ge C. Anderson Administrative Judge 7719 Ridge Drive, N.E.

Seattle, Washington 98115 Peter B. Bloch, Chairman Administrative Judge Atomic Safety and Licensing Board Panel EW-439 John T. Butler, Esq.
Steel, Hector

& Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Steven P. Frantz, Esq.

Harold F. Reis, Esq.

Newman 5 Holtzinger 1615 L Street, NW, Suite 1000 Washington, DC 20555 Stewart Ebneter Regional Counsel USNRC, Region II 101 Marietta Street, NW Suite 2900 Atlanta, Georgia

'30303 V

Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory P.O.

Box 2008, Bethel Valley Road Building 3500, Mail Stop 6010 Oak Ridge, Tennessee 37831 Thomas J. Saporito, Jr.

1202 Sioux Street

Jupiter, Florida 33458 Nuclear Energy Accountability Project P.O.

Box 129

Jupiter, Florida 33458-0129 Adjudicatory File (2)

Atomic Safety and Licensing Board Panel Docket EW-439 Atomic Safety and Licensing Board Panel EW-439 Atomic Safety and Licensing Appeal Panel EW-525 Office of the Secretary (2) 16-G-15